Zhang Zhihua

Dr. Zhang Zhihua

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 July 2023 in CATENA
Verified
Journal Article
Closed access
Huang JinquanHuang Jinquan
Huang Jinquan
XLXiaolan Liu
Xiaolan Liu
JLJigen Liu
Jigen Liu
ZZZhang Zhihua
Zhang Zhihua
WZWenjie Zhang
Wenjie Zhang
YCYanfei Chen
Yanfei Chen

1 October 2016 in Construction and Building Materials
Verified
Journal Article
Closed access
ZZZhang Zhihua
Zhang Zhihua
XZXiedong Zhang
Xiedong Zhang
HQHongsheng Qiu
Hongsheng Qiu
MDMohammad Daddow
Mohammad Daddow

1 February 2020 in Construction and Building Materials
Verified
Journal Article
Closed access
XZXuan Zhang
Xuan Zhang
ZZZhang Zhihua
Zhang Zhihua
ZLZhida Li
Zhida Li
YLYunyu Li
Yunyu Li
TSTingting Sun
Tingting Sun

3 January 2020 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
LWLin Wu
Lin Wu
XZXiedong Zhang
Xiedong Zhang
ZZZhang Zhihua
Zhang Zhihua
WSWeichen Sun
Weichen Sun
Closely-spaced side-by-side mechanized twin tunnels are commonly used in urban metro transit systems. The aim of this paper was to investigate the influence of tunnel construction on an adjacent existing tunnel using the 3D discrete element method (DEM) and propose a new method to protect the existing tunnel. The first tunnel at the left side was initially included in the DEM model. The construction of the second adjacent tunnel at the right side was then modelled in phases. Displacement, stress variation, porosity variation, and coordination of surroundings of the first tunnel were investigated. The results showed that the excavation of the second tunnel had a great negative impact on the existing tunnel surroundings when the distance of twin tunnels was less than the diameter of the tunnel. The maximum horizontal displacement occurred at the angle of 45° and was equal to 103 mm. The influenced area of the existing tunnel is the surroundings between the tunnel crown and the spring line on the second tunnel side near the tunnel lining. The composite reinforcement method consists of pasted fiber reinforced plastic (FRP) sheet method and grouting in a specific area; thus, the structure safety and the normal operation of the existing tunnel nearby can be guaranteed. The protective method can give reference for similar project.

29 September 2018 in Granular Matter
Verified
Journal Article
Closed access
PDF file
ZZZhang Zhihua
Zhang Zhihua
YCYIFEI CUI
YIFEI CUI
DCDave H. Chan
Dave H. Chan
KTKarén A. Taslagyan
Karén A. Taslagyan

18 May 2018 in Journal of Zhejiang University-SCIENCE A
Verified
Journal Article
Closed access
PDF file
ZZZhang Zhihua
Zhang Zhihua
XZXie-Dong Zhang
Xie-Dong Zhang
YTYao Tang
Yao Tang
YCYi-Fei Cui
Yi-Fei Cui
目的 揭示汛期及常水位条件下地铁随机振动荷载作用下越江隧道管片及周边岩土体的动力响应及变形机制。