This paper lays down a formal framework for simultaneous scheduling of machines, automated-guided vehicles (AGVs) and tools in a multi-machine flexible manufacturing system (FMS) while accounting for transport times of parts to minimise makespan. To minimise tooling costs, a central tool magazine (CTM) is suggested so that the tools are ‘shared’. AGVs and tool transporter (TT) carry jobs and tools between machines. The complexity of including sequencing of job operations on machines, assignment of AGVs and tools to job operations and corresponding trip operations such as the empty trip and loaded trip times of AGVs and a CTM in scheduling is greater. The scope of this paper is to propose a nonlinear Mixed Integer Programming (MIP) model to minimise makespan. Since the problem is known to be NP hard, it is conjectured and then verified that the intelligent behaviour of crows can be effectively used to lay down a metaheuristic algorithm known as a crow search algorithm (CSA) suitable for the problem at hand, and the results have been tabulated and analysed.
18 January 2021 in International Journal of Computer Integrated Manufacturing
This paper addresses machines, automated guided vehicles (AGVs), tool transporter (TT) and tools simultaneous scheduling in a multi-machine flexible manufacturing system (FMS) to minimize makespan (MSN). The transfer times of tools and jobs are considered. Only one copy of each type of tool is made available due to economic restrictions. The tools are stored in a central tool magazine (CTM) that shares with and serves for several machines. Jobs and tools between machines are transferred by AGVs and TT, respectively. This simultaneous scheduling problem is highly complex in nature as it involves job-operations sequencing on machines, assigning AGVs and tools to job-operations and associated trip operations including the times of empty trip and loaded trip of both AGVs and TT. This paper presents nonlinear-mixed integer programming (MIP) formulation to model and symbiotic organisms search (SOS) algorithm based on the symbiotic interaction strategies that organisms use to survive in the ecosystem to solve this simultaneous scheduling problem. The results have been tabulated and analyzed. An industrial problem in a manufacturing company is used for verification and the result obtained by SOS algorithm is compared with other algorithm.
18 August 2022 in Engineering Applications of Artificial Intelligence
This paper deals with machines, automated guided vehicles and tools simultaneous scheduling in multi-machine flexible manufacturing system considering jobs’ transport times among machines to minimize makespan. Only one copy of every tool type is made available due to economic restrictions. The tools are stored in central tool magazine that shares with and serves for several machines. This simultaneous scheduling problem is highly complex in nature as it involves the allocation of automated guided vehicles and tools to job-operations, job-operations sequencing on machines, and associated trip operations including the dead heading trip and loaded trip times of automated guided vehicles. This paper proposes symbiotic organisms search algorithm for solving this problem. An industrial problem in a manufacturing company is used for verification. The results show that SOSA is providing better solutions than Jaya algorithm, and the obtained schedule can be implemented practically with reduction in cost. Graphical abstract