Yang Liu Yang

Prof. Dr. Yang Liu Yang


Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2019 in Engineering Structures
Verified
Journal Article
Closed access
YYYang Liu Yang
Yang Liu Yang
ZGZixiong Guo
Zixiong Guo
XLXiaojuan Liu
Xiaojuan Liu
RCRachel Chicchi
Rachel Chicchi
BSBahram Shahrooz
Bahram Shahrooz

25 October 2022 in Journal of Building Engineering
Verified
Journal Article
Closed access
HCHAI CHEN
HAI CHEN
ZGZi-Xiong Guo
Zi-Xiong Guo
SBSyed Humayun Basha
Syed Humayun Basha
YYYang Liu Yang
Yang Liu Yang

8 February 2023 in Structures
Verified
Journal Article
Closed access
XLXiaojuan Liu
Xiaojuan Liu
TZTao Zhong
Tao Zhong
HJHuanjun Jiang
Huanjun Jiang
YYYang Liu Yang
Yang Liu Yang
GZGuo Zixiong
Guo Zixiong

1 February 2020 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
YYYang Liu Yang
Yang Liu Yang
HCHai Chen
Hai Chen
ZGZi-Xiong Guo
Zi-Xiong Guo
HHHong-Song Hu
Hong-Song Hu
Hybrid coupled wall (HCW) systems, especially with properly designed steel coupling beams, are efficient lateral load resisting systems. To further improve the seismic resiliency of HCW structures after major earthquakes, a new hybrid system consisting of steel plate composite structural wall piers and steel coupling beams with a replaceable fuse was developed. This paper presents an experimental program of three half-scaled subassemblies subjected to pseudo-static cyclic loading. Each test specimen consisted of two segments of composite wall piers and a steel coupling beam with and without a replaceable fuse. The details of the wall piers were identical for the three subassemblies, but three different coupling beams with the same span/depth ratio were used. One subassembly using a steel coupling beam without a replaceable fuse served as the control specimen, which was loaded up to 10% chord rotation following a preselected loading protocol. The other two specimens employed the new hybrid system. The fuse in these two subassemblies was replaced in situ after subjecting the coupling beam to 2% chord rotation, and the specimen was subsequently loaded up to 10% chord rotation. A detailed evaluation of the test results indicates that the new hybrid system can exhibit excellent performance and the replaceable fuse (and its connection details) proved to be a reliable technique to restore the performance after subjecting the coupling beam to chord rotations that are expected during design-level earthquakes. The load transfer mechanism and seismic performance varied depending on the details of the replaceable details of steel coupling beams.


9 January 2026 in Structures
Verified
Journal Article
Closed access
JLJie Liu
Jie Liu
YYYang Liu Yang
Yang Liu Yang
XLXiaojuan Liu
Xiaojuan Liu
CZChaozhong Zhang
Chaozhong Zhang
Yong YeYong Ye
Yong Ye
WSWafaa Mohamed Shaban
Wafaa Mohamed Shaban