Fang Dai

Dr. Fang Dai


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 December 2024 in Computers and Geotechnics
Verified
Journal Article
Closed access
YWyou wang
you wang
QFQianjun Fan
Qianjun Fan
FDFang Dai
Fang Dai
RWRui Wang
Rui Wang
BDBosong Ding
Bosong Ding

18 July 2024 in PLOS ONE
Verified
Journal Article
Open access
PDF file
ZZZhenchu Zhao
Zhenchu Zhao
YZYuan Zhang
Yuan Zhang
FDFang Dai
Fang Dai
The deformation of pile caused by tunnel excavation will weaken the bearing capacity of the foundation. In order to investigate the deformation response of pile induced by the construction of three-hole small spacing tunnel, the DEM-FDM (discrete element method and finite difference method) coupling numerical simulation method were used to simulate the deformation process of pile during tunnel excavation. This paper probed into the deformation response of pile by three factors: the length of pile, the pile-tunnel spacing, and the three-hole tunnel construction. The results showed that, as the pile-tunnel spacing decreases, the incremental horizontal displacement of the pile top became more significant when the three-hole tunnel was excavated. The excavation resulting in four zones of horizontal displacement concentration. The prominent locations were mainly concentrated on both sides of the tunnel and the ground directly above the tunnel. The research findings of this study can provide insights and references for the design and construction of shield tunneling under passing piles.