The bullwhip effect (BWE) describes a phenomenon that involves the increasing amplification of demand variability along a supply chain (SC). The BWE has been a subject that has received continuous attention from researchers over the past 15 years and is a concern for SC managers because it is a major cause of efficiency and effectiveness loss in SCs. Information sharing between actors in an SC is usually considered to be one of the primary means to minimise the BWE. Approximately 50 articles published in major journals on these topics are studied in this article. An analytical framework is used to highlight the contingent character of the conclusions proposed by the authors. In this review, we identify the existence of significant gaps in the literature, especially concerning the BWE when it occurs in the productive part of the SC.
1 February 2010 in International Journal of Production Economics
This paper presents an integer programming formulation for the sequencing problem in mixed-model assembly lines where the number of temporarily hired utility workers and the number of sequence-dependent setups are to be optimized simultaneously through a cost function. The resultant model offers an operational way to implement the utility work needed to avoid line stoppages, unlike previous papers addressing the goal of smoothing the workload. The present research has an immediate application to the automotive industry, namely to the car-sequencing problem. Simulation results show that the proposed formulation leads to the optimum in a reasonable time for instances up to 15 items and to satisfactory feasible solutions for some of the larger problems we considered within a moderate time limit.
Open-pit deposits are often characterised by a stack of layers of different geological nature. Some layers are worthless while the ore of the others is of a varying economic value depending on grade. To reach a layer, it is necessary to have first removed the upper layers above the extraction zone. This action results in uncovering the layer in this particular place and in facilitating access to the layers below. This extraction process involves a series of 2–7 basic operations; each one is performed by a machine, some of which are able to perform up to three different operations. Ensuring the consistency of mining extraction scheduling over a few months, in order to meet known or forecast demand, is a challenging task. A mining extraction model based on mathematical programming is proposed but it is hardly usable, due to its size. Therefore, a model based on a Discrete Event Simulation, is created to test how ore supplies are affected by the tactical and operational decisions relating to the choice of parcels to be processed and to the allocation of machines to the different basic operations.
17 March 2022 in International Journal of Production Research
This paper proposes a multi-site global optimisation model of blending operations, alternative routings and order scheduling with a co-production flow. It is performed in a phosphoric supply chain owning three open-pit mines of different geological structures and chemical compositions, each having a dry blending plant. One main challenge of the phosphate industries is to produce merchantable ores (MO) that verify a quality charter (chemical composition) with chemical heterogeneous source ores (SO). Thus, a process of SO blending followed by a treatment is mostly necessary to obtain the required MO. Six alternative routings exist to produce an MO; one of them involving a calcination plant generates a co-product. The model objective is to determine the least costly production programme of a set of MO orders to be delivered within precise time windows, in given quantities and compliance with a specific quality charter, by assigning for each MO its blending plant, routing, blend of SOs and production schedule; it also defines the feeding of the blending plants. A real case study illustrates the proposed model.
14 September 2015 in International Journal of Production Research
The customisation of a vehicle on a production line results from the assembly of several hundreds of alternative components. Bills of Material (BOM) are usually made for operational purposes (to define the list of components to be assembled on a vehicle), for planning (to anticipate component procurement needs) and for commercial needs (guide customer choice and prepare sales forecasts). In the automotive industry, the diversity of end products which results from this combinatorial process (several millions) is such as no solution proposed in the literature allows to easily list the BOMs for all these vehicles. In our paper, we describe and theorise a solution used for many years by several carmakers, which consists in introducing a commercial description of the products in addition to their common organic representation. We show that this solution is an extension of the generic and modular BOM theory, recognised to be the most advanced solutions proposed in the literature. While fully meeting commercial and production control needs, this product description paradigm has limitations when it comes to determining the Master Production Schedules (MPS) at end product level beyond the frozen horizon, as performed by several automakers. An alternative approach defining MPSs at alternative component level is proposed in the literature. However, this approach also has several drawbacks that we point out. To overcome these issues, we propose a number of possible strategic and organisational tracks of improvement.