This study aims to evaluate the Green Supplier Development Programs (GSDPs) for greening a supply chain. However, this problem is threatened by restricted quantitative information, the specific context of the organisation, lack of prior experience and varying supplier backgrounds. In this paper, we propose a fuzzy integrated Multi-Criteria Decision-Making approach for investigating and prioritising GSDPs. The approach is developed by integrating fuzzy Decision-Making Trial and Evaluation Laboratory (DEMATEL), fuzzy Analytic Hierarchy Process (AHP) and Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) methods. First, fuzzy DEMATEL is applied to determine the main green factors, then the fuzzy AHP method is used to acquire the local weights of criteria, and finally, the GSDPs are prioritised based on the green factors by fuzzy TOPSIS. The proposed approach is employed to estimate GSDPs of the painting companies. The outcomes indicate that ‘requiring ISO 14,000 certification for suppliers? and ‘building top management commitment for suppliers for green supply practices’ have the highest and lowest impact on improving the environmental performance of suppliers, respectively. It is also concluded that ‘green procurement’ measure has the highest effect on prioritising the GSDPs.
21 October 2020 in Journal of Industrial and Production Engineering
Effective adoption and implementation of green initiatives in greening a supply chain are threatened by several risks. Hence, investigating appropriate responses to mitigate risks is needed by most companies. The aim of this study is to propose a new approach for prioritizing the risks of Green Supply Chain (GSC) in a fuzzy environment. For this purpose, a fuzzy Multi-criteria Decision-Making (MCDM) approach is proposed for which, a systematic methodology is conducted by integrating a fuzzy decision-making trial and evaluation laboratory (DEMATEL) and fuzzy technique for order of preference by similarity to ideal solution (TOPSIS). The proposed approach makes the use of fuzzy DEMATEL in order to evaluate the weights of risk criteria. Then, the responses of GSC’ risks are assessed and ranked based on six main risk categories and 12 criteria. To highlight the real-life applicability of the proposed approach, an empirical case study is conducted.
21 June 2018 in Intelligent Systems in Accounting, Finance and Management
Closed-Loop Supply Chain (CLSC) network design plays a significant role in supply chain performance. The CLSC network design is recognized as a strategic problem which ensures a useful and efficient supply chain management providing an optimal platform. The CLSC network design problem includes two types of decisions, strategic and tactical. This paper aims to determine the location of facilities which is recognized as a strategic decision. In addition, tactical decisions such as the amount of supplied raw material, the level of production, and shipments among the network entities are made through the proposed model. This paper is distinctive by introducing a Mixed Integer Linear Programming (MILP)-based model which simultaneously optimizes the both forward and reverse chains. The model is implemented on a glass manufacturing industry to highlight the importance and applicability of the framework. Moreover, the study provides a comprehensive sensitivity analysis to investigate the effect of parameters such as demand and return rates on strategic and tactical decisions in supply chain network.
1 October 2018 in Sustainable Production and Consumption