Piotr Małkowski

Prof. Piotr Małkowski

Geomechanics, Civil Engineering and Geotechnics, AGH University of Krakow, Kraków, Małopolskie, Poland
orcid

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2020 in International Journal of Mining Science and Technology
Verified
Journal Article
Open access
PMPiotr Małkowski
Piotr Małkowski
ZNZbigniew Niedbalski
Zbigniew Niedbalski

1 January 2018 in Journal of Sustainable Mining
Verified
Journal Article
Open access
PMPiotr Małkowski
Piotr Małkowski
ŁOŁukasz Ostrowski
Łukasz Ostrowski
Jarosław BrodnyJarosław Brodny
Jarosław Brodny

6 July 2023 in International Journal of Rock Mechanics and Mining Sciences
Verified
Journal Article
Closed access
YCYanjiang Chai
Yanjiang Chai
LDLinming Dou
Linming Dou
WCWu Cai
Wu Cai
PMPiotr Małkowski
Piotr Małkowski
XLXuwei Li
Xuwei Li
JCJinrong Cao
Jinrong Cao


6 October 2020 in International Journal of Coal Science & Technology
Verified
Journal Article
Open access
PDF file
PMPiotr Małkowski
Piotr Małkowski
ZNZbigniew Niedbalski
Zbigniew Niedbalski
TBTafida Balarabe
Tafida Balarabe
Geomechanical data are never sufficient in quantity or adequately precise and accurate for design purposes in mining and civil engineering. The objective of this paper is to show the variability of rock properties at the sampled point in the roadway’s roof, and then, how the statistical processing of the available geomechanical data can affect the results of numerical modelling of the roadway’s stability. Four cases were applied in the numerical analysis, using average values (the most common in geomechanical data analysis), average minus standard deviation, median, and average value minus statistical error. The study show that different approach to the same geomechanical data set can change the modelling results considerably. The case shows that average minus standard deviation is the most conservative and least risky. It gives the displacements and yielded elements zone in four times broader range comparing to the average values scenario, which is the least conservative option. The two other cases need to be studied further. The results obtained from them are placed between most favorable and most adverse values. Taking the average values corrected by statistical error for the numerical analysis seems to be the best solution. Moreover, the confidence level can be adjusted depending on the object importance and the assumed risk level.

1 January 2020 in Mining of Mineral Deposits
Verified
Journal Article
Closed access
PMPiotr Małkowski
Piotr Małkowski
ZNZbigniew Niedbalski
Zbigniew Niedbalski
TMTadeusz Majcherczyk
Tadeusz Majcherczyk
ŁBŁukasz Bednarek
Łukasz Bednarek