Luchen Zhang

Luchen Zhang


Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 April 2023 in Water
Verified
Journal Article
Open access
PDF file
XZxueyu zheng
xueyu zheng
LZLuchen Zhang
Luchen Zhang
JYJiaxiu Yang
Jiaxiu Yang
SDShuaiqun Du
Shuaiqun Du
Shiqiang WuShiqiang Wu
Shiqiang Wu
SLShaoze Luo
Shaoze Luo
With the development of a 300 m high dam and large reservoir construction, the emergency drawdown capacity of cascade reservoirs, especially high dams, has become a hot issue of concern to all sectors of society while giving play to huge comprehensive benefits. Based on a thorough investigation of the current situation of drawdown facilities for high dams and large reservoirs with a height of 200 m or more in the world, this paper finds that drawdown facilities currently face difficulties such as insufficient drawdown capacity, poor safety and stability of high head structures, extremely high lift hoisting equipment, and high difficulty in high head water seal technology. It is pointed out that the key technologies that need to be urgently addressed for a deep drawdown of high dams and large reservoirs are the pressure-bearing capacity of gates and the capacity limit of hoists. As a result, the elevation of the bottom tunnel of the drawdown building cannot be arranged and the orifice is limited, and the drawdown depth and discharge capacity are limited.

2 December 2021 in Water
Verified
Journal Article
Open access
PDF file
HZhaichao zhang
haichao zhang
LZLuchen Zhang
Luchen Zhang
Shiqiang WuShiqiang Wu
Shiqiang Wu
FWFuming Wang
Fuming Wang
ZZZhenggang Zhan
Zhenggang Zhan
WBWei Bao
Wei Bao
Under the condition of a large dip angle between the flood discharging structure axis and the downstream cushion pool centerline, the downstream flow connection for the discharging tunnel group is poor, and the lower air pressure in high-altitude areas increases its influence on the trajectory distance of the nappe, further increasing the difficulty of predicting the flood discharge and energy dissipation layout. Based on the RM hydropower project with the world’s highest earth-rockfill dam, this paper studies the problem of a large included angle flip energy dissipation layout of a tunnel group flood discharge using the method of the overall hydraulic physical model test. The test results show that the conventional flip outlet mode has a long nappe falling point, a serious shortage of effective energy dissipation space, a large dynamic hydraulic pressure impact peak value on the bottom slab and side wall of the plunge pool, a poor flow connection between the outlet of the plunge pool and the downstream river channel, and a low energy dissipation rate. Considering the influence of a low-pressure environment, when the “transverse diffusion and downward incidence” outflow is adopted, the nappe falling point shrinks by 11 m, the energy dissipation form of the plunge pool is greatly improved, the effective energy dissipation space is increased by 159%, the RMS of the maximum fluctuating pressure is reduced by 74%, the outflow is smoothly connected with the downstream river, the energy dissipation rate is increased by 0.8%, and the protection range of flood discharge atomization is significantly reduced. This effectively solves the safety problems of large included angle discharge return channels and the energy dissipation and erosion prevention of super-high rockfill dams.

2 August 2021 in Water
Verified
Journal Article
Open access
PDF file
XZxueyu zheng
xueyu zheng
LZLuchen Zhang
Luchen Zhang
Shiqiang WuShiqiang Wu
Shiqiang Wu
KSkai song
kai song
Due to the high flow velocity and easy cavitation of high-head drainage tunnels, it is usually necessary to set up aeration facilities. In particular, when the bottom slope of the tunnel is mild, the aeration facilities often have problems such as difficulty with air intake, short cavity, and serious water accumulation, which aggravate the risk of cavitation damage. In this paper, based on the Rumei hydropower station and the Gushui hydropower station, a method combining theoretical analysis and model testing is used to solve the connection problem between the aeration facility and the 3% mild bottom slope of a tunnel body, and the aeration facility shape of “lifting ridge + flat (mild) slope + steep slope” is put forward. The research shows that the steep slope section can smoothly connect the water flow over the cantilever, reduce the jet impact angle, prevent the water from backtracking, and produce a long and stable cavity in the flat (mild) slope section. The aeration concentration along the bottom of the tunnel is higher than 3% at 140 m over the top of the dam. The aeration effect of this type is better, and it can provide effective long-distance protection for a drainage tunnel with high head and a mild bottom slope.

