Seungyun Baek

Seungyun Baek


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 July 2023 in Processes
Verified
Journal Article
Open access
PDF file
MLMinyeob Lee
Minyeob Lee
YYYu Yoseb
Yu Yoseb
YCYewon Chun
Yewon Chun
SBSeungyun Baek
Seungyun Baek
YKYoungmin Kim
Youngmin Kim
Jongpil JeongJongpil Jeong
Jongpil Jeong
For decades, the chemical industry has been facing challenges including energy conservation, environmental protection, quality improvement, and increasing production efficiency. To address these problems, various methods are being studied, such as research on fault diagnosis for the efficient use of facilities and medium-term forecasting with small data, where many systems are being applied to improve production efficiency. The problem considered in this study is the problem of predicting time-series Controlled Variables (CV) with machine learning, which is necessary to utilize an Advanced Process Control (APC) system in a petrochemical plant. In an APC system, the most important aspect is the prediction of the controlled variables and how the predicted values of the controlled variables should be modified to be in the user’s desired range. In this study, we focused on predicting the controlled variables. Specifically, we utilized various machine learning techniques to predict future controlled variables based on past controlled variables, Manipulated Variables (MV), and Disturbance Variables (DV). By using a time delay as a parameter and adjusting its value, you can analyze the relationship between past and future data and improve forecasting performance. Currently, the APC system is controlled through mathematical modeling and research, The time-series data of controlled variables, manipulated variables, and disturbance variables are predicted through machine learning models to compare performance and measure accuracy. It is becoming important to change from mathematical prediction models to data-based machine learning predictions. The R-Squared (R2) and Mean Absolute Percentage Error (MAPE) metric results of this study demonstrate the feasibility of introducing an APC system using machine learning models in petrochemical plants.

25 July 2023 in Processes
Verified
Journal Article
Open access
PDF file
YYYu Yoseb
Yu Yoseb
MLMinyeob Lee
Minyeob Lee
CLChaegyu Lee
Chaegyu Lee
YCYewon Chun
Yewon Chun
SBSeungyun Baek
Seungyun Baek
Jongpil JeongJongpil Jeong
Jongpil Jeong
Several papers have proven that advanced process controller (APC) systems can save more energy in the process than proportional-integral-differential (PID) controller systems. Therefore, implementing an APC system is ultimately beneficial for saving energy in the plant. In a typical APC system deployment, the APC model parameters are calculated from dynamic data intervals obtained through the plant test. However, depending on the proficiency of the APC engineer, the results of the plant test and the APC model parameters are implemented differently. To minimize the influence of the APC engineer and calculate universal APC model parameters, a technique is needed to obtain dynamic data without a plant test. In this study, we utilize time-series data from a real petrochemical plant to determine dynamic intervals and estimate APC model parameters, which have not been investigated in previous studies. This involves extracting the data of the dynamic intervals with the smallest mean absolute error (MAE) by utilizing statistical techniques such as pruned exact linear time, linear kernel, and radial basis function kernel of change-point detection (CPD). After that, we fix the hyper parameters at the minimum MAE value and estimate the APC model parameters by training with the data from the dynamic intervals. The estimated APC model parameters are applied to the APC program to compare the APC model fitting rate and verify the accuracy of the APC model parameters in the dynamic intervals obtained through CPD. The final validation of the model fitting rates demonstrates that the identification of the dynamic intervals and the estimation of the APC model parameters through CPD show high accuracy. We show that it is possible to estimate APC model parameters from dynamic intervals determined by CPD without a plant test.