Brian Barkdoll

Dr. Brian Barkdoll

orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2006 in Journal of Hydraulic Engineering
Verified
Journal Article
Closed access
Bruce MelvilleBruce Melville
Bruce Melville
SBSjoerd van Ballegooy
Sjoerd van Ballegooy
SCStephen Coleman
Stephen Coleman
BBBrian Barkdoll
Brian Barkdoll
An experimental study of scour countermeasures for spill-through abutments situated on the flood plain of a compound channel is reported. The purpose of the study was to determine the variations in the scour hole geometry under clear water conditions by varying the compound channel and abutment geometries, and to determine the extent and type of scour countermeasure toe protection provided. This approach avoids one of the inherent difficulties in conducting scour countermeasure experiments—that is, the subjectivity of determining whether the countermeasure used in the experiment is a success or a failure. Riprap and cable-tied block countermeasures are incorporated. The results show that for most cases, as the countermeasure apron width (i.e., the extent of toe protection) is increased, the scour hole is deflected further away from the abutment and reduces in size. However, for abutment and compound channel configurations where the scour hole forms close to the main channel bank, the scour hole increases ...

1 June 2006 in Journal of Hydraulic Engineering
Verified
Journal Article
Closed access
Bruce MelvilleBruce Melville
Bruce Melville
SBSjoerd van Ballegooy
Sjoerd van Ballegooy
SCStephen Coleman
Stephen Coleman
BBBrian Barkdoll
Brian Barkdoll
An experimental study of scour countermeasures for wing-wall abutments under mobile-bed conditions is reported. The purpose of the study was to determine the required apron size to protect a wing-wall abutment from scour under mobile-bed conditions, for different flow depths, flow velocities, and apron placement level. Riprap and cable-tied block countermeasures were investigated. It was observed that scour at the abutment undermines the apron, causing the outer edge of the apron to settle. Scour at the abutment can be a combination of localized scour (i.e., contraction scour and local scour) and scour due to the troughs of the bed forms that migrate past the abutment, the latter being the focus of the study presented. As the flow depth and flow velocity are increased, the outer edge of the apron settles into the sand, to a depth proportional to the height of the bed forms developed in the flume. Localized scour may additionally influence the depth of settlement. When the apron width is increased, the dep...

1 November 2007 in Journal of Hydraulic Engineering
Verified
Journal Article
Closed access
Bruce MelvilleBruce Melville
Bruce Melville
SBSjoerd van Ballegooy
Sjoerd van Ballegooy
SCStephen E. Coleman
Stephen E. Coleman
BBBrian Barkdoll
Brian Barkdoll
The results of an experimental investigation of riprap stability at wing-wall abutments are reported. The aim of the experiments was the determination of the size of riprap stones necessary to resist shear failure by the flow. The results, which were obtained under a wide range of mobile-bed conditions, are compared with predictions of riprap stone size given by existing equations. Two existing methods, with the addition of suitable factors of safety, are shown to give stable stone size for riprap layers at wing-wall abutments under mobile-bed conditions. It is noted that consideration needs also to be given to filter protection, edge effects, and the effects of bed-form undermining in the design of such riprap layers.

1 June 2008 in Journal of Hydraulic Engineering
Verified
Journal Article
Closed access
RMReinaldo Morales
Reinaldo Morales
RERobert Ettema
Robert Ettema
BBBrian Barkdoll
Brian Barkdoll
Laboratory tests using a large-scale model of a spill-through bridge abutment led to important findings about the performance of a riprap apron as an abutment scour countermeasure. Riprap stone is widely used for protecting side slopes of embankments against erosion, and several design guidelines are available in the literature. In contrast, only a few guidelines exist for the design of a riprap apron around an abutment. These guidelines focus only on the armoring effect of riprap, neglecting other effects. This study shows that apron performance involves several mechanisms: armoring the bed, dissipating large-scale turbulence shed from the abutment, reducing the peak unit discharge, reducing the average shear stress, and shifting the scour region away from the abutment. Together, these mechanisms substantially reduce the maximum scour depth. The test findings are compared with those from a much smaller model of riprap-apron performance.

1 May 2006 in Journal of Hydraulic Engineering
Verified
Journal Article
Closed access
HLHua Li
Hua Li
BBBrian Barkdoll
Brian Barkdoll
RKRoger Kuhnle
Roger Kuhnle
CACarlos Alonso
Carlos Alonso
Scour at bridge abutments can cause damage or failure of bridges and result in excessive repairs, loss of accessibility, or even death. To mitigate abutment scour, both clear-water and live-bed laboratory experiments in a compound channel were performed using parallel walls. Two types of parallel walls were tested: the first was made of a solid thin wood plate and the second was made of piled rocks. For solid parallel walls, a series of vertically oriented, rectangular, straight plates of different lengths attached to the upstream end of a wing wall abutment parallel to the flow direction were employed. Three velocities of 0.9, 1.5, and 2.3 times the incipient motion value for bed sediment movement were used. The bed material was sand with a mean diameter of 0.8 mm and a standard deviation of 1.37. All the plates were seated at the bottom of the compound channel bank slope and were even with the abutment face. It was found that straight plates thus situated are able to move the scour hole away from the up...

1 December 2016 in Journal of Irrigation and Drainage Engineering
Verified
Journal Article
Closed access
TCTed M. Champagne
Ted M. Champagne
RBRachael R. Barlock
Rachael R. Barlock
Santosh Raj GhimireSantosh Raj Ghimire
Santosh Raj Ghimire
BBBrian Barkdoll
Brian Barkdoll
JGJuan A. Gonzalez-Castro
Juan A. Gonzalez-Castro
LDLarry Deaton
Larry Deaton
Hydraulic structure undermining attributable to scour can cause structural damage or collapse. Experiments were performed in a laboratory channel on scour downstream of a stilling basin of a low-head spillway to ascertain the feasibility of air injection for scour reduction, an idea that has not been previously attempted. Various hydraulic flow conditions without air injection indicate that the condition of stilling basin water elevation lower than the spillway crest, under high headwater-to-tailwater depth ratio, results in the deepest scour. Over 120 experiments were performed to determine the optimal parameters for scour reduction by air injection. It was found that optimal scour-reducing conditions consist of (1) air injection at an air-to-water velocity ratio of 251, (2) vertical air injection at the same elevation as the stilling basin exit point, (3) using diffuser hole diameters corresponding to a ratio of air-to-water velocity equal to 251 spanning the entire width of the stilling basin, ...