Eric Scheepbouwer

Dr. Eric Scheepbouwer

orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2011 in Transportation Research Record: Journal of the Transportation Research Board
Verified
Journal Article
Closed access
ESEric Scheepbouwer
Eric Scheepbouwer
AHAdam B. Humphries
Adam B. Humphries
Recently asset owners have been investigating alternative delivery models for construction projects that offer improvements in value for money and project delivery time. One of these methods is the early contractor involvement (ECI) strategy. In this strategy a contractor is engaged before commencement of the construction work to give input during design. After the design, the construction work is negotiated with the contractor. Implementation of this new delivery strategy can raise issues with involved parties in the industry. To find these transitional issues, expectations and opinions were collected from practitioners from the three involved parties—owners, designers, and contractors—who had experience with ECI. The results show that all parties agreed in expecting improvements in quality and innovation and that the costs needed to adopt this system were not significant. Owners and contractors opined that the design phase could be expedited; however, the designers argued that any time savings were negated by increased collaboration and negotiation between the parties. There was also disagreement on risk allocation during construction. Contrary to the other parties, the contractors did not perceive the allocation of risk to them to be greater than with traditional procurement systems. Finally there was disagreement about whether the necessary collaborative culture was present in the construction industry for adopting “open book” costing, often practiced in ECI. It is recommended that for successful implementation of ECI, objectives in the areas of disagreement should be clarified between parties as they work through a transitional phase in adopting the ECI procurement method.

7 November 2016 in Disaster Prevention and Management: An International Journal
Verified
Journal Article
Closed access
MLMiao Liu
Miao Liu
ESEric Scheepbouwer
Eric Scheepbouwer
Sonia GiovinazziSonia Giovinazzi
Sonia Giovinazzi
Purpose: The purpose of this paper is to synthesise critical success factors (CSFs) for advancing post-disaster infrastructure recovery and underpinning recovery authorities in decision making when facing future disasters. Design/methodology/approach: The seismic recovery after the Canterbury (NZ) earthquake sequence in 2010-2011 was selected as a case study for identifying CSFs for an efficient recovery of infrastructure post-disaster. A combination of research approaches, including archival study, observations and semi-structured interviews were conducted for collecting data and evidences by engaging with participants involved at various tiers in the post-disaster recovery and reconstruction. The CSFs are evaluated and analysed by tracking the decision-making process, examining resultant consequences and foreseeing onwards challenges. Findings: Six salient CSFs for strengthening infrastructure recovery management after disasters are identified. Furthermore, the study shows how each of these CSFs have been incorporated into the decision-making process in support of the post-disaster recovery and what difficulties encountered in the recovery process when implementing. Practical implications: The proposed CSFs provide a future reference and guidance to be drawn on by decision makers when project-managing post-disaster recovery operations. Originality/value: The value of the paper is that it bridges the gap between managerial contexts and technical aspects of post-disaster recovery process in an effort to rapidly and efficiently rebuild municipal infrastructure.

1 June 2015 in Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
Verified
Journal Article
Closed access
PBPaul Stephanus Botha
Paul Stephanus Botha
ESEric Scheepbouwer
Eric Scheepbouwer
The alliance contract is a flexible form of partnering between organisations, and, to date, alliances for the delivery of infrastructure projects in the construction industry have typically been a partnership between one owner participant and one or more non-owner participants, including a design consultancy. The Christchurch infrastructure rebuild team in New Zealand, set up to deliver the reconstruction of the earthquake-damaged infrastructure, is a multi-client, multi-contractor programme alliance with professional services procured from consultancies amalgamated into four teams that are not participants in the alliance model. This multi-client, multi-contractor alliance is different from more commonly used ‘classes’ of alliances in the procurement of design services. In particular, the introduction of a delivery performance score provides price tension between the non-owner participants and ensures value for money for the client organisations, while the gain/pain incentive ensures both collaboration across the delivery teams and independent target outturn cost development with no direct price influence from the delivery teams.

1 January 2015 in Transportation Research Record: Journal of the Transportation Research Board
Verified
Journal Article
Closed access
DGDouglas D. Gransberg
Douglas D. Gransberg
ESEric Scheepbouwer
Eric Scheepbouwer
The term “partnering” has many meanings in the transportation industry. Some definitions are strictly legal, others are merely descriptive titles given to a set of team-building tools used to reduce adversarial relationships on individual construction projects. As collaborative methods of transportation project delivery increase, it is important for researchers and practitioners to be able to identify the precise meaning of an operative title from the context in which it is used. This paper presents a comparative analysis of advantages and disadvantages of three collaborative partnering methods: U.S. nonbinding partnering charter, binding partnering contract, and alliance agreements used internationally. The results are from an analysis of five U.S. and international studies on partnering and relational contracting based on case studies from more than 30 U.S. and international transportation projects. The paper found that although the U.S. partnering program has documented successes, its nonbinding nature provides no recourse if projects turn sour. In comparison, the international partnering and alliance contracts have specific remedies to which an agency can turn to mitigate negative impacts if one party fails to live up to contractual responsibilities. The paper recommends that U.S. agencies consider developing project partnering charters that can be incorporated into design and construction contracts as modifications in the same manner that alliance and partnering agreements are codified for international projects.

1 January 2017 in Frontiers of Engineering Management
Verified
Journal Article
Open access
PDF file
ESEric Scheepbouwer
Eric Scheepbouwer
DGDouglas D. Gransberg
Douglas D. Gransberg
CPCarla Lopez del Puerto
Carla Lopez del Puerto

14 July 2016 in International Journal of Pavement Engineering
Verified
Journal Article
Closed access
JWJ. D. van der Walt
J. D. van der Walt
ESEric Scheepbouwer
Eric Scheepbouwer
STS. L. Tighe
S. L. Tighe
In Canterbury New Zealand, chip seal is the primary surface material for rural state highways. The roads are designed to accommodate various types of traffic; traffic that has grown steadily over the past decade. The growth in dairy and logging, two of New Zealand’s main exports, resulted in a large rise in milk and logging trucks. This significant increase in traffic has led to a significant amount of pavement failure due to rutting which predominantly occurs in the outside wheel path rather than the inside. This paper provides a review and analysis of LTPP data at two rural sites. Data from these sites show more rutting in the outside wheel path than the wheel path close to the crown of the road. Contributing factors observed from the literature are included in this paper and it was shown that the main contributing factor to rutting is load (traffic). Road pavements are constructed to be homogeneous but anecdotally it is known that using camber or a crown will divide the load from traffic more towards the outside wheel. Some general factors that increase the difference are the axle width, and height of the centre of mass, the camber percentage and present rutting depth. Calculations show that the difference in load on the left and right wheel can lead to quite different ESAL values compared to values calculated based on the average load. In fact, an example using Austroads shows that the ESAL value can almost double if actual wheel loads are used. It also shows that there are no other mechanisms that adequately account for this difference.