Load forecasting is an important tool for the operation of power systems. Quality planning of energy consumption leads to lower costs for energy retail companies. In this paper to improve electricity consumption forecasting accuracy, a new model based on an artificial neural network is proposed. A machine-learning-based load prediction model has been developed, implemented on the basis of Matlab simulation modelling. For short-term forecasting, hourly energy consumption data of the city of Nur-Sultan for the period 2018–2019 were used. In the work, the analysis of modern methods for forecasting electricity consumption, the choice of the configuration of the neural network, the determination of the input set of variables were carried out. Testing showed that the best results on the accuracy of the load forecast are achieved by a network with nonlinear autoregression and the Bayesian training principle. As a training algorithm for artificial neural networks, training algorithms for direct distribution networks were used, since they accounted for the greatest spread in forecasting loads. The simulation results illustrated that the proposed model performs well in power consumption forecasting and showed a high accuracy of the forecast.
The paper presents an analysis of the work of electricity grid companies of Kazakhstan, as well as an analysis of technical losses of electric power in the electricity networks of Kazakhstan. Specific features of the normalization of electricity losses in Kazakhstan are provided. To resolve the existing problems in electricity networks, measures are proposed to reduce energy losses. Implementing these recommendations will allow the determination of real and fair rates of losses to date, the reduction of the losses of electricity grid companies, bringing actual losses back to normal and the improvement of energy efficiency of networks through energy saving in electricity networks.
New results that solve the important scientific task of providing electrical networks with an isolated neutral voltage up to 1000 V in mining enterprises are obtained. The method for measuring the adm