A two-stage decomposition approach based on a novel multi-agent system (MAS) is proposed for the distributed resource constrained multi-project scheduling problem (DRCMPSP). In stage one, from the point of view of each local project manager, a forward-backward hybrid genetic algorithm (FBHGA) is developed to generate an initial local schedule with the objective of minimizing individual project makespan. In stage two, from the global perspective of project management office, a sequential game-based negotiation mechanism is employed to eliminate global resource conflicts with the objective of minimizing total tardiness cost (TTC). The proposed approach is tested on 140 benchmark problem instances. According to the computational results, high-quality local project schedules can be obtained by FBHGA in stage one. Furthermore, it is observed that our method is capable of dealing with various complex multi-project instances under different degrees of resource conflicts in reasonable CPU running time. Compared to the existing decentralized methods for DRCMPSP, the proposed approach with sequential game-based negotiation mechanism shows the superiority in producing multi-project schedules with lower TTC, especially for large-size and strong conflicting instances.


9 May 2022 in Expert Systems with Applications
Verified
Journal Article
Closed access
YYYining Yu
Yining Yu
ZXZhe Xu
Zhe Xu
DLDongning Liu
Dongning Liu
SZSong Zhao
Song Zhao

23 March 2023 in IEEE Access
Verified
Journal Article
Open access
YYYining Yu
Yining Yu
ZXZhe Xu
Zhe Xu
SZSong Zhao
Song Zhao
In practical multi-skilled resource-constrained multi-project management, the activity duration is often affected by some factors (e.g., rework, increased workload), leading to uncertainty. Moreover, multiple projects are often managed under a distributed decision-making environment. To deal with uncertain activity durations in distributed multi-project management with multi-skilled staff, this paper studies a stochastic distributed resource-constrained multi-project scheduling problem with multi-skilled staff (MS-SDRCMPSP). In a distributed decision-making environment, a two-stage model with local scheduling and global coordination stages is established to describe MS-SDRCMPSP. A two-stage algorithm with 12 priority rules (TSA-12PRs) is proposed, these 12 priority rules are composed of 4 activity priority rules and 3 resource priority rules. In the local schedule stage, 4 activity priority rules (PRs) are applied to obtain the local schedule plan. In the global coordination phase, we develop 3 resource PRs based on variable neighborhood search (VNS), of which VNS is used to solve the execution order of conflicting projects, and 3 resource PRs are developed to formulate multi-skilled resource assignment strategies. Based on the multi-skilled instances adapted from benchmark instances, we evaluate the performance of the 12 PRs on different instances. The experiment results show that two PRs among 12 PRs perform better than other PRs in all-size instances. Comparing the two-stage algorithm with better two PRs with other approaches in literatures, we find that our method performs better than other approaches, especially in large-size instances. In addition, further experiments show that our method is more conducive to shortening the CPU runtime on distributed problems than centralized methods.

18 December 2020 in IEEE Access
Verified
Journal Article
Open access
DLDongning Liu
Dongning Liu
ZXZhe Xu
Zhe Xu
Multiple projects are often managed and run in a decentralized setting. In this paper, considering the uncertainty in project implementation, we study the distributed multi-project scheduling problem with uncertain duration. A multi-PR heuristic (MPR-H) is then proposed to dynamically coordinate the global resource conflicts while minimizing the expected total tardiness cost. Three priority rules based on current known information are also proposed and incorporated in our approach. We further consider the opportunistic behaviour of self-interested agents and design a payment negotiation process which is added to the MPR-H. In this paper, we then evaluate the performance of the MPR-H on the benchmark dataset MPSPLIB. The computational results confirm that MPR-H achieves significant improvements in comparison with several state-of-the-art distributed/centralized algorithms. The proposed algorithm also provides the senior manager with an efficient method to allocate global resources for large-size and strong conflicting instances under various activity duration distributions. Besides, we show that multi-projects with relative slack global resource constraints are more affected by the change of uncertainty. By analyzing the strategic behaviour of the agents in problems with two projects, we also show that in our MPR-H with payment negotiation approach, rational agents have to behave truthfully that is the dominant-strategy equilibrium leading to high-quality results.

6 November 2023 in International Transactions in Operational Research
Verified
Journal Article
Closed access
WYWeibao You
Weibao You
ZXZhe Xu
Zhe Xu
YYYining Yu
Yining Yu
SZSong Zhao
Song Zhao