Guofeng Ma

Prof. Guofeng Ma


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
3 April 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
GMGuofeng Ma
Guofeng Ma
JJJianyao Jia
Jianyao Jia
Jiyong DingJiyong Ding
Jiyong Ding
SSShanshan Shang
Shanshan Shang
SJShan Jiang
Shan Jiang
The adoption of Building Information Modeling (BIM) will definitely improve the efficiency and quality of the AEC (architecture, engineering and construction) industry. However, many factors need to be improved before BIM adoption. Based on the interaction between institutions and technology, factors affecting BIM adoption in AEC organizations, within the context of China, are identified and analyzed. Firstly, 21 factors are identified by literature research. Then, an interpretive structural model (ISM) technique is used to establish a hierarchical structure, and matrix impacts cross-reference multiplication applied to a classification (MICMAC) is used for factor classification. The results indicate that corporate/project leadership and software functionality are the two fundamental factors. What’s more, the dynamic mechanism has gradually changed from top-down to a combination of top-down and bottom-up.

6 March 2018 in Sustainability
Verified
Journal Article
Open access
PDF file
GMGuofeng Ma
Guofeng Ma
QDQingjuan Du
Qingjuan Du
KWKedi Wang
Kedi Wang
Concession period of PPP (Public–Private Partnership) projects is the most essential feature in determining the time span of various rights, obligations and responsibilities between the government and concessionaire. Most traditional methods are based on the analysis of the future cash flow to determine the concession period, but either ignored the potential values or the risks that might emerge during the project life span, thus failing to find the proper concession period for the project. This paper builds a new model taking both recognized real option value and risk into concession period decision-making, and considering the distribution coefficient of option value, which uses game theory integrated with risk sharing, which increases the flexibility of the negotiation. Real option theory is introduced based on traditional NPV (Net Present Value); its potential value and strategic importance are further exploited. A case shows that the project concession period and the price of the sewage disposal are different when considering option value and risk sharing simultaneously and respectively, which give the two side’s references during negotiation. Allocating the option value and the risk properly between the government and concessionaire can also avoid dispute and promote cooperation.

7 July 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
GMGuofeng Ma
Guofeng Ma
XPXuhui Pan
Xuhui Pan
Recently, decreasing energy consumption under the premise of building comfort has become a popular topic, especially visual comfort. Existing research on visual comfort lacks a standard of how to select indicators. Moreover, studies on individual visual preference considering the interaction between internal and external environment are few. In this paper, we ranked common visual indicators by the cloud model combined with the failure mode and effect analysis (FMEA) and hierarchical technique for order of preference by similarity to ideal solution (TOPSIS). Unsatisfied vertical illuminance, daylight glare index, luminance ratio, and shadow position are the top four indicators. Based on these indicators, we also built the individual visual comfort model through five categories of personalized data obtained from the experiment, which was trained by four machine learning algorithms. The results show that random forest has the best prediction performance and support vector machine is second. Gaussian mixed model and classification tree have the worst performance of stability and accuracy. In addition, this study also programmed a BIM plug-in integrating environmental data and personal preference data to predict appropriate vertical illuminance for a specific occupant. Thus, managers can adjust the intensity of artificial light in the office by increasing or decreasing the height of table lamps, saving energy and improving occupant comfort. This novel model will serve as a paradigm for selecting visual indicators and make indoor space be tailored to meet individual visual preferences.

6 May 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
GMGuofeng Ma
Guofeng Ma
YDYue Ding
Yue Ding
JMJunyi Ma
Junyi Ma
The COVID-19 pandemic, which has become an important new research topic, has exerted a huge impact on airports and the antecedents of passengers’ travel decisions following its outbreak. In the current study, we aimed to investigate the influences of four attributes of airport physical environment (facility functionality, facility aesthetics, layout accessibility, and cleanliness) on passengers’ perceived safety, satisfaction, and travel intention, as well as the mediating role of passenger satisfaction. We built a structural equation model to assume the relationship between these variables. A total of 398 domestic travelers were asked to fill out a survey in order to reveal their perceptions of airport physical environment, perceived safety, satisfaction, and travel intention. The results indicate that passengers with positive perceptions of the facility functionality, layout accessibility, and cleanliness of airports had a higher degree of satisfaction and might be more willing to engage in more air travel in the future. In particular, a clean airport environment significantly improved passengers’ perceived safety. Moreover, facility functionality, layout accessibility, cleanliness, and perceived safety all had an effect on travel intention through the mediating role of satisfaction. Overall, these findings offer suggestions for airport authorities aiming to revive demand for air travel. Discussions about airport physical environment improvements along with limitations and suggestions for future research are provided.

GMGuofeng Ma
Guofeng Ma
STsheng Tan
sheng Tan
SSShanshan Shang
Shanshan Shang
The construction of smart cities is a theme of urban development, and building fires greatly threaten public safety and urban environmental governance, in which fire emergency management is one of the key factors. However, most studies on the evaluation of emergency response capacity ignore the process of improvement, as well as the intelligence and practicality of the results. The evaluation system of building fire emergency response capability maturity (FE-CMM) was innovatively proposed based on the capability maturity model (CMM), including the evaluation index, evaluation grade, evaluation method, and evaluation process. At the same time, a plug-in for evaluating fire emergency response capability was developed based on the building information modeling (BIM) platform. Finally, an empirical study was carried out in combination with the case of a district fire center. The research demonstrates that the evaluation system can effectively judge the maturity of fire emergency response capability, and the established plug-in can preliminarily realize the intelligent evaluation of building fire emergency response capability, which improves the practice and intelligence of the fire emergency response capability evaluation system when fully considering the process of improvement. It has guiding significance for ex ante control and refined management of building fires, thus providing support for urban public safety and environmental governance.

16 October 2019 in Sustainability
Verified
Journal Article
Open access
PDF file
GMGuofeng Ma
Guofeng Ma
SJShan Jiang
Shan Jiang
TZTiancheng Zhu
Tiancheng Zhu
JJJianyao Jia
Jianyao Jia
Construction projects have faced serious schedule delays caused by rework risks. However, it appears that traditional methods are of limited value in developing applicable project schedules. This study presents an analysis on construction projects schedule development under rework scenarios by a novel method named the improved critical chain design structure matrix (CCDSM). Research data are collected from a real estate development project in China. As a result, predictions of project completion duration and probability have been made. A reliable schedule considering information interactions has been developed and visualized. Rework impact areas of activities have been examined to quantitatively record the impact on project duration. To meet different demands, the method generates two more schedules setting different rework buffers. Furthermore, these activities have the potential of causing rework and have been quantified based on the calculation of two criticalities, providing an identification of rework-intensive works that should be payed close importance to, which have not be realized by previous methods. The results proved the feasibility and effectiveness of this method in developing a schedule for construction projects disturbed by rework, helping practitioners adopt measures to avoid rework-caused schedule delays and achieve sustainable development of such projects.