Mahyar Ghoroqi

Dr. Mahyar Ghoroqi

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 November 2017 in Engineering with Computers
Verified
Journal Article
Closed access
PDF file
Manoj KhandelwalManoj Khandelwal
Manoj Khandelwal
AMAminaton Marto
Aminaton Marto
SFSeyed Alireza Fatemi
Seyed Alireza Fatemi
Mahyar GhoroqiMahyar Ghoroqi
Mahyar Ghoroqi
DADanial Jahed Armaghani
Danial Jahed Armaghani
OTOmid Tabrizi
Omid Tabrizi

3 August 2017 in Environmental Earth Sciences
Verified
Journal Article
Closed access
PDF file
ASAzam Shahnazar
Azam Shahnazar
HRHima Nikafshan Rad
Hima Nikafshan Rad
Mahdi HasanipanahMahdi Hasanipanah
Mahdi Hasanipanah
MTM. M. Tahir
M. M. Tahir
DADanial Jahed Armaghani
Danial Jahed Armaghani
Mahyar GhoroqiMahyar Ghoroqi
Mahyar Ghoroqi

8 August 2023 in Buildings
Verified
Journal Article
Open access
PDF file
Mahyar GhoroqiMahyar Ghoroqi
Mahyar Ghoroqi
PGParviz Ghoddousi
Parviz Ghoddousi
AMAhmad Makui
Ahmad Makui
AJAli Akbar Shirzadi Javid
Ali Akbar Shirzadi Javid
STSaeed Talebi
Saeed Talebi
In this study, the multi-mode resource-constrained multi-project scheduling problems (MMRCMPSPs) considering supply management and sustainable approach in the construction industry under uncertain conditions have been investigated using evidence theory to mathematical modeling and solving by multi-objective optimization algorithms. In this regard, a multi-objective mathematical model has been proposed, in which the first objective function aims to maximize a weighted selection of projects based on economic, environmental, technical, social, organizational, and competitive factors; the second objective function is focused on maximizing profit, and the third objective function is aimed at minimizing the risk of supply management. Moreover, various components, such as interest rates, carbon penalties, and other implementation limitations and additional constraints, have also been considered in the modeling and mathematical relationships to improve the model’s performance and make it more relevant to real-world conditions and related issues, leading to better practical applications. In the mathematical modeling adopted, the processing time of project activities has been considered uncertain, and the evidence theory has been utilized. This method can provide a flexible and rational approach based on evidence and knowledge in the face of uncertainty. In addition, to solve the proposed multi-objective mathematical model, metaheuristic optimization algorithms, such as the differential evolution (DE) algorithm based on the Pareto archive, have been used, and for evaluating the results, the non-dominated sorting genetic algorithm II (NSGA-II) has also been employed. Furthermore, the results have been compared based on multi-objective evaluation criteria, such as quality metric (QM), spacing metric (SM), and diversity metric (DM). It is worth noting that to investigate the performance and application of the proposed model, multiple evaluations have been conducted on sample problems with different dimensions, as well as a case study on residential apartment construction projects by a contracting company. In this respect, the answers obtained from solving the model using the multi-objective DE algorithm were better and superior to the NSGA-II algorithm and had a more favorable performance. Generally, the results indicate that using the integrated multi-objective mathematical model in the present research for managing and scheduling multi-mode resource-constrained multi-project problems, especially in the construction industry, can lead to an optimal state consistent with the desired objectives and can significantly improve the progress and completion of projects.

1 June 2018 in Engineering with Computers
Verified
Journal Article
Closed access
PDF file
SMS. Farid F. Mojtahedi
S. Farid F. Mojtahedi
STSanaz Tabatabaee
Sanaz Tabatabaee
Mahyar GhoroqiMahyar Ghoroqi
Mahyar Ghoroqi
MTMehran Soltani Tehrani
Mehran Soltani Tehrani
BGBehrouz Gordan
Behrouz Gordan
MGMilad Ghoroqi
Milad Ghoroqi

10 May 2017 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
EMEdy Tonnizam Mohamad
Edy Tonnizam Mohamad
Danial Jahed ArmaghaniDanial Jahed Armaghani
Danial Jahed Armaghani
Mahyar GhoroqiMahyar Ghoroqi
Mahyar Ghoroqi
BBBehnam Yazdani Bejarbaneh
Behnam Yazdani Bejarbaneh
TGTadeh Ghahremanians
Tadeh Ghahremanians
OTOmid Tabrizi
Omid Tabrizi

1 January 2018 in The Journal of Supercritical Fluids
Verified
Journal Article
Closed access
WGWei Gao
Wei Gao
MAMahdi Abdi-Khanghah
Mahdi Abdi-Khanghah
Mahyar GhoroqiMahyar Ghoroqi
Mahyar Ghoroqi
ADAmin Daryasafar
Amin Daryasafar
MLMitra Lavasani
Mitra Lavasani