19 July 2025 in Water
Verified
Journal Article
Open access
PDF file
ZZZehui Zhou
Zehui Zhou
LYLei YU
Lei YU
YZYu Zhang
Yu Zhang
BJBenyou Jia
Benyou Jia
LZLuchen Zhang
Luchen Zhang
SLShaoze Luo
Shaoze Luo
Accurate reservoir outflow simulation is crucial for water resource management. However, traditional machine learning-based simulation methods have not sufficiently considered the physical constraints of reservoir operation, which may lead to unrealistic issues such as negative outflows or water levels exceeding the reservoir’s own limitations. This study integrates physical constraints into the random forest (RF) model using the Sigmoid function, constructing a physics-constrained random forest model (PC-RF) for cascade reservoir outflow simulation. A stratified sampling strategy based on hydrological year types is used to create the training and validation datasets. The coefficient of determination (R2) and root mean square error (RMSE) are used to evaluate the model’s performance for medium- to long-term predictions of reservoir outflows on a 10-day time scale. Additionally, the mean decrease in impurity method is used to assess the importance of input features, thereby enhancing the model’s interpretability. The application the Yalong River cascade reservoir indicates that (1) compared to traditional RF, the PC-RF achieved significant breakthroughs, with an increase of 37.13% in the R2 and a decrease of 60.04% in the RMSE when simulating outflows from the Lianghekou Reservoir, with all reservoirs maintaining an R2 above 0.95, with no instances of unrealistic outcomes; (2) PC-RF effectively integrated historical operational patterns with top three features being previous period outflow, current inflow, and previous period inflow, providing interpretable insights for operational decision-making. The PC-RF model demonstrates high accuracy and practical potential in cascade reservoir outflow simulation, providing valuable applications for cascade reservoir management and water resource optimization.

21 January 2024 in Water
Verified
Journal Article
Open access
PDF file
YGYijiao Guo
Yijiao Guo
LZLuchen Zhang
Luchen Zhang
LYLei YU
Lei YU
SLShaoze Luo
Shaoze Luo
CLChuang Liu
Chuang Liu
YLYuan Liu
Yuan Liu
To account for changes in the performance of spillway aerator structures of high-altitude dams, depressurization generalized model experiments and theoretical analyses were conducted in this study. Measurements were taken for ventilation hole air velocity, cavity subpressure, cavity length, and air concentration in crucial regions. The study proposed correction formulas for the aeration coefficient and water air concentration in aerator devices operating under low atmospheric pressure. The pressure range of the experiments was between 26.3 kPa and 101.3 kPa. The results indicated that with decreasing atmospheric pressure, ventilation hole air velocity, ventilation volume, cavity subpressure, and water air concentration all showed a decreasing trend. For every 15 kPa decrease in pressure, ventilation hole air velocity decreased by approximately 24%. When the atmospheric pressure dropped from 101.3 kPa to 26.3 kPa, the cavity subpressure decreased and eventually approached zero. The maximum reduction in air concentration was 14.9% in the cavity backwater area, 38.5% at the cavity end, and 38.3% in the downstream bubble escape segment. The proposed correction formulas could be used for a rapid estimation of ventilation volume and air concentration in low-pressure environments. This research provides a scientific basis for the design of aeration devices in water projects located in high-altitude regions.

5 August 2026 in Water
Verified
Journal Article
Open access
PDF file
XZxueyu zheng
xueyu zheng
LZLuchen Zhang
Luchen Zhang
JYJiaxiu Yang
Jiaxiu Yang
BLBin Lu
Bin Lu
HZHezuo Zhang
Hezuo Zhang
YLYuan Liu
Yuan Liu
High dams and large reservoirs serve flood control, power generation, water supply and ecological security, where rapid safe drawdown is vital for emergency handling and long-term safe operation. Targeting undefined rapid drawdown control standards for over-200 m ultra-high earth-rockfill dams, this study selects 200 m, 250 m and 300 m earth core rockfill dams for finite element calculations of transient unsaturated seepage and slope stability under varying drawdown rates. It analyzes how drawdown rate, drawdown depth and dam height affect dam safety, and tests the sensitivity of rockfill shear strength indices. Results reveal rapid drawdown produces prominent phreatic line lag, which worsens with faster drawdown and taller dams. Slope safety factors fall then rise during water level decline with a critical minimum, and taller dams respond more sensitively to drawdown rate. The allowable drawdown limits are 10 m/d, 8 m/d and 6 m/d for 200 m, 250 m and 300 m dams, paired with maximum safe drawdown depths of 108 m, 140.4 m and 154.8 m. Rockfill cohesion c is highly sensitive at 0–40 kPa; each 2° rise in internal friction angle φ lifts the safety factor by roughly 7.3%. The findings offer theoretical and technical references for drawdown facility design and emergency regulation of reservoirs with dams exceeding 200 m.