Ebu Bekir Aygar

Dr. Ebu Bekir Aygar


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 February 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
EAEbu Bekir Aygar
Ebu Bekir Aygar
Candan GokceogluCandan Gokceoglu
Candan Gokceoglu
The T3 railway tunnel—under construction within the scope of the Bursa-Yenişehir high-speed train project—is located in northwestern Turkey and has a length of 1250 m. The tunnel is being constructed entirely in silty clay/clayey silt, sand, and clay units, and it is designed in accordance with the principles of weak ground tunneling described by the new Austrian tunneling method (NATM). When the tunnel excavations began in 2013, during and after portal excavations, a failure occurred at the entrance of the tunnel; thus, a revision of the support systems became mandatory. While the excavation works proceeded after the revision phase, a collapse occurred again at the tunnel face where the overburden thickness was low. This study presents the mechanisms of the collapse that took place at the portal location and in the middle of the tunnel. The proposed tunnel support systems and their numerical analyses are also discussed, because the case is interesting for the tunnel community and will inform future tunnel construction work. For this reason, the relationship between portal excavation and tunnel excavation stability is described. Consequently, tunnels excavated through weak ground conditions are considered, and the importance of considering the face stability of tunnels in tunneling studies is underlined.

1 November 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
EAEbu Bekir Aygar
Ebu Bekir Aygar
The Bolu tunnel is located between the Istanbul-Ankara Highway and its construction took approximately 13 years. Since the beginning of the tunnel excavation, serious deformations and stability problems have been encountered. The basis of the problems encountered during the tunnel excavation is the fact that the geological units through which the tunnel passes are very weak and fault lines cut the tunnel location. The fault lines pass through secondary faults in the seismically active North Anatolian Fault. At these fault crossings, deformations occurred continuously so that revisions had to be made in the support systems. The 12 November 1999 Düzce earthquake occurred on the Düzce fault and a surface rupture 40 km long was caused. The rupture terminated 1.5 km west of the tunnel; it did not reach the tunnel. Throughout the earthquake, instances of collapse occurred at the areas excavated on the fault line at the entrance of Elmalık and where the deformations exceeded 1.0 m; this section of the tunnel had to be abandoned. After these problems, a new improved design for tunnel excavation was developed. These new support systems, which are Bernold lining and bench pilot tunnel systems, contain allowance for rigid lining that is the opposite of the new Austrian tunneling method (NATM) principles. Within the scope of this study, the causes of the collapse in the tunnel are investigated and the effect of the Düzce earthquake on the tunnel is discussed. Also, the applicability of the NATM in tunnels excavated on weak zones is also discussed.

8 December 2022 in Scientific Reports
Verified
Journal Article
Open access
PDF file
EAEbu Bekir Aygar
Ebu Bekir Aygar
The problems experienced in tunnels excavated under high cover in graphitic schists generally vary according to the squeezing mechanism. During the tunnel excavation, slips occur on the slickenside surfaces in the tunnel face from time to time and collapse occurs. Most of the time, failures in the support systems are observed due to the squeezing mechanism in the long term in the sections whose tunnel excavations have been completed. In addition, if tunnel excavations are carried out from both entrance faces, it is possible to encounter excessive deformations at the junction points of the tunnels. Especially on weak ground, the importance of the distances between the stages increases in the case of opening the tunnels in the form of top heading, bench, and invert gradually. As a tunnel excavation method, excavation in stages directly affects the stability of the tunnel. Within the scope of this study, the collapsed mechanism in the junction area of the tunnels of the T6 tunnel is examined. For this purpose, 3-dimensional numerical analysis are performed with the Flac3d program. Analysis results are compared with site deformation measurements. As a result, an excavation methodology is proposed for the junction area of tunnels in weak ground.

