Purpose: Demand Driven Material Requirements Planning (DDMRP) aims to deal with variability by adjusting inventory levels while maintaining, or even increasing, customer service levels. This approach bridges the push and pull approaches. Even though it first made its appearance in 2011, research in this field remains relatively limited. This paper aims to measure the spatiotemporal evolution of the DDMRP, its scope and context of implementation, and the research lines studied in that field in order to identify areas that still need to be addressed by future researchers.Design/methodology/approach: The systematic literature review approach adopted in this paper examines research dealing with the DDMRP approach published in different languages between 2009 and 2020. To-date papers focused on the performance analysis and comparison, what differentiates this study is the focus on the scientific evolution level of DDMRP, the parameters, and contexts that should be more studied.Findings: The results show that DDMRP is not yet a mature method and that the robustness of the approach still needs to be tested. More research is also required to determine scientifically some setting parameters, how the proposed DDMRP could be implemented in different industrial contexts with existing information systems.Originality/value: Based on the evolution analysis of DDMRP, this study outlines its current state of maturity and its different shortcomings under a broader vision to make this method more complete on the scientific and industrial level.
12 August 2022 in International Journal of Production Research
Like Kanban or classic inventory management, Demand Driven Material Requirements Planning (DDMRP) assumes that an order is created when the stock level drops below a given level. The assessment of this level can be continuous or periodic. A periodic evaluation can force better repartition of the load over time. DDMRP characterizes the demand for a product by its average daily demand. This aggregation specifies neither the average size of the elementary demands nor the average duration between two elementary demands. Based on a discrete event simulation model, this study suggests that, at least for a flow-shop organization, the DDMRP method, with continuous order generation, is suitable for large mean time between elementary orders, while periodic observation improves the method for small values of it.
6 January 2023 in International Journal of Production Research
Production planning and scheduling for companies with divergent processes, where a single component can be transformed into several finished products, are challenging as planners might face material misallocation issues. In this paper, we address the problem of managing a divergent process with DDMRP stock buffers, where different finished products are bottled with the same component having a fixed batch size. An allocation decision needs to be made to determine the quantities of finished products to be bottled. This study is motivated by a real-life problem faced by a dermo-cosmetic company. We compare and analyze by simulation nine different policies triggering allocation decisions. The first policy is the classic DDMRP rule, while the others are new policies, including a virtual buffer of a generic finished product and ConWIP loops, delaying the allocation decision. Our results show that the policy combining the classic DDMRP rule and a ConWIP loop surrounding a part of the process reduces the work-in-process by 34% compared to the classic DDMRP while ensuring high customer service rates and control of flow times.
24 December 2021 in International Journal of Production Research
Demand Driven Material Requirements Planning (DDMRP) is a recent method mixing push and pull flow management. Although it claims to be the solution to traditional methods’ limitations, the DDMRP method works at infinite capacity: manufacturing or supply orders are launched according to a logic of replenishment of stocks defined as buffers. This article proposes an evaluation of capacity management using visual charts developed by simulation. These charts correlate the bottleneck resource's loading rate to a service rate by considering one of the DDMRP method parameters, the Decoupled Lead Time (DLT). The charts are a decision support tool. They allow identifying to which loading rate the DLTs are representative of the flow times of manufacturing orders and which capacity level to use. We study different workshops, including a real industrial case. Our results show that it is better to control the flow times by adjusting capacity rather than adjust the DLT parameter.
Home care centers face both an increase in demand and many variations during the execution of routes, compromising the routes initially planned; robust solutions are not effective enough, and it is necessary to move on to resilient approaches. We create a close-to-reality use case supported by interviews of staff at home health care centers, where caregivers are faced with unexpected events that compromise their initial route. We model, analyze, and compare two resilient approaches to deal with these disruptions: a distributed collaborative approach and a centralized collaborative approach, where we propose a centralization and sharing of information to improve local decision-making. The latter reduces the number of late arrivals by 11%, the total time of late arrival by 21%, and halves the number of routes exceeding the end of work time (contrary to the distributed collaborative approach due to the time wasted reaching colleagues). The use of a device, such as a smartphone application, to centralize and share information thus, allows better mutual assistance between caregivers. Moreover, we highlight several possible openings, like the coupling of simulation and optimization, to propose a more resilient approach.
13 May 2024 in Journal of Industrial Engineering and Management
Purpose: Although the authors of the Demand Driven Material Requirements Planning (DDMRP) argue that the method DDMRP is the solution to the limitations of traditional production management methods, its capacity management system remains unclear. Since DDMRP operates at infinite capacity, it is important to consider a capacity management approach to avoid under- or overloading production workshops.Design/methodology/approach: We propose a new dynamic capacity management approach for the DDMRP method. Our approach is based on the calculation of the anticipated workload, using DDMRP stock buffers and considering customer order spikes. Considering a real industrial case, we compare the proposed approach to a static one and a dynamic approach from the literature.Findings: The analysis of the results, supported by a two-way ANOVA, indicates that the proposed capacity management approach outperforms the performance of the other two approaches by maximizing the resource loading rate while ensuring a high customer service level.Originality/value: The originality of the article comes on the one hand from the capacity adjustment module by calculating the anticipated workload, and on the other hand from the comparison of this approach with two others, one of which comes from the literature.