Huaixun Zhang

Dr. Huaixun Zhang


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 September 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
TJTang Jiajie
Tang Jiajie
JZJie Zhao
Jie Zhao
HZHongliang Zou
Hongliang Zou
GMGaoyuan Ma
Gaoyuan Ma
JWJun Wu
Jun Wu
HZHuaixun Zhang
Huaixun Zhang
The effective prediction of bus load can provide an important basis for power system dispatching and planning and energy consumption to promote environmental sustainable development. A bus load forecasting method based on variational modal decomposition (VMD) and bidirectional long short-term memory (Bi-LSTM) network was proposed in this article. Firstly, the bus load series was decomposed into a group of relatively stable subsequence components by VMD to reduce the interaction between different trend information. Then, a time series prediction model based on Bi-LSTM was constructed for each sub sequence, and Bayesian theory was used to optimize the sub sequence-related hyperparameters and judge whether the sequence uses Bi-LSTM to improve the prediction accuracy of a single model. Finally, the bus load prediction value was obtained by superimposing the prediction results of each subsequence. The example results show that compared with the traditional prediction algorithm, the proposed method can better track the change trend of bus load, and has higher prediction accuracy and stability.

28 August 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
JZJie Zhao
Jie Zhao
MZMingchen Zhang
Mingchen Zhang
BZBiao Zhao
Biao Zhao
XDXiao Du
Xiao Du
HZHuaixun Zhang
Huaixun Zhang
CWChenhao Wang
Chenhao Wang
Large-scale wind power grid integration will greatly change the system current distribution, making it difficult for the reactive power regulator to adjust to the optimal state. In this paper, an integrated reactive power optimisation method based on the improved Harris Hawk (HHO) algorithm is proposed. Firstly, a reactive power regulation model is constructed to solve the reactive power regulation interval of wind turbines, and the reactive power margin of wind turbines is used to participate in the system’s reactive power optimisation. Finally, a reactive power compensation capacity allocation optimisation model considering nodal voltage deviation, line loss and equipment investment cost, is established, and a reactive power optimisation scheme is obtained using the Harris Hawk optimisation algorithm on the basis of considering the constraints of the wind turbine reactive power output interval. The improved HHO algorithm is used to solve the reactive power optimisation scheme considering the constraints of tidal power, machine end voltage, a conventional generator and wind farm reactive power. In the simulation, the effects of the improved Harris Hawk optimisation algorithm and the particle swarm optimisation algorithm are compared, and the experimental results prove that compared to the particle swarm algorithm, the optimisation result of the improved Harris Hawk optimisation algorithm reduces the average loss of the system by 42.6% and reduces the average voltage deviation by 30.3%, which confirms that the improved Harris Hawk intelligent optimisation algorithm is effective in proving its superiority and solving the multi-objective model for reactive power optimisation.

12 October 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
JZJie Zhao
Jie Zhao
YLYilin Liang
Yilin Liang
YFYudi Fang
Yudi Fang
YWYixuan Weng
Yixuan Weng
WMWeizhe Ma
Weizhe Ma
YZYiyang Zhang
Yiyang Zhang
Large-scale power outage events bring serious economic losses to national and social development and cause bad impacts, and the reasonable formulation of a unit black-start strategy is the basis of power outage recovery. Firstly, the Dijkstra shortest path algorithm is used to search for the optimal recovery path of the unit to be started after a major blackout occurs, and secondly, a comprehensive index of the unit start sequence considering the unit characteristics and unit distance is defined to guide the unit start sequence formulation by combining the unit capacity, climbing rate, start power, and other characteristics with the recovery time and capacitance value of the recovery path. Finally, based on the unit start sequence and optimal recovery path, and taking into account the unit start constraints, a complete unit black-start strategy is proposed, and the effectiveness of this strategy is verified by IEEE30 node system simulation. The results show that the proposed unit black-start strategy can reduce the unit recovery time and improve the recovery success rate.