13 December 2025 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
EPEvren Posluk
Evren Posluk
EAEbu Bekir Aygar
Ebu Bekir Aygar
EPElif Apaydin Posluk
Elif Apaydin Posluk
SKServet Karahan
Servet Karahan
SDSüleyman Dalgiç
Süleyman Dalgiç
Candan GokceogluCandan Gokceoglu
Candan Gokceoglu

31 January 2022 in Demiryolu Mühendisliği
Verified
Journal Article
Closed access
PDF file
EAEbu Bekir Aygar
Ebu Bekir Aygar
Son dönemlerde altyapı çalışmalarına ağırlık verilmiş olan ülkemizde tünelcilik faaliyetleri çok hızlı bir şekilde artış göstermiştir. Özellikle Yüksek Hızlı Demiryolu Projelerinde güzergahın kısıtlamalarından dolayı tünel sayısının arttığı daha net görülmüştür. Ülkemizdeki büyük alt yapı projelerinden olan Ankara İstanbul, Bursa Yenişehir, Ankara Konya, Kars Tiflis, Ankara Sivas ve Ankara İzmir arası Yüksek Hızlı Tren Projelerinde kazı çalışmaları devam etmektedir. Bu kesimlerde yer alan tünellerden bir kısmı tamamlanmış olup diğerlerinde kazı çalışmaları devam etmektedir. Söz konusu büyük projelerden edinilen tecrübeler ile bu çalışmada kapsamında tünel projelendirilmesi sırasında takip edilen yöntemler anlatılarak yöntemlerdeki kısıtlamalar, avantajlar ve dezavantajlar değerlendirilecektir.

30 September 2022 in Bilimsel Madencilik Dergisi
Verified
Journal Article
Closed access
PDF file
EAEbu Bekir Aygar
Ebu Bekir Aygar
Bolu Tüneli Ankara İstanbul Otoyolu üzerinde yer almaktadır. Bolu Tüneli proje çalışmalarına 1993 yılında başlanmış olup 2007 yılında trafiğe açılmıştır. 3 şeritli çift tünel olarak inşa edilmiştir. Tünel uzunlukları sağ tünel 2788 m sol tünel ise 2954 m’dir. Bolu Tüneli inşası sırasında 2 kez sel ve 2 kez depreme maruz kalmış ve tünelin Ankara girişinde yeralan Elmalık kesiminde 12 Kasım 1999 Düzce Depremi sonrası göçük yaşanmıştır. Bu göçük sonrasında tünel güzergahı değiştirilmiştir. Bolu Tüneli jeolojik olarak Kuzey Anadolu Fay Hattı ana kolu ile Düzce Fayı arasındaki tektonik bloktan geçmektedir. Tünelin İstanbul tarafı (Asarsuyu girişi) metakristalin temel kayaları içerisinde yer almakta iken Ankara tarafı (Elmalık girişi) sedimanter kayaçlar içerisinde bulınmaktadır. Tünel bu iki birimi Bakacak fayı ile kesilmektedir. Tünelde kazı aşamasında en büyük sorunların meydana geldiği Elmalık girişinde Elmalık fayı bulunmakta olup, tünelin bu bölümlerinde 1.2 m’ye varan deformasyonlar ile karşılaşılmıştır. Ayrıca Elmalık sağ tünelde fay geçişi sırasında 1996 yılında göçük meydana gelmiş, 12 Kasım 1999 Düzce Depreminde ise Elmalık sol tünel tamamen kapanarak göçük oluşmuştur. Yeni Avusturya Tünelcilik Yöntemi ile projelendirilen Bolu Tünellerinde yaşanan sorunlar ve geliştirilen destek sistemleri tünelcilik açısından çok değerli bilgiler içermektedir. Bu çalışma kapsamında Bolu Tünel destek sistemleri Flac3d programı ile 3 boyutlu olarak incelenmiş, iki tünelin birbirine olan etkisi, üst yarı, alt yarı ve invert kazılarında meydana gelen değişimler ortaya konmuştur.