Dr Sabrina Fawzia

Dr. Dr Sabrina Fawzia

orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 August 2010 in Composite Structures
Verified
Journal Article
Closed access
Dr Sabrina FawziaDr Sabrina Fawzia
Dr Sabrina Fawzia
XZXiao-Ling Zhao
Xiao-Ling Zhao
RARiadh Al-Mahaidi
Riadh Al-Mahaidi

1 September 2006 in Composite Structures
Verified
Journal Article
Closed access
Dr Sabrina FawziaDr Sabrina Fawzia
Dr Sabrina Fawzia
RARiadh Al-Mahaidi
Riadh Al-Mahaidi
XZXiao-Ling Zhao
Xiao-Ling Zhao

31 March 2017 in Construction Economics and Building
Verified
Journal Article
Open access
PDF file
JSJamil Ghazi Sarhan
Jamil Ghazi Sarhan
Bo XiaBo Xia
Bo Xia
Dr Sabrina FawziaDr Sabrina Fawzia
Dr Sabrina Fawzia
Azharul KarimAzharul Karim
Azharul Karim
The Kingdom of Saudi Arabia (KSA) has witnessed a huge increase in construction during the last two decades. However, many projects experienced time delays, cost overruns and the generation of massive amounts of waste. To address these challenges, lean construction has been introduced into the Saudi construction industry; however, it is still in its infancy. This study therefore investigates the current state of lean construction implementation in the construction industry in the KSA. The objectives are to identify: the types of construction waste, level of use of tools that support the implementation of lean construction, stages of application of lean methods, and the benefits of lean construction. To achieve these objectives, a structured questionnaire survey of 282 construction professionals was carried out. After the analysis of the collected data using mean score and Anova test, the following conclusions were made. In the construction industry in the KSA, waiting is the most common type of waste, while Computer Aided Design (CAD) is the conventional tool supporting the implementation of lean construction. Furthermore, the data suggests that lean construction is most commonly used in the construction stage of projects while customer satisfaction is the main benefit derived from lean construction practices. This study concludes that the level of implementation of lean construction in the KSA construction industry is increasing. The results will help benchmark the current state of lean construction implementation, which will enable the construction industry to identify strategies to implement lean construction in Saudi Arabia in accordance with their needs and project goals, to achieve better productivity.

1 April 2007 in Construction and Building Materials
Verified
Journal Article
Closed access
Dr Sabrina FawziaDr Sabrina Fawzia
Dr Sabrina Fawzia
RAR. Al-Mahaidi
R. Al-Mahaidi
XZX.L. Zhao
X.L. Zhao
SRS. Rizkalla
S. Rizkalla

1 September 2017 in Engineering Structures
Verified
Journal Article
Closed access
IAIftekharul Alam
Iftekharul Alam
Dr Sabrina FawziaDr Sabrina Fawzia
Dr Sabrina Fawzia
XZXiao-Ling Zhao
Xiao-Ling Zhao
ARAlex M. Remennikov
Alex M. Remennikov
MBMike Bambach
Mike Bambach
MEM. Elchalakani
M. Elchalakani

23 February 2018 in Construction Innovation
Verified
Journal Article
Closed access
JSJamil Sarhan
Jamil Sarhan
Bo XiaBo Xia
Bo Xia
Dr Sabrina FawziaDr Sabrina Fawzia
Dr Sabrina Fawzia
Azharul KarimAzharul Karim
Azharul Karim
Ayokunle OlanipekunAyokunle Olanipekun
Ayokunle Olanipekun
Purpose: The purpose of this paper is to identify the barriers to implementing lean construction in the Kingdom of Saudi Arabia (KSA) construction industry and to prioritise the principal factors that constitute these barriers. Design/methodology/approach: A literature review was initially used to reveal the global barriers to implementing lean construction. Subsequently, these barriers were incorporated into a structured questionnaire, and a convenience sample of 282 construction professionals in the KSA construction industry was surveyed. The results were analysed using mean item score (MIS), Mann–Whitney U test and principal component analysis (PCA). Findings: The findings revealed 22 barriers to lean construction implementation in the KSA construction industry. Principal factors that constitute these barriers were found to be traditional practices, client related, technological, performance and knowledge and cost-related barriers in descending order of pervasiveness. The study also proposes solutions to overcome these principal barriers. Originality/value: This study provides a global overview of the barriers to implementing lean construction. It contributes to the body of knowledge, as it uncovers for the first time the barriers to implementing lean construction in the KSA construction industry with reference to the socio-cultural, economic and operational context of the KSA. Thus, it is relevant to other countries in the Middle East because of their shared similarities to the KSA. Furthermore, the solutions proposed to overcome these barriers in the KSA construction industry can be applied in other countries where similar barriers are identified.