yu hu

Dr. yu hu

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 August 2023 in Materials
Verified
Journal Article
Open access
PDF file
YHyu hu
yu hu
ZLZhuo Li
Zhuo Li
YSYawen Su
Yawen Su
YWYongbo Wu
Yongbo Wu
XLXiaoshuai Li
Xiaoshuai Li
XZXiaojun Zhang
Xiaojun Zhang
The dynamic characteristics of the filling body are the key parameters for designing the filling ratio and evaluating the stability of an underground stope. The different environment (water-bearing state) of the filling body in the underground stope exerts a complex impact on the mechanical behavior of the filling body. Therefore, six groups of cemented filling body specimens with different states were formed and subjected to dynamic uniaxial impact tests. The effects of water content on the mechanical properties, fractal dimension, and deformation damage characteristics of the cemented backfill under dynamic load were analyzed in depth, and a dynamic damage constitutive model that considers water damage and the compaction stage was established. The results indicate the following: (1) Due to the change of the specimen from the dry state to the water saturation state, the dynamic compressive strength of the cemented filling body decreases from 5.03 Mpa to 1.79 Mpa; however, the ductility of the specimen generally increases, and the filling body specimens with different water contents mainly exhibit tensile failure. (2) There is a significant nonlinear relationship between the water content and the fractal dimension Db of the cemented backfill specimen, and the growth rate of the fractal dimension Db tends to slow down with the increase in the water content. (3) From the energy evolution perspective, the water content of the specimen exerts a significant effect on the elastic deformation and failure stage of the stress–strain curve, and the slope of the dissipated energy-strain curve decreases with the increase in water content. (4) Based on the Weibull distribution and damage theory, a statistical damage constitutive model of cemented backfill was established, and it was compared with the experimental curve to verify the rationality of the model. Therefore, the relationship between stress and damage and the strain curves is discussed, and it is inferred that the damage evolution curve of cemented backfill is a typical S-shaped curve that exhibits a stable development-rapid increase-tending to be gentle. This study can provide a theoretical reference for further understanding the dynamic behavior and stability of backfill under different water conditions.

1 April 2026 in Eng
Verified
Journal Article
Open access
PDF file
YHyu hu
yu hu
RYRenshu Yang
Renshu Yang
JZJinjing Zuo
Jinjing Zuo
WHWangjing Hu
Wangjing Hu
GWGenzhong Wang
Genzhong Wang
BJBaojin Jiang
Baojin Jiang
To improve the blasting performance of tunnel wedge cutting while mitigating vibration effects, this study proposes a precise delayed blasting method and evaluates its effectiveness through a three-dimensional numerical simulation, similarity model test, and field application. The proposed method divides the cut holes into initial and secondary groups and uses electronic detonators to control the delay time. The numerical results show that delayed blasting reduces the peak stress in the surrounding rock, accelerates stress-wave attenuation, improves cavity integrity, and lowers the peak particle velocity (PPV), while maintaining sufficient rock breaking capacity. Model tests conducted under different delay times indicate that the delayed scheme increases the pull efficiency, decreases the ratio of large fragments, and reduces the PPV, with an optimal delay time range of 4~8 ms for moderately weathered limestone. Field tests in the Da Balai Tunnel further verify the effectiveness of the proposed method. Compared with conventional blasting, delayed blasting increases the pull efficiency from 77.8% to 97.3%, reduces the large fragment ratio from 30.6% to 11.4%, decreases the PPV by 52.5%, and increases the dominant vibration frequency by 48.7%. These results demonstrate that the proposed method can simultaneously enhance the rock-breaking quality and vibration control, providing practical guidance for tunnel blasting excavation under complex geological conditions.

25 March 2026 in Eng
Verified
Journal Article
Open access
PDF file
YHyu hu
yu hu
RYRenshu Yang
Renshu Yang
JZJinjing Zuo
Jinjing Zuo
WHWangjing Hu
Wangjing Hu
GWGenzhong Wang
Genzhong Wang
YGYongli Guan
Yongli Guan
To overcome the drawbacks of conventional wedge cut blasting—high peak particle velocity (PPV), low blasthole utilization, and a high proportion of large fragments—this paper proposes a delayed blasting method for wedge cut blasting. By integrating the rock-fracturing process of wedge cut blasting, the mechanisms of rock breaking and vibration reduction are investigated and confirm the method through field tests. The results indicate that the rock breaking process can be divided into two stages, the stage of fracture propagation and the stage of cavity ejection, and a rock breaking criterion for wedge cut delayed blasting is established. Considering differences in the vibration waveforms generated by different types of cut holes, a vibration waveform fitting method for wedge cut delayed blasting is proposed. Furthermore, the generation time of the blast-induced free surface during the rock breaking process is calculated, and a calculation Equation for the optimal delayed time is derived. Field tests in the Qi Jiazhuang tunnel show that, compared with conventional blasting, the proposed delayed blasting method increases blasthole utilization by 23.8%, reduces the large fragment rate by 67.4%, lowers PPV by 53.7%, and increases the dominant vibration frequency by 42.0%. These results significantly improve the wedge cut blasting performance and construction safety.

16 October 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YZYong Zhou
Yong Zhou
HYHuishi Ye
Huishi Ye
Peng XuPeng Xu
Peng Xu
YHyu hu
yu hu
KZKai Zhao
Kai Zhao
HZHuikun Zhai
Huikun Zhai
To solve the problems of high explosive consumption, coarse fragmentation, and low energy utilization efficiency in open-pit blasting of layered rock masses, an axial staggered charging technology is proposed. The core idea of this new technology is to adjust the explosive structure according to the thickness of layered rock mass by setting ‘in-hole axial spacing charge and inter-hole staggering space’. By inserting air decks within boreholes and alternately offsetting the explosive sections between adjacent holes, the spatial distribution and timing of energy release are effectively regulated, leading to a more uniform stress field and improved utilization of explosive energy. An on-site field experiment was conducted at the western-262 region of the Yanshan Iron Mine. Both the rock fragmentation process, the vibration velocity and the distribution of rock fragment size were analyzed. The results show that, when compared with the ordinary continuous blasting technology, the axial staggered charging technique can effectively reduce the flyrock distance and produce a more compact muckpile, while peak vibration velocity is reduced by approximately 8.7% and explosive consumption is decreased from 0.19 kg/t to 0.17 kg/t, representing a decrease of about 10.5%. Moreover, the rock fragments exhibited a more uniform fragmentation size under the axial staggered charging technique, and the rock fragment size beyond 0.5 m decreased significantly. This study indicates that the axial staggered charging technology can reduce both the explosive consumption and rock fragments size in layered rock masses, providing a practical and technically feasible approach for optimizing deep-hole blasting design in such strata.