Numerous studies have developed extensions to the IFC schema to meet the needs of specialized domains or represent nascent technologies, and in turn have expanded the scope of interoperability for BIM data exchanges. However, these studies used varying approaches for IFC extensions and validation, making it difficult to identify research gaps and agree on legitimate extension protocols. This study collected 64 studies of IFC schema extensions spanning over two decades, from 2001 to 2022. The analysis first focused on categorizing these cases with respect to their target domains and sectors, their purpose and extension approaches, as well as their methods for implementation and validation. Timeline analyses were also conducted to track the temporal trends over the specified period. The results revealed that architectural cases have recently shifted from process to product representations due to new technology adoptions, while infrastructure cases, initially centered on major sector elements, have transitioned towards operation and maintenance processes. The findings also showed the need for a more holistic and organized approach for extensions, as current ad hoc developments were limited to products and processes only applicable for specific sectors.
The South Korean government has mandated the use of Building Information Modeling (BIM) as the main medium for design deliverables in public projects. Such stipulations require detailed BIM models to be submitted in the detailed design phases, which places a burden especially on small- to medium-sized design firms. The requirement means that both the interior and exterior finishes of a building need to be explicitly modeled, which when performed manually is labor intensive and error prone. The goal of this study was to apply parametric modeling techniques to automatically model such details, focusing on the exterior finishes. Through interviews with design experts, four elements were selected: parapets, external wall finishes, downspouts, and inspection ladders. Parametric processes and rules for each finish were developed and subsequently programmed as add-ins in Autodesk Revit. Validation through case studies conducted using three different BIM models resulted in the average scores of 92.28% and 92.44% in terms of accuracy and efficiency, respectively. In particular, downspouts achieved a perfect accuracy score, while external wall finishes achieved a 94.42% reduction in modeling time. Modeling errors, which occurred due to inconsistencies in the test models, also demonstrate the need for specifying uniform modeling conventions of BIM model submissions in the detailed design phases.