The International Maritime Organization (IMO) aims for net zero emissions in shipping by 2050. Ports, key links in the supply chain, are embracing green innovation, focusing on efficient berth and quay crane scheduling to support green port development amid limited resources. Additionally, the energy consumption and carbon emissions from the port shipping industry contribute significantly to environmental challenges and the sustainable development of ports. Therefore, reducing carbon emissions, particularly those generated during vessel berthing, has become a pressing task for the industry. The increasing complexity of berth allocation now requires compliance to vessel service standards while controlling carbon emissions. This study presents an integrated model that incorporates tidal factors into the joint optimization of berth and quay crane operations, addressing both service standards and emissions during port stays and crane activities, and further designs a PSO-GA hybrid algorithm, combining particle swarm optimization (PSO) with crossover and mutation operators from a genetic algorithm (GA), to enhance optimization accuracy and efficiency. Numerical experiments using actual data from a container terminal demonstrate the effectiveness and superiority of the PSO-GA algorithm compared to the traditional GA and PSO. The results show a reduction in total operational costs by 24.1% and carbon emissions by 15.3%, highlighting significant potential savings and environmental benefits for port operators. Furthermore, the findings reveal the critical role of tidal factors in improving berth and quay crane scheduling. The results provide decision-making support for the efficient operation and carbon emission control of green ports.
1 November 2025 in INFORMS Journal on Applied Analytics
This study proposes a ship scheduling model that considers a comprehensive set of factors, such as ship types, ship routes, and berthing criteria. This study designs a customized heuristic algorithm based on the realistic scheduling rules to minimize all ships’ waiting time. This study develops an intelligent scheduling system to replace traditional manual scheduling method.
Against the backdrop of the dual-carbon strategy promoting the green and low-carbon transformation of the shipping industry, pollutant emissions generated during vessel berthing operations have become a critical challenge in port environmental governance. To address the combined effects of the priority berthing policy for new energy vessels and time-of-use electricity pricing, a joint optimization model for berth and shore power allocation is developed with the objectives of minimizing the total economic cost of vessels and the environmental tax cost associated with pollutant emissions. An improved Adaptive Large Neighborhood Search algorithm (ALNS-II) is further designed to solve the model. Numerical experiments based on actual port data verify the effectiveness of the proposed model and the superiority of the algorithm. The results indicate that, under time-of-use electricity pricing, the priority berthing policy for new energy vessels can shorten their waiting time at anchorage and encourage fuel-powered vessels to shift toward electrification. When the peak-to-valley electricity price ratio increases from 4.1:1 to 7.5:1, the environmental tax cost of pollutant emissions decreases slightly, whereas the total economic cost of vessels rises by 4.17%, suggesting that the peak-to-valley electricity price ratio should not be set excessively high. In addition, increasing the proportion of new energy vessels to 70% is more conducive to improving the overall economic and environmental performance of ports. The findings provide a theoretical basis and decision support for the optimal allocation of port resources under the coordination of multiple policies.
31 March 2024 in Mechatronics and Intelligent Transportation Systems
To address the lack of multi-perspective, real-time monitoring and management of operations and equipment in automated container terminals, a digital twin system targeted at monitoring automated container terminal equipment has been designed and developed. Based on the concept of a five-dimensional model of digital twins, a digital twin framework for monitoring automated container terminal equipment was constructed. The system's maintainability is enhanced through a layered design, which also reduces coupling between different functional modules. A multi-dimensional, multi-scale virtual scene was built and model consistency evaluations were conducted to verify the system. The system's operational efficiency was improved by optimizing model rendering with discrete level of detail (LOD) techniques. A multi-layered distributed solution for the digital twin system was proposed to achieve multi-perspective monitoring. Ultimately, using a specific automated container terminal as a case study, a system prototype was developed, realizing multi-perspective digital monitoring of terminal operations and equipment. This project offers a solution for the application of digital twin technology in the field of automated container terminals and promotes the development of intelligent digital terminals.
1 January 2026 in Journal of Advanced Transportation
Intelligent transformation of container yards is essential for increasing terminal capacity. Demand uncertainty may lead to the risk of delays in port container operations. Traditional “predict‐then‐optimize” (PTO) frameworks often yield suboptimal results because forecasting goals are isolated from the actual decision objectives. To bridge this gap, we use a balanced smart predict‐then‐optimize (Bal‐SPO) framework for multiperiod retrofit scheduling. This approach integrates an long short‐term memory (LSTM) network with a mixed‐integer programming (MIP) model through decision‐focused learning. A key innovation is the inclusion of a “balance” term in the loss function. This feature stops too many zones from being closed at once for retrofitting. Experimental results based on historical data demonstrate that this framework reduces operational costs by 17.1% compared to traditional PTO frameworks. It also reduces delay penalty costs by 16.9%. Ultimately, this research provides port managers with a robust and practical decision‐support tool for implementing intelligent yard retrofits in uncertain environments.