Huang Xing

Dr. Huang Xing


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2023 in Underground Space
Verified
Journal Article
Open access
YBYin Bo
Yin Bo
HXHuang Xing
Huang Xing
Yucong PanYucong Pan
Yucong Pan
YFYanfang Feng
Yanfang Feng
PDPenghai Deng
Penghai Deng
QLQuansheng Liu
Quansheng Liu

24 September 2022 in Acta Geotechnica
Verified
Journal Article
Closed access
PDF file
XYXin Yin
Xin Yin
HXHuang Xing
Huang Xing
YPYucong Pan
Yucong Pan
QLQuansheng Liu
Quansheng Liu

24 October 2023 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
ZDZ. W. Ding
Z. W. Ding
CZC. F. Zhang
C. F. Zhang
HXHuang Xing
Huang Xing
QLQ. S. Liu
Q. S. Liu
BLB. Liu
B. Liu
YLY. X. Liu
Y. X. Liu

17 September 2021 in Frontiers in Earth Science
Verified
Journal Article
Open access
YKYongshui Kang
Yongshui Kang
ZGZhi Geng
Zhi Geng
LLLinhai Lu
Linhai Lu
LCLei Chen
Lei Chen
XLXuewei Liu
Xuewei Liu
HXHuang Xing
Huang Xing
There is high risk of water inrush and ground collapse accidents when tunnelling in karst areas. Based on the case study of an urban metro tunnel, this paper focuses on karst cave treatment and waterproofing strategies for earth pressure balancing (EPB) shield tunnelling in karst areas containing large amounts of karst caves and fissures. When the shield machine enters the karst area, water gush easily occurs, posing serious threats to tunnelling safety. The distribution characteristic of limestone fractures, karst caves, and fissures in the karst area were analyzed according to the geological survey results. Further, water inrush risk and engineering difficulties were analyzed. Subsequently, a compound karst cave treatment and waterproofing strategy for EPB shield tunnelling was proposed and implemented. Water inflow is successfully reduced and ground collapse accident is avoided using the compound karst cave treatment and waterproofing strategy.

9 January 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
TYTaihua Yang
Taihua Yang
TWTian Wen
Tian Wen
HXHuang Xing
Huang Xing
BLBin Liu
Bin Liu
HSHongbing Shi
Hongbing Shi
GSGuangzu Sheng
Guangzu Sheng
Based on the left tunnel of the Liuxiandong Station to Baimang Station section of Shenzhen Metro Line 13 (China), a prediction model for the advanced rate of dual-mode shield tunneling in complex strata was established to explore intelligent tunneling technology in complex ground. Firstly, geological parameters of the complex strata and on-site monitoring parameters of EPB/TBM dual-mode shield tunneling were collected, with tunneling parameters, shield tunneling mode, and strata parameters selected as input features. Subsequently, the Isolation Forest algorithm was employed to remove outliers from the original advance parameters, and an improved mean filtering algorithm was applied to eliminate data noise, resulting in the steady-state phase parameters of the shield tunneling process. The base model was chosen as the Long-Short Term Memory (LSTM) recurrent neural network. During the model training process, particle swarm optimization (PSO), genetic algorithm (GA), differential evolution (DE), and Bayesian optimization (BO) algorithms were, respectively, combined to optimize the model’s hyperparameters. Via rank analysis based on evaluation metrics, the BO-LSTM model was found to have the shortest runtime and highest accuracy. Finally, the dropout algorithm and five-fold time series cross-validation were incorporated into the BO-LSTM model, creating a multi-algorithm-optimized recurrent neural network model for predicting tunneling speed. The results indicate that (1) the Isolation Forest algorithm can conveniently identify outliers while considering the relationship between tunneling speed and other parameters; (2) the improved mean filtering algorithm exhibits better denoising effects on cutterhead speed and tunneling speed; and (3) the multi-algorithm optimized LSTM model exhibits high prediction accuracy and operational efficiency under various geological parameters and different excavation modes. The minimum Mean Absolute Percentage Error (MAPE) prediction result is 8.3%, with an average MAPE prediction result below 15%.

17 March 2022 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
HXHuang Xing
Huang Xing
QLQuan-Sheng Liu
Quan-Sheng Liu
YBYin Bo
Yin Bo
BLBin Liu
Bin Liu
ZDZiwei DING
Ziwei DING
QZQuan-Tai Zhang
Quan-Tai Zhang