26 January 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Elzbieta SzafrankoElzbieta Szafranko
Elzbieta Szafranko
MJMarlena Anna Jurczak
Marlena Anna Jurczak
In 2014, the European Union Directive 2014/24/EU was issued, which has provisions including information about the use of electronic technology for modelling buildings, referred to as BIM. According to various sources in the literature, with the help of BIM technology building designs can be prepared more quickly, while avoiding errors; it is also possible to generate and control any amendments in a building blueprint, promptly estimate costs of the building works planned, and implement a variety of activities connected with the maintenance of a new building once it is erected. In some EU states, initiatives have been launched leading to the introduction of BIM technology in public procurement, and the technology itself is now gaining popularity. However, the adaptation of this new technology is not always met with enthusiasm, and its implementation is hindered by many obstacles. The aim of this article is to conduct a broader analysis of the possibilities of BIM development in the construction industry based on data obtained from companies operating in the construction industry. The research used analysis of source materials, surveys, and targeted interviews. The study has demonstrated several barriers, of which the most important ones proved to be of financial nature, formal and legal considerations, and mentality, namely the unwillingness to learn, adopt novel solutions, and switch to a new way of working. The research was supported by a SWOT analysis.

22 February 2023 in Building and Environment
Verified
Journal Article
Open access
Elzbieta SzafrankoElzbieta Szafranko
Elzbieta Szafranko
MJMarlena Anna Jurczak
Marlena Anna Jurczak

15 December 2024
Verified
Conference Paper
Closed access
JHJolanta Harasymiuk
Jolanta Harasymiuk
Elzbieta SzafrankoElzbieta Szafranko
Elzbieta Szafranko
MJMarlena Anna Jurczak
Marlena Anna Jurczak
The study attempts to examine the current and potential effectiveness of selected tools used in environmental planning of construction projects in Poland. Environmental planning is a complicated and demanding process, and as such it should be supported by the use of environmental management applications. At the early investment planning stage, it is necessary to verify whether a construction project to be developed, in addition to a building permit, does not require a decision on environmental conditions. This decision precedes the issuance of building permits for projects implemented as undertakings with a significant impact on the environment. It should provide the authorities responsible for the procedures and the public with the information on what environmental effects the construction project may have on a local scale. The environmental impact assessments (EIA) database is an IT system used to collect, process and share information on EIA proceedings on a national scale. One of the key functionalities of this system should be to streamline the work of bodies participating in EIAs and to accelerate investment processes. The study focuses on a multidimensional analysis of the effectiveness of environmental management tools from the point of view of main stakeholders in construction projects, and proposes appropriate improvements.

22 January 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MJMarlena Anna Jurczak
Marlena Anna Jurczak
Maria TunkiewiczMaria Tunkiewicz
Maria Tunkiewicz
Civil defence shelters constitute an essential component of safety systems in emergency situations. The aim of this article is to assess the modernization potential of existing civil defence shelters in Poland, using a representative facility located in Olsztyn (Poland) as a case study. The analysis is based on a review of the current legal framework and identification of legislative gaps that affect the implementation of effective protective solutions. Within the case study, a detailed technical assessment of the protective structure was carried out, focusing on construction, protection against radiation and contamination, fire safety, and user ergonomics. Based on this assessment, a comparative analysis was performed between the surveyed facility and current as well as proposed technical requirements. The results revealed partial compliance with regulations while identifying significant deficiencies. To address these issues, measures such as replacing ventilation units with modern systems featuring automatic control, installing EI120-certified doors, improving emergency exit dimensions, and adding emergency lighting were proposed. Subsequently, risks associated with modernization were identified in accordance with ISO 31000. The findings highlight the need for systematic modernization of existing protective structures, clarification of legal regulations, and increased investment, which are key conditions for improving civilian safety.

17 December 2025 in Przegląd Budowlany
Verified
Journal Article
Closed access
Maria TunkiewiczMaria Tunkiewicz
Maria Tunkiewicz
MJMarlena Anna Jurczak
Marlena Anna Jurczak
W artykule poruszono tematykę związaną z projektowaniem, realizacją i eksploatacją budowli ochronnych w Polsce, z uwzględnieniem analizy ryzyka. Przedstawiono aktualny stan prawny oraz luki legislacyjne, wpływające na praktyczne możliwości wdrażania skutecznych rozwiązań ochronnych. Wskazano główne źródła ryzyka z uwzględnieniem wszystkich etapów życia konstrukcji, w tym: niedostosowanie do norm i brak przepisów na etapie projektowania, opóźnienia i przekroczenia kosztów podczas budowy oraz zależność od dostaw zewnętrznych w fazie eksploatacji – szczególnie w skrajnych sytuacjach braku zasobów. W artykule podkreślono konieczność wieloaspektowego podejścia inżynierskiego do całego procesu inwestycyjnego w zakresie infrastruktury ochronnej wraz z właściwą świadomością konsekwencji planowanych i realizowanych działań.

13 December 2024 in Archives of Civil Engineering
Verified
Journal Article
Closed access
PDF file
MJMarlena Anna Jurczak
Marlena Anna Jurczak
JHJolanta Harasymiuk
Jolanta Harasymiuk
Elzbieta SzafrankoElzbieta Szafranko
Elzbieta Szafranko
One of the most important things to do at the stage of preparing an investment process in the construction business is to develop a few possible solutions and then to choose the variant which best fulfils the expectations of various groups of stakeholders. Making a decision about which variant to select depends on how it satisfies a number of criteria, which in turn reflect the requirements set for the planned investment. The process analysing variant solutions employs multi-criteria analysis methods. In order to make analyses and to identify the importance of measurable and non-measurable criteria, surveys and interviews are carried out to acquire the information on the role of the previously defined criteria. Opinions given by experts tend to be divergent due to differences in education, professional background as well as various professional and private experiences. This article reviews data processing methods, and discusses an example of a procedure, which is part of a more extensive analysis of the route of a planned road. The case presented in this paper focuses on the evaluation of five criteria from the category ‘impact on the natural environment’, which are significant in such development projects. The calculations involved in this assessment proved to be time- and labour-consuming, while raising a number of doubts concerning the stage of data aggregation. Hence, the objective of this study has been to develop a method that will enable more efficient data processing while taking into account all assessments.