Bowen Wei

Dr. Bowen Wei


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 March 2018 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
YFYan Feng
Yan Feng
QBQian Bao
Qian Bao
LCLiu Chenglin
Liu Chenglin
BWBowen Wei
Bowen Wei
YZYou Zhang
You Zhang

30 August 2022 in Water
Verified
Journal Article
Open access
PDF file
FYFeng Yan
Feng Yan
NLNa Li
Na Li
ZYZhigang Yang
Zhigang Yang
BWBowen Wei
Bowen Wei
To evaluate the variation in ecological risk induced by pollutants from the construction of Baihetan Dam, the largest hydropower station under construction in the world, this study proposes a fuzzy hazard quotient (HQ) model designed on the basis of triangular fuzzy number (TFN) theory. The fuzzy HQ model uses hazardous TFN to evaluate the ecological risk including uncertain observation data, and the transition TFN to analyze the variation in ecological risk before and after the dam construction. The results show the following: (i) The ecological risk of ammonia nitrogen (NH3-N) showed a marked increasing trend after the construction of the dam because this activity weakened the degradation ability of the water body. The chronic hazard of NH3-N was classified as “medium” grade and its acute hazard was “low” grade. (ii) The crucial acute hazard factor for the local aquatic ecosystem was copper (Cu) and the key chronic hazard factor was lead (Pb). (iii) After the construction of Baihetan Dam, both the long-term and short-term hazardous TFNs of Cu were classified as “medium” grade. The acute hazard of Pb belonged to “low” grade with high certainty, whereas its chronic hazard classification had uncertainties. Its long-term hazardous vectors upstream were {0.000, 0.928, 0.072}, whereas its long-term hazardous vectors downstream were {0.000, 0.108, 0.892}. (iv) Both of the ecological risks of Cu and Pb showed substantial decreasing trends after the construction of Baihetan Dam because the impounding effect of Baihetan Dam promoted the settlement of heavy metals with sediment. (v) The hazardous TFN method can be applied to perform an ecological risk evaluation that accounts for uncertainties in the observation data set, and the transition TFN method can analyze the variation in ecological risk with a small sample size. Therefore, the fuzzy HQ model is effective for the evaluation of ecological risk induced by dam construction.

8 January 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
BWBowen Wei
Bowen Wei
DXDelong Xu
Delong Xu
HQHongwei Qi
Hongwei Qi
JYJianglin Yao
Jianglin Yao
NLNa Li
Na Li
The Yangtze River Economic Belt (YREB) is a critical region for ecological and environmental protection in China, exerting significant influence on regional and national development. However, the intensification of climate change poses severe challenges to its ecological service patterns. To address this, climate scenarios based on Shared Socioeconomic Pathways (SSPs) are integrated with the Annual Water Yield (AWY) module in the InVEST model to examine changes in water yield ecosystem services from 2000 to 2060. A quantitative impact assessment model was established to analyze these changes. The research findings reveal the following: (i) From 2000 to 2020, the total water yield of the YREB was 1.68 × 1012 m3. The average annual water yield under the four future SSP scenarios (2022–2060) is projected to range from 1.73 × 1012 m3 to 1.82 × 1012 m3. (ii) Among the four SSP scenarios, SSP1-2.6 exhibits the highest increase in water yield services, followed by SSP5-8.5, SSP3-7.0, and SSP2-4.5. (iii) The climate change impact index on water yield services (K) demonstrates a spatial distribution trend of high values in the east and low values in the west, with pronounced spatial variations. (iv) The comprehensive change index of water yield services (K*) across the 11 provinces and cities affected by climate change ranges from −0.0954 to 0.1005 under the four scenarios, indicating that climate change exerts both positive and negative impacts on water yield services in the YREB. (v) The quantitative impact assessment model constructed in this study offers scientific support for ecosystem restoration and water resource management optimization in the YREB.

3 July 2026 in Environmental Monitoring and Assessment
Verified
Journal Article
Closed access
PDF file
MZMeng Zhou
Meng Zhou
BWBowen Wei
Bowen Wei
YJYao Jiang
Yao Jiang
FYFeng Yan
Feng Yan