This article is devoted to an overview of the conducted work and the current status of decommissioning of the world’s first BN-350 industrial fast neutron reactor. The reactor was put into operation on 16 July 1973 in Aktau. In 1999, the government of Kazakhstan decided to shut down the reactor, and from that moment to the present, it has been in the decommissioning stage. All work on decommissioning the reactor facility was grouped into five stages. The first stage was completed in 2010 when the spent fuel of the BN-350 reactor was placed for long-term storage. The second stage is nearing completion. Research is currently underway to develop technologies for processing radioactive sodium. The goal of the third and fourth stages of the BN-350 reactor decommissioning is the comprehensive processing of liquid and solid radioactive waste. Now such waste is stored in special storage directly on the territory of the nuclear power plant.
The BN-350 is the first industrial fast neutron reactor in the history of nuclear energy. It is currently undergoing decommissioning. One of the key challenges of decommissioning is managing the solid radioactive waste that has accumulated throughout the reactor’s operational life. At the moment, the accumulated solid radioactive waste is stored in a storage facility within the BN-350 reactor complex. An analysis showed that more than ~7262 tons with 5.17 × 1014 Bq activity of various types of solid radioactive waste have been accumulated over the reactor operation. They are mainly represented by materials with low activity. At the same time, the main share of activity is comprised of highly active waste with a total mass of ~170 tons and an activity of 4.73 × 1014 Bq. A solid radioactive waste management strategy has been developed. It includes all stages from collection and classification to transportation and long-term storage. Modern technologies now offer new possibilities. Some radioactive waste can be processed and reused in other economic sectors. In particular, recycling metals and alloys can reduce the volume of solid radioactive waste. It can also return valuable materials to industrial use.
This paper presents the results of computational and physical studies on the production of corium and its retention in an MR’s melt trap of the Lava-B facility. A feature of the Lava-B facility used in the IAE NNC RK to study the processes occurring during a severe accident at a nuclear reactor, is the separation of the stages of the reactor core corium formation and its interaction with structural materials. The melting of materials takes place in an induction furnace with a hot crucible, after which it moves to a melt receiver (MR) in which the test object is located. In the case of studies of processes occurring outside the reactor vessel, this is a special trap, which is placed in the inductor to simulate decay heat. However, based on the conservative computational estimates, it was found that the inductor power in the MR can be sufficient to directly produce, melt, and, subsequently, maintain the corium in the liquid phase. In this regard, in order to optimize the experiments under controlled conditions, the authors came up with the idea to experimentally test the possibility of producing corium by induction heating directly in the MR’s melt trap. In addition, according to the authors, this method would obviate the problem of corium contact with the carbon environment of the melting furnace of the Lava-B facility. Previously, burden heating simulating corium was modeled on the computer using available parameters of the MR’s induction heater. Based on the numerical experiment, the conditions for physical modeling of the corium production in the MR’s melt trap were established. An analysis of the physical modeling showed that during the burden heating in the melt trap, its metal components became liquid, thus, forming a melt pool. However, in terms of this design of the trap, there were problems associated with the complete melting of all corium components, as well as with the integrity of the experimental device when forming the corium pool and during the actual physical modeling.
7 November 2024 in International Journal of Advanced Nuclear Reactor Design and Technology