Zhiyuan Chen

Dr. Zhiyuan Chen


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2023 in Production and Operations Management
Verified
Journal Article
Closed access
ZCZhiyuan Chen
Zhiyuan Chen
GKGuangwen Kong
Guangwen Kong

19 January 2019 in Journal of the Operational Research Society
Verified
Journal Article
Closed access
LXLei Xiao
Lei Xiao
MXMinghui Xu
Minghui Xu
ZCZhiyuan Chen
Zhiyuan Chen
XGXu Guan
Xu Guan
We investigate a seller’s equilibrium pricing strategies under two classic advance selling pricing schemes. Under the dynamic pricing scheme, the seller sequentially decides his retail prices, while under the price commitment scheme, the seller simultaneously offers his retail prices. The consumers arrive sequentially depending on their awareness of advance selling, and a consumer’s valuation of the purchase is jointly determined by the inherent quality of the product and her private fitness of the product. However, both factors are uncertain in the advance period but can be resolved in the spot period. We show that under dynamic pricing, the flexibility of pricing does not necessarily lead to a higher payoff as it may also reduce the consumers’ willingness-to-buy in the advance period. Therefore, when consumers’ fitness differentiation is low, dynamic pricing becomes dysfunctional compared to non-advance selling. Under the price commitment scheme, although the seller suffers the risk of quality uncertainty by ex-ante determining the retail price, he can also strategically induce more consumers to buy in advance by claiming a high spot price. When the consumer fitness differentiation is low and the consumer’s awareness of advance selling is high, price commitment scheme dominates dynamic pricing scheme.

15 November 2018 in International Journal of Production Research
Verified
Journal Article
Closed access
WXWeili Xue
Weili Xue
YHYulin Hu
Yulin Hu
ZCZhiyuan Chen
Zhiyuan Chen
We investigate the value of buyback contract by analysing a supply chain with one manufacturer and two competing retailers. Three scenarios, depending on whether buyback contracts are offered to neither, one, or both of the retailers, are considered. We first study the case when the manufacturer can only determine his buyback price. We show how the demand uncertainty, the competition level and the handling cost of buyback contract influence the profits of the manufacturer, the two retailers and the whole supply chain. Interestingly, contrary to the conventional wisdom that the buyback contract may intensify competition between the retailers, we show that offering the buyback contract to two competing retailers can benefit every channel member even if the competition level is high. Next, we study the return contract, a special type of buyback contract, and show the effect of competition level and industry outlook on supply chain parties' choices on return contract. We extend Padmanabhan and Png [1997. “Manufacturer's Returns Policies And Retail Competition.” Marketing Science 16 (1): 81–94] to the case with an asymmetric contract structure, i.e. one return contract and one whole-sale contract. We show that an asymmetric contract structure may better off both the retailers and the whole supply chain.

1 June 2020 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MYMin Yao
Min Yao
FWFang Wang
Fang Wang
ZCZhiyuan Chen
Zhiyuan Chen
HYHanrui Ye
Hanrui Ye
As a prevalent problem for construction projects, contractor cost details are unobserved or unknown to the owner. This paper considers a risk-averse owner (he) who engages a risk-neutral contractor (she) to complete a project when the contractor’s overtime cost information is unknown to the owner. The owner designs a menu of incentive contracts for the contractor to choose/to negotiate with the contractor to maximize his profit. The incentive payment is determined by the saved time relative to the predetermined deadline. We provide optimal incentive contract menus under symmetric and asymmetric information settings, respectively. Moreover, by comparing the terms of optimal incentive contracts under both information settings, we find that even though the duration of a low-cost contractor will not change with the information setting. However, the owner has to pay more to induce the low-cost contractor to choose the appropriate contract under the asymmetric information setting. Meanwhile, the high-cost contractor receives less payment and completes the project later under the asymmetric information setting. In addition, we find the value of information increases with the level of risk aversion and the gap of costs, and is concave with respect to the probability of high-cost type or that of low-cost type. Finally, we use real data to verify our theoretical findings.

20 July 2018 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
ZCZhiyuan Chen
Zhiyuan Chen
JLJianbin Li
Jianbin Li
ZLZhixin Liu
Zhixin Liu
ZZZhong Zheng
Zhong Zheng
We consider a supply chain consisting of a supplier and a buyer. The buyer faces demand as a function of the selling price. There is risk of supply disruption, but the supplier can rebuild his capacity if he has invested for the capacity restoration before a disruption. To motivate the supplier to invest, the buyer can use one of two incentive contracts, namely direct and indirect. With a direct contract, the buyer provides a financial subsidy to share the supplier’s capacity restoration cost when disruption occurs. With an indirect contract, the buyer adjusts the wholesale price in the case of disruption to stimulate the capacity restoration. Both contracts allow the buyer to adjust the order quantity in the case of disruption. We analyze decisions of each supply chain member under the two contracts with different commitment strategies (the ex ante commitment (EA) strategy under which the contract is signed before disruption and the ex post commitment (EP) strategy under which the contract is signed after disruption), and study how the supply disruption affects the buyer’s selling price to end customers. We show that, from the perspective of either the supplier or the buyer, the incentive contract under the EA strategy is preferred by leading to a greater profit. Further, through numerical experiments, we recognize conditions for the fixed investment cost, probability of disruption, and regular wholesale price, under which each incentive contract encourages the supplier to invest for the capacity restoration, and brings greater profit to each supply chain member.

25 March 2024 in Journal of Systems Science and Complexity
Verified
Journal Article
Closed access
PDF file
JLJianbin Li
Jianbin Li
ZHZhouxin Hang
Zhouxin Hang
ZCZhiyuan Chen
Zhiyuan Chen
SXShan Xiao
Shan Xiao