Miguel Angel Mateo Pla

Mr. Miguel Angel Mateo Pla

Universitat Politècnica de València, Valencia, Spain
orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2020 in Energy
Verified
Journal Article
Open access
BBBorja Badenes
Borja Badenes
BSBurkhard Sanner
Burkhard Sanner
MPMiguel Angel Mateo Pla
Miguel Angel Mateo Pla
JCJosé Manuel Cuevas
José Manuel Cuevas
FBFlavia Bartoli
Flavia Bartoli
JUJavier F. Urchueguía
Javier F. Urchueguía

1 March 2021 in Sustainable Cities and Society
Verified
Journal Article
Closed access
MPMiguel Angel Mateo Pla
Miguel Angel Mateo Pla
ELEdgar Lorenzo-Sáez
Edgar Lorenzo-Sáez
JLJorge E. Luzuriaga
Jorge E. Luzuriaga
SPSantiago Mira Prats
Santiago Mira Prats
JMJuan A. Moreno-Pérez
Juan A. Moreno-Pérez
LLLenin G. Lemus
Lenin G. Lemus

1 June 2022 in Renewable Energy
Verified
Journal Article
Open access
Hossein JavadiHossein Javadi
Hossein Javadi
Javier UrchueguíaJavier Urchueguía
Javier Urchueguía
BBBorja Badenes
Borja Badenes
MPMiguel Angel Mateo Pla
Miguel Angel Mateo Pla
AGAli Nejad Ghafar
Ali Nejad Ghafar
LLLenin Lemus-Zúñiga
Lenin Lemus-Zúñiga

3 September 2017 in Energies
Verified
Journal Article
Open access
PDF file
BBBorja Badenes
Borja Badenes
MPMiguel Angel Mateo Pla
Miguel Angel Mateo Pla
LLLenin Lemus-Zúñiga
Lenin Lemus-Zúñiga
BMBegoña Sáiz Mauleón
Begoña Sáiz Mauleón
Javier UrchueguíaJavier Urchueguía
Javier Urchueguía
Thermal response test (TRT) is a common procedure for characterization of ground and borehole thermal properties needed for the design of a shallow geothermal heat pump system. In order to investigate and to develop more accurate and robust procedures for TRT control, modelling, and evaluation in semi-permeable soils with large water content, a pilot borehole heat exchanger was built in the main campus of the Universitat Politècnica de València. The present work shows the results of the experiments performed at the site, analysing the improvements that have been introduced both in the control of the heat injected during TRTs and in the methods to infer the ground thermal parameter. Three models are compared: two based on the infinite-line source theory and one based on the finite-line source scheme. The models were tested under two possible configurations of the equipment, i.e., with and without strict control of injected heat. Our results show the importance of heat injection control for a robust parameter assessment and the existence of additional heat transfer processes that the used models cannot completely characterize and that are related to the presence of significant groundwater flow at the site. In addition, our experience with the current installation and the knowledge about its strengths and weaknesses have allowed us to design a new and more complete test-site to help in the analysis and validation of new ground heat exchanger geometries.

19 September 2020 in Energies
Verified
Journal Article
Open access
PDF file
BBBorja Badenes
Borja Badenes
MPMiguel Angel Mateo Pla
Miguel Angel Mateo Pla
TMTeresa Magraner
Teresa Magraner
JOJavier Soriano Olivares
Javier Soriano Olivares
Javier UrchueguíaJavier Urchueguía
Javier Urchueguía
In ground-source heat-pump systems, the heat exchange rate is influenced by various design and operational parameters that condition the thermal performance of the heat pump and the running costs during exploitation. One less-studied area is the relationship between the pumping costs in a given system and the heat exchange rate. This work analyzes the investment and operating costs of representative borehole heat-exchanger configurations with varying circulating flow rate by means of a combination of analytical formulas and case study simulations to allow a precise quantification of the capital and operational costs in typical scenario. As a conclusion, an optimal flow rate minimizing either of both costs can be determined. Furthermore, it is concluded that in terms of operating costs, there is an operational pumping rate above which performance of geothermal systems is energetically strongly penalized.

9 July 2021 in Plant Signaling & Behavior
Verified
Journal Article
Closed access
RZRodolfo Zapata
Rodolfo Zapata
JOJose-Vicente Oliver-Villanueva
Jose-Vicente Oliver-Villanueva
LLLenin Lemus-Zúñiga
Lenin Lemus-Zúñiga
DFDavid Fuente
David Fuente
MPMiguel Angel Mateo Pla
Miguel Angel Mateo Pla
JEJuan Carlos Moreno Esteve
Juan Carlos Moreno Esteve
The temporal evolution of the electrical signal generated by Pinus halepensis was measured in a sample of 15 trees. Weekly experiments were carried out during a long-term campaign lasting over a year, while trials with a high frequency of measurements were also performed during several days. In the latter case, day-night oscillations of the electrical magnitudes were observed. Additionally, punctual meteorological events such as rainfall and electrical storms affect the electrical signal as well. The measured electrical intensity grows exponentially with the voltage. In fact, no electrical intensity that exceeds the threshold of 0.01 μA is gathered when voltage values are lower than 0.6 V. In general, higher electrical signals were gathered during the rainy seasons with moderate temperatures; while very low signals, including few measures of zero intensity, were obtained during the most stressful periods over the year, mainly by mid-summer. There is a strong correlation between the rainfall and the electrical signal. The rain-intensity correlation, together with sustained intensity values during the reproductive period in spring, suggests that this electrical magnitude could be an indicator of the physiological state of the tree and thus used for in situ and minimally invasive forest monitoring.