GATOTO Placide

GATOTO Placide


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 October 2023 in Preprints.org
Verified
Preprint
Open access
PDF file
GPGATOTO Placide
GATOTO Placide
MLMichel Roddy Lollchund
Michel Roddy Lollchund
The electricity generated from fossil fuel and nuclear energy has negative impacts on the environment and has shown a need to search for and promote the use of clean, renewable and sustainable energy resources such as wind, solar and geothermal resources. Nowadays, wind energy resource has emerged as the fastest-growing source of energy on an overall scale. However, the selection of the best location for constructing a wind farm is a vital issue that can be considered a site selection problem, which involves various conflicting factors. Therefore, it is classified as a multi-criteria decision-making (MCDM) problem. In this research, the site selection of wind power plants is conducted in Burundi country. The Fuzzy Analytic Hierarchy Process (FAHP) was used to weigh the criteria considering their relative importance. The main factors affecting optimal wind farm location considered in this study are wind speed, slope, distance from the grid network, distance to roads, and land use/land cover (LULC). Furthermore, a geographic information system (GIS) is utilized to generate the final suitability wind farm locations map. The obtained results show that 20.91% of the total study area is suitable; nevertheless, only 1.96% is highly suitable for wind farm placement. The western part of Burundi is concluded to be the most suitable area for wind farm construction and the most area is situated in Lake Tanganyika.

19 August 2026 in Discover Energy
Verified
Journal Article
Open access
PDF file
GPGATOTO Placide
GATOTO Placide
CRCartland Richard
Cartland Richard
Burundi’s electricity sector remains highly dependent on hydropower, making it vulnerable to climate variability and highlighting the need for diversified renewable energy sources. This study presents a techno-economic assessment of wind power potential at four wind-prone locations in Burundi using three Enercon wind turbines: E-40/5.4 (500 kW), E-58/10.58 (1 MW), and E-70 E4 (2 MW). Wind speeds were obtained from Weather Research and Forecasting (WRF) simulations and extrapolated to hub height using the power-law model. Annual Energy Production (AEP) was estimated from turbine power curves and capacity factors derived from wind-speed distributions. The Present Value of Cost (PVC) method was applied to estimate the unit cost of electricity by considering capital costs, operation and maintenance costs, discount rate, inflation, project lifetime, and salvage value. Results show that Site S1 exhibits the highest wind potential, with the 2 MW turbine producing approximately 29.5 GWh/year. The estimated unit cost of wind-generated electricity ranges from US$0.025 to US$0.22/kWh depending on site characteristics and turbine size. Among the evaluated turbines, the 500 kW E-40/5.4 consistently provides the lowest electricity cost due to its lower capital investment and favorable performance under local wind conditions. At the most favorable sites, wind electricity costs are comparable to or lower than current national electricity tariffs in Burundi. The findings indicate that appropriately sized small- and medium-scale wind turbines could provide a cost-competitive complementary energy source, improve electricity access in underserved areas, and enhance long-term energy security and climate resilience. Graphic Abstract