Electricity consumption during oil production is a significant cost for industry enterprises. One of state policy’s most important tasks in extracting minerals is increasing energy efficiency and the intellectualization of control and management systems. The solution to these tasks can be achieved through competent planning of the technological process and the organization of information support at all stages. The paper presents the development of a method for power consumption, the optimization of an electric submersible pump installation. The technological restrictions are also identified. The developed methodology was tested; according to the results of the calculations, it was found that the reduction in specific power consumption can reach 12.68%. An assessment of the economic feasibility of the changing parameters of the electrical equipment has been carried out. Within the framework of the integrated logistic support approach, a program was developed for the selection of rational parameters of equipment in order to increase the energy efficiency of the installation of electric submersible pumps. The research results can be applied to oil-extracting industry enterprises in the framework of energy efficiency improvement programs.
The purpose of this research is to develop a multi-agent model of an electrical engineering complex for an oil-and-gas-producing enterprise to ensure power balance in its electrical grid by taking into account the increase in the incoming part of the balance by introducing small- and medium-capacity-distributed generation facilities using associated petroleum gas. Previously, the structure of a multi-agent system and the principles of agent interaction were developed to allow the dependence between the processes of generation and consumption of electric energy and the technological process during oil and gas production. In this research, the multi-agent approach is based on the application of the developed methodology to ensure power balance in the electrical grid of an oil-and-gas-producing enterprise. The fuel balance during electricity generation under various scenarios of electrical modes in electrical engineering complexes is considered. To test the operability and make an error estimation of the methodology, digital and physical models of an electrical engineering complex with low- and medium-power-distributed generation facilities were developed for an oil-and-gas-producing enterprise. One of the most important factors that determines the efficiency of a ensuring power balance in the electrical grid of an oil-and-gas-producing enterprise is the consideration in the power balance equation the value of power generated through the use of associated petroleum gas produced by oil production facilities.