By integrating gas, electricity, and cooling and heat networks, multi-energy system (MES) breaks the bondage of isolated planning and operation of independent energy systems. Appropriate scheduling of MES is critical to the operational economy, and it is essential to design scheduling strategies to achieve maximum economic benefits. In addition to the emergence of energy conversion systems, the other main novelty of MES is the multivariate of load, which offers a great optimization potential by changing load replaceability (flexibly adjusting the composition of loads). In this paper, by designing load replaceability index (LRI) of composite load in MES, its interaction mechanism with scheduling optimum is systematically analyzed. Through case studies, it is proven that the optimum can be improved by elevating load replaceability.
Concerning energy waste and rational use, this paper studies the optimal scheduling of day-ahead energy supply and the community’s demand with a combined cooling, heating, and power (CCHP) system in summer. From the perspective of bilateral costs and renewable energy use, this paper examines the impact of energy storage systems integrated into cogeneration systems. The Gurobi solver is used to optimize the residential community’s supply and demand sides of the traditional CCHP system (T-CCHP) and the CCHP system with energy storage (CCHP-ESS) under insufficient solar power. Subsequently, two optimal arrangements for energy consumption on the user side under these systems are suggested. In the optimization model, energy storage is added to the T-CCHP system on the energy supply side. On the user side, the energy use scheme is optimized considering the user’s comfort. The innovation point of this study is that the optimization of comprehensive energy in the park involves both supply and demand. The impact of increasing energy storage is discussed on the energy supply side, and the impact of optimization of the energy use plan on costs is discussed on the user side.
The high resistance connection fault of the stator is a common fault in doubly fed induction generators, which causes a three-phase imbalance in the stator circuit. Since the stator winding is directly connected to the power grid, interference from the asymmetric power grid must be eliminated in order to achieve the accurate diagnosis of stator resistance imbalance faults. Therefore, a new diagnosis method based on filter shunt capacitor banks is proposed in this paper. By introducing shunt capacitor banks, an artificial neutral point is constructed to replace the neutral point of the power grid. Then, the neutral point voltage of the stator winding relative to the artificial neutral point is selected as a fault characteristic signal. In this paper, the change in three-phase stator currents after a high-resistance connection fault is analyzed in detail, and by comparing the fault characteristic signal with three-phase stator currents, the fault phase location and fault severity of high-resistance connection can be accurately obtained. Finally, simulations are carried out via the field-circuit coupling method to validate the effectiveness of the proposed method.