wei Xiao

Dr. wei Xiao

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 July 2024 in PLOS ONE
Verified
Journal Article
Open access
PDF file
WXwei Xiao
wei Xiao
WTWeiping Tian
Weiping Tian
In this paper, indoor model tests were conducted using image analysis, pore pressure, and displacement measurement methods to investigate the failure evolution process and modes of loess spoil slopes with various components under the influence of rainfall and artificial excavation. The results of the experiments reveal that, under the action of rainfall, there are two types of cracks-to-failure modes for pure loess spoil slopes. One involves the formation of a large gully through the dominant channel, while the other is characterized by step-by-step retreating soil damage between cracks. The failure exhibits three distinct stages, and after failure, the slope angle is relatively large (>45°). The process of rainfall-induced destruction affecting loess spoil containing 25% coarse-grained content similarly unfolds in three stages, ultimately resulting in the formation of a regional landslide. This landslide typically encompasses a broader damage range compared to pure loess spoil, albeit with a shallower depth of damage. After the landslide stops and stabilizes, a tiny slope (45°) is created (<45°). The excavation at the toe of the slope induces loess spoil damage in a progressive multi-stage receding manner. This study provides a reference and basis for disaster prevention and warning of spoiled ground in loess areas.

15 July 2024 in Infrastructures
Verified
Journal Article
Open access
PDF file
YSYi Song
Yi Song
WXwei Xiao
wei Xiao
The high-speed railway project and the ultra-high-voltage transmission project represent two crucial components of China’s “new infrastructure”. As the construction of these two projects progresses rapidly, it is inevitable that instances of intersections will occur. Extreme conditions may cause damage to ultra-high voltage transmission cables. When a high-speed train passes by an ultra-high voltage transmission line, it poses a serious safety hazard. To address this issue, engineering examples were utilized to examine the protection structure scheme, protection distance, protection load, and construction procedures when a high-speed railway intersects a 1000 KV ultra-high voltage transmission line. A shed structure form and construction method for the electric power protection were proposed to ensure the safe operation of the high-speed railway while also achieving the safe and rapid construction of the high-speed railway protection structure in the safety zone of the approaching 1000 kV ultra-high voltage transmission line. The results indicated that the protection of high-speed railway crossings and 1000 kV ultra-high voltage transmission lines primarily focuses on line-break protection. The concrete shed structure with a straight wall and a flat roof was designed to meet the requirements of high-speed railway crossings. The line-break protection method enables the construction of an automatic warning protection corridor and a complete movable trolley quickly and safely within the safety zone near the transmission line. The implementation effect is, therefore, positive. It can be used as a reference point for other projects of a similar nature.

27 September 2024 in Scientific Reports
Verified
Journal Article
Open access
PDF file
WXwei Xiao
wei Xiao
WTWeiping Tian
Weiping Tian
Spoil sites, as loose accumulations, are prone to instability after disturbances and are a serious threat to the safety of downstream communities. This research aims to rapidly and accurately assess the potential hazards of the numerous spoil sides. An integrated approach that combines spatial, aerial, and ground techniques was developed to rapidly identify and interpret the key factors influencing the stability of spoil sites. Subsequently, based on the results of numerical simulation of multiple combinations of unfavorable working conditions by the material point method, a hazard assessment methodology for spoil sites is proposed, which combines the limit equilibrium method with the improved hierarchical analysis. The proposed method is applied and validated on spoil sites along an expressway. The achieved results reveal that remote sensing combined with unmanned aerial vehicle (UAV) verification technology is capable of quickly and accurately identifying the critical elements of spoil sites. The hazard assessment of the spoil site is represented by the hazard coefficient (P), where 0 < P < 1 indicates safety, 1 ≤ P < 5 signifies instability, and P ≥ 5 represents extreme instability. The effectiveness of the proposed assessment approach is then verified through the on-site validation, which provides a vital reference for rapid identification and batch assessment of spoil sites.

8 February 2024 in Research Square
Verified
Preprint
Open access
PDF file
WXwei Xiao
wei Xiao
WTWeiping Tian
Weiping Tian
Spoil sites, as loose accumulations, are prone to instability after disturbances and are a serious threat to the safety of downstream communities. Currently, research on the hazard assessment of regional spoil sites is relatively limited. This study aims to develop an integrated approach that combines spatial, aerial, and ground techniques to rapidly identify and assessment the hazard of spoil sites. Using remote sensing and airborne LiDAR, spoil sites within the region are identified and key factors influencing their stability are appropriately interpreted. Subsequently, based on the numerical simulation results obtained via the material point method, a hazard assessment methodology for spoil sites is proposed, which combines the slope safety factor method with the analytical hierarchy process. The proposed method is applied and validated on a spoil site along an expressway in Guizhou, China. The achieved results reveal that remote sensing combined with unmanned aerial vehicle (UAV) verification technology is capable of quickly and accurately identifying spoil sites and accurately interpreting their critical elements. The hazard assessment of the spoil site is represented by the hazard coefficient (P), where 0 < P < 1 indicates safety, 1 ≤ P < 5 signifies instability, and P ≥ 5 represents extreme instability. The effectiveness of the proposed assessment approach is then verified through the on-site validation, which provides a vital reference for rapid identification and batch assessment of spoil sites.