Gabriel Frumusanu

Prof. Dr. Gabriel Frumusanu

orcid

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 April 2012 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
Gabriel FrumusanuGabriel Frumusanu
Gabriel Frumusanu
ICIonut C. Constantin
Ionut C. Constantin
VMVasile Marinescu
Vasile Marinescu
AEAlexandru Epureanu
Alexandru Epureanu

1 June 2017 in International Journal of Modeling and Optimization
Verified
Journal Article
Closed access
CCCezarina Chivu
Cezarina Chivu
Gabriel FrumusanuGabriel Frumusanu
Gabriel Frumusanu

19 May 2021 in Transactions of FAMENA
Verified
Journal Article
Closed access
PDF file
Gabriel FrumusanuGabriel Frumusanu
Gabriel Frumusanu
CACezarina Afteni
Cezarina Afteni
AEAlexandru Epureanu
Alexandru Epureanu
In manufacturing system management, the decisions are currently made on the base of ‘what if’ analysis. Here, the suitability of the model structure based on which a model of the activity will be built is crucial and it refers to...

24 May 2011 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
Gabriel FrumusanuGabriel Frumusanu
Gabriel Frumusanu
AEAlexandru Epureanu
Alexandru Epureanu
ICIonuţ C. Constantin
Ionuţ C. Constantin

18 September 2018 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
CAC Afteni
C Afteni
Gabriel FrumusanuGabriel Frumusanu
Gabriel Frumusanu
AEA Epureanu
A Epureanu
The management of MTO-based production involves multiple decisions needing to be taken. They concern all stages of manufacturing activity – order acceptance, products design, processes planning and jobs scheduling. Such decision consists in selecting, at a given moment, the most suitable alternative of the potential ones. This means that comparative assessment of potential alternatives is required. The usual method underpinning the comparative assessment supposes the direct, separate evaluation of each alternative, before decision making. In this paper we suggest a different approach in performing the comparative assessment, based on alternatives rankings, considered as the most relevant information about them. More specific, this means that rankings are assigned to potential alternatives, by referring them to the cases of already performed manufacturing activities, recorded as past instances database, after ranking criteria such as cost, time span, consumed energy etc. Thus, the selection decision results by comparing potential alternatives rankings. For finding the ranking of a given alternative, a solution to assess the difference between instances is needed, at first. Then, after iteratively defining instances neighborhoods from database and modeling them by multiple nonlinear regression, its ranking is determined. Here, we propose an expression for the distance-function together with an algorithm for actually finding the ranking of the analyzed alternative. A numerical simulation for the instance-based comparative assessment, with the help of an instances artificial database is also presented.

22 September 2012 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
Gabriel FrumusanuGabriel Frumusanu
Gabriel Frumusanu
NONicolae Oancea
Nicolae Oancea