Arief Nurdini

Mr. Arief Nurdini


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 January 2023 in Jurnal Ilmiah Teknik
Verified
Journal Article
Open access
PDF file
BABellinda Ayustina
Bellinda Ayustina
ANArief Nurdini
Arief Nurdini
ALArdhy Lazuardy
Ardhy Lazuardy
Rumah Tempe Indonesia is a business sector that produces various processed soybeans, one of which is tempeh with two brands, namely Tempekita and Tempe Kim's. Rumah Tempe Indonesia has also started implementing a make to stock production system in its business processes. However, until now Rumah Tempe Indonesia has not implemented a specific method to support the production system it implements. This production system can cause problems including the amount of production that does not match consumer needs, causing a shortage or excess of products which are very inefficient for the company's business continuity. These problems can be solved through production planning using the selected aggregate planning strategy or the strategy that produces the lowest total production costs. This strategy is implemented in the preparation of a production master schedule to estimate the quantity of tempe products that must be met in the next period. In this study, two strategies were used, namely the level strategy with a production cost of 1,403,904,740.04, - and the chase strategy with a production cost of 1,404,149,544.96, -. Based on these considerations of production costs, the strategy chosen to be continued in making the master production schedule is the level strategy. The Master Production Schedule is made based on the calculation results of the disaggregation process on the production units of each brand for each period. The amount of Tempekita and Tempe Kim's production based on the Master Production Schedule (JIP) respectively for the 1st period was 2790 and 13099 pcs, the 2nd period was 1901 and 10624 pcs, the 3rd period was 2104 and 10421 pcs, the 3rd period 4th period 3224 and 8897 pcs, 5th period 4196 and 8329 pcs, 6th period 4117 and 8004 pcs, 7th period 3735 and 8790 pcs, 8th period 4799 and 7726 pcs, 7th period 9th of 3700 and 7613 pcs, 10th period of 5409 and 7116 pcs, 11th period of 5329 and 6792 pcs, 12th period of 5070 and 7455 pcs.

27 October 2024
Verified
Book Chapter
Closed access
PDF file
ANArief Nurdini
Arief Nurdini
RNRahmat Nurcahyo
Rahmat Nurcahyo
FFFarizal Farizal
Farizal Farizal

22 May 2024 in Jurnal Teknik dan Science
Verified
Journal Article
Open access
PDF file
BABintang Ardiyansyah
Bintang Ardiyansyah
ALArdhy Lazuardy
Ardhy Lazuardy
ANArief Nurdini
Arief Nurdini
PT Mandom Indonesia Tbk. is a company that manufactures cosmetic products. In the process of packing, operators are directly related to work and have a risk of work accidents. PT Mandom Indonesia's work accident data in the last 3 years (2020 - 2022) shows that there are still work accidents in the packaging section, in 2020 there were 6 cases of work accidents, in 2021 there were 4 cases of work accidents, and in 2022 there were 3 cases of work accidents. This proves the need to implement occupational safety and health to reduce work accidents. This paper aims to identify potential hazards and risks, assess the level of risk that has been identified, and control risks that can potentially cause work accidents in the packaging section. HIRARC is a method of identifying potential hazards found in each type of work. Hazard identification is carried out in the packaging section. The packaging section has 10 work activities with 28 potential hazards. The risk assessment results carried out in the packaging section are 28 potential hazards and potential risks with 8 high risk, 11 medium risk, and 9 low risk. Risk control is carried out on activities with high and medium risks. Of 10 work activities, 9 still have 8 high risk and 11 medium risk. After controlling, the final assessment results in the packing section show a decrease, namely to 8 medium risk and 11 low risk. The controls carried out are engineering, administration, and using PPE.