Lucas Santiago Nepomuceno

Mr. Lucas Santiago Nepomuceno

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 November 2023 in Energies
Verified
Journal Article
Open access
PDF file
LNLucas Santiago Nepomuceno
Lucas Santiago Nepomuceno
LOLayon Mescolin de Oliveira
Layon Mescolin de Oliveira
IJIvo Chaves Silva Junior
Ivo Chaves Silva Junior
EOEdimar José Oliveira
Edimar José Oliveira
APArthur Neves de Paula
Arthur Neves de Paula
This article proposes a solution to the Profit-Based Unit Commitment (PBUC) problem to maximize the profit of a power generation company that owns thermal units and compressed air energy storage (CAES) systems, considering the Day-Ahead market. The proposed methodology is more realistic as it considers a mixed-integer nonlinear formulation of the PBUC. The problem is solved through two stages, with Stage 1 dedicated to obtaining the operational state of the generating units (On or Off) and the operation mode of the storage system (energy exchange: charging, discharging, idle). Stage 2 determines the dispatch of power from the thermoelectric units and the energy exchange in the storage system. The analysis of the system consisting of 20 thermoelectric units and three storage systems shows the efficiency of the proposed method in making decisions for the power generation company and is therefore promising for real-world applications.

11 June 2025 in Technologies
Verified
Journal Article
Open access
PDF file
EOEdimar José Oliveira
Edimar José Oliveira
LNLucas Santiago Nepomuceno
Lucas Santiago Nepomuceno
LOLeonardo Willer De Oliveira
Leonardo Willer De Oliveira
APArthur Neves de Paula
Arthur Neves de Paula
This paper presents a methodology for the co-expansion planning of transmission lines and energy storage systems, considering unit commitment constraints and uncertainties in load demand and wind generation. The problem is formulated as a mixed-integer nonlinear program and solved using a decomposition-based approach that combines a genetic algorithm with mixed-integer linear programming. Uncertainties are modeled through representative day scenarios obtained via clustering. The methodology is validated on a modified IEEE 24-bus system. The results show that co-planning reduces total expansion costs by 14.69%, annual operating costs by 26.19%, and wind curtailment by 91.99% compared to transmission only expansion. These improvements are due to the flexibility introduced by energy storage systems, which enables more efficient thermal dispatch, reduces fuel consumption, and minimizes renewable energy curtailment.

30 April 2026 in Preprints.org
Verified
Preprint
Open access
PDF file
EOEdimar José Oliveira
Edimar José Oliveira
LNLucas Santiago Nepomuceno
Lucas Santiago Nepomuceno
APArthur Neves de Paula
Arthur Neves de Paula
RPRaphael Paulo Braga Poubel
Raphael Paulo Braga Poubel
LOLeonardo Willer De Oliveira
Leonardo Willer De Oliveira
Multi-Stage Transmission Network Expansion Planning (MS-TNEP) is critical for adapting power grids to long-term renewable integration. However, simultaneously incorporating N-1 security, active power losses, and spatial generation uncertainties imposes prohibitive computational complexity. This paper proposes a probabilistic MS-TNEP model evaluated over a 20-year horizon. To overcome intractability, a hybrid decomposition framework is employed, delegating discrete combinatorial investment decisions to an upper-level metaheuristic while resolving operational feasibility, power losses via fictitious nodal demand, and N-1 contingencies through lower-level linear programming. Furthermore, a novel Pack-Based Grey Wolf Optimizer (PBGWO) is introduced to enhance convergence in this constrained domain. The approach is validated on the modified Garver and the 46-bus Southern-Brazilian systems under multiple wind and conventional generation scenarios. Comparative analysis against the Genetic Algorithm, standard GWO, and Whale Optimization Algorithm reveals that PBGWO consistently identifies the optimal expansion schedules.

22 October 2022 in Electrical Engineering
Verified
Journal Article
Closed access
PDF file
EOEdimar José Oliveira
Edimar José Oliveira
LNLucas Santiago Nepomuceno
Lucas Santiago Nepomuceno
GSGabriel Schreider da Silva
Gabriel Schreider da Silva
MCMonique Ribeiro da Costa
Monique Ribeiro da Costa
APArthur Neves de Paula
Arthur Neves de Paula
LOLeonardo Willer De Oliveira
Leonardo Willer De Oliveira

1 January 2021
Verified
Conference Paper
Closed access
LNLucas Santiago Nepomuceno
Lucas Santiago Nepomuceno
GSGabriel Schreider Silva
Gabriel Schreider Silva
EOEdimar Jose Oliveira
Edimar Jose Oliveira
APArthur Neves Paula
Arthur Neves Paula
EBEdmarcio Antonio Belati
Edmarcio Antonio Belati
This work proposes the application of the Nomadic People Optimizer (NPO) to solve the economic dispatch problem considering Prohibitive Operating Zones (POZ). The NPO is a swarm-based metaheuristic recently introduced in the literature and still under-explored. In addition, the POZ increase the difficulties to find the optimal solution of the economic dispatch problem. The performance of the proposed methodology is compared with others metaheuristics present in the literature. Also, a sensibility analysis was performed. The NPO performed better than Ant Colony Optimization (ACO) and Whale Optimization Algorithm (WOA) metaheuristics in solving the problem.

1 January 2026 in IEEE Access
Verified
Journal Article
Open access
LNLucas Santiago Nepomuceno
Lucas Santiago Nepomuceno
APArthur Neves de Paula
Arthur Neves de Paula
EOEdimar José Oliveira
Edimar José Oliveira
LOLeonardo Willer De Oliveira
Leonardo Willer De Oliveira