Faiq M. S. Al-Zwainy

Dr. Faiq M. S. Al-Zwainy


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2024 in AIP Conference Proceedings
Verified
Conference Paper
Open access
PDF file
HRHussam K. Risan
Hussam K. Risan
FAFaiq M. S. Al-Zwainy
Faiq M. S. Al-Zwainy
AAAdel A. Al-Azzawi
Adel A. Al-Azzawi
Technical managing of a typical experiment in engineering or science could be a hard and daunting task. Often, experimentalists are not certain what is first an

3 April 2025 in Edelweiss Applied Science and Technology
Verified
Journal Article
Open access
PDF file
SASaja Al-Dhamad
Saja Al-Dhamad
RZRana I. K. Zaki
Rana I. K. Zaki
FAFaiq M. S. Al-Zwainy
Faiq M. S. Al-Zwainy
IVIbrahim Farouq Varouqa
Ibrahim Farouq Varouqa
AOAseel H. Obaid
Aseel H. Obaid
The purpose of the digital models is to aid users in better understanding the response and behavior of the construction management system under different conditions. The main advantage of the digital models lies in the ability to use possible alternatives and analyze the effect of various factors on the project management system, both before and during performance. This study will review previous works. Types of BIM and simulation techniques are discussed, along with the reasons for using this technique, its applications, and characteristics in the construction sector. The application of digital models in the construction sector is also reviewed. The research concludes that simulation modeling has a revolutionary impact on construction project management, as it provides advanced tools for planning efficiency, resource allocation, cost calculation, sustainability, and risk management. While obstacles such as the requirement for skilled personnel and the integration with existing systems remain, the benefits of simulation modeling in terms of cost savings, improved efficiency, and more effective decision-making make it an essential aid for construction projects.

2 December 2024 in Engineering, Technology & Applied Science Research
Verified
Journal Article
Open access
PDF file
SMSuha falih Mahdi
Suha falih Mahdi
SASaja Al-Dhamad
Saja Al-Dhamad
BSBilal Muiassar M. Salih
Bilal Muiassar M. Salih
FAFaiq M. S. Al-Zwainy
Faiq M. S. Al-Zwainy
The nature of the construction business and building projects necessitates the capacity to manage extensive and intricate data and documentation. The processes for documenting, exchanging, and updating data constitute one of the principal administrative challenges being currently confronted by the construction project management. As a consequence of the continued reliance on paper-based processes evidenced in the Iraqi businesses and construction projects, a considerable volume of documentation is likely to accumulate, thereby increasing the complexity and time required for specific data to be retrieved. In this study, the Support Vector Machine (SVM) and Building Information Modeling (BIM) models were used to document projects by employing the MATLAB-Revit software. The findings demonstrate that the project timeline is also recorded because it is related to the suggested model, which is designed to produce an effective model that mimics reality. A comparative analysis of the data pertaining to the foundations, columns, walls (24 cm and 12 cm), floors, and slabs of four multi-story buildings, was conducted. This analysis was divided into three categories: estimated, SVM-BIM, and actual documentation. The findings indicated that the proposed model demonstrated a high degree of accuracy in predicting the material quantities required in building construction. These values were found to be in close proximity to, and aligned with, the actual documentation.

19 October 2025
Verified
Book Chapter
Closed access
PDF file
MAMaryam G. S. Al-Khazrajy
Maryam G. S. Al-Khazrajy
FAFaiq M. S. Al-Zwainy
Faiq M. S. Al-Zwainy
AOAseel H. Obaid
Aseel H. Obaid
Abu Elnasr SobaihAbu Elnasr Sobaih
Abu Elnasr Sobaih
Ibrahim A. ElshaerIbrahim A. Elshaer
Ibrahim A. Elshaer