Jessica Sjah

Jessica Sjah


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
JSJessica Sjah
Jessica Sjah
EEEristra Nungsatria Tresna Ernawan
Eristra Nungsatria Tresna Ernawan
NHNURAZIZ HANDIKA
NURAZIZ HANDIKA
SASotya Astutiningsih
Sotya Astutiningsih
EVEric Vincens
Eric Vincens
The smelting process of Ferronickel in Indonesia produces a significant amount of waste in the form of Ferronickel Slag (FNS), with an annual accumulation of up to 13 million metric tons. Previous studies have shown promising strength results for concrete utilizing FNS as a fine aggregate. This study aims to analyze the mechanical properties of three reinforced concrete (RC) beams measuring 15 cm × 25 cm × 300 cm, each containing FNS as a 50% substitute for fine aggregate. The RC Beams underwent experimental testing using a four-point loading scheme under semi-cyclic loading conditions. Test results show the beams’ capacity had reached up to 8 ton-f and their load–displacement responses show promising results. Digital Image Correlation (DIC) analysis facilitated the observation of surface deformation evolution due to loading, aiding in the identification of concrete crack patterns. Due to semi-cyclic loading, cracks on the beams’ surface were experiencing a crack opening and closing phenomenon, where the propagations of cracks ceased or reclosed throughout the unloading process. Moreover, the opening of residual cracks was also captured by DIC analysis. The experimental finding was validated by finite element analysis. The RC beam numerical model was created using the Timoshenko Multi-fiber element in CAST3M software version 2022. Mazars concrete and elastoplastic steel damage model were used as constitutive laws for numerical modeling. The model’s load–displacement response demonstrated satisfactory agreement compared to the experimental monotonic loading result. However, the model had limitations regarding the simulation of residual displacements of beams due to semi-cyclic loading.

1 October 2026 in Green Technologies and Sustainability
Verified
Journal Article
Open access
JEJanuarti Jaya Ekaputri
Januarti Jaya Ekaputri
ABAdi Drajad Budiman
Adi Drajad Budiman
NPNathaniel Nico Prawira
Nathaniel Nico Prawira
RSRoyce Giovano Sutikno
Royce Giovano Sutikno
FAFadhilah Aditya Ahmad
Fadhilah Aditya Ahmad
AKAndri Kusbiantoro
Andri Kusbiantoro

16 April 2024 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
ALAlfredo
Alfredo
JSJessica Sjah
Jessica Sjah
ARAyomi Dita Rarasati
Ayomi Dita Rarasati
BTBambang Trigunarsyah
Bambang Trigunarsyah
AAAlfredo Alfredo
Alfredo Alfredo
In the rapidly evolving Indonesian construction sector, Building Information Modelling (BIM) is gaining substantial momentum, particularly in Indonesia. BIM integration offers comprehensive advantages across the entire building lifecycle. This research centers on applying BIM integration in a 10-story Tower Laboratory at the Department of Civil Engineering, Universitas Indonesia, characterized by structural irregularities. The integration utilizes Autodesk Revit 2023 for BIM modelling and ETABS V21 for structural analysis, employing response spectrum and linear time history methods to assess variations in structural response. The study reveals that response spectrum earthquake loads result in greater responses along the Y-axis, while linear time history earthquake loads lead to increased responses along the X-axis. Spectrum response earthquake loads necessitate an additional 0.64% (21 m³) in cross-sectional area and 1.35% (7805 kgf) more reinforcement compared to linear time history earthquake loads. Additionally, there is a 1.07% cost disparity, amounting to IDR 173,442,791, due to differing analytical methods. This research underscores the potential of BIM in enhancing the construction process, particularly in addressing structural irregularities. The design outcomes and volume calculations from BIM integration can be effectively utilized for life cycle assessments, making it a crucial tool for environmentally conscious and sustainable building practices.

28 August 2024 in International Journal of Engineering and Technology Innovation
Verified
Journal Article
Open access
PDF file
MTMichael Loreantz Steven Tambunan
Michael Loreantz Steven Tambunan
JSJessica Sjah
Jessica Sjah
ARAyomi Dita Rarasati
Ayomi Dita Rarasati
RSRyan Sulistian
Ryan Sulistian
BTBambang Trigunarsyah
Bambang Trigunarsyah
This research aims to extend prior knowledge of sky bridge isolations in a design case study that complies with building codes, focusing on the design of a multi-tower building linked with a sky bridge and its isolation system. Building Information Modeling (BIM) is used during the design process. Linear time history analysis is performed to capture seismic responses without statistical distortion of response combinations. Link elements are used to simulate the isolations, and the ground motions are excited in bidirectional directions. The experimental results demonstrate that using an isolation system at the sky bridge connection improves torsional behavior, as evidenced by a 12% reduction in torsional mass contribution in the fundamental mode shape of the buildings. Other notable improvements include better lateral force distributions and optimization of reinforcement volume by 36.91% at maximum. Additionally, convenient post-design procedures, such as automated design visualizations and quantity surveys of reinforcements are reported through using BIM.

1 October 2025 in Science and Technology Indonesia
Verified
Journal Article
Open access
PDF file
DSDaral Suraedi
Daral Suraedi
JSJessica Sjah
Jessica Sjah
NHNuraziz Handika
Nuraziz Handika
JOJonbi
Jonbi
AAAhmad Ashari
Ahmad Ashari
The cement industry significantly contributes to CO2 emissions, releasing approximately 1 ton of CO2 for every ton of cement produced, which accounts for up to 40% of total global industrial emissions. This study aims to mitigate these emissions by utilizing Palm Oil Boiler Ash (POBA) as a clinker substitute, creating POBA Cement with substitution levels ranging from 10% to 30%. The POBA was sourced from the Cikasungka Palm Oil Plantation in Bogor, Indonesia and underwent analysis using X Ray Fluorescence (XRF) andScanningElectron Microscopy (SEM) to assess its chemical properties and microstructure. The findings revealed a decrease in compressive strength with increased POBA substitution levels; however, it maintained a pozzolanic effect that supported the crystallization process, albeit with a longer setting time compared to Ordinary Portland Cement (OPC). Notably, the addition of 1% nano-silica was found to enhance compressive strength more effectively than 3%. This research underscores the potential of POBA as an environmentally friendly clinker substitute for sustainable cement production.

16 April 2024 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
GTGiven Tohho
Given Tohho
JSJessica Sjah
Jessica Sjah
ARAyomi Dita Rarasati
Ayomi Dita Rarasati
BTBambang Trigunarsyah
Bambang Trigunarsyah
The increasing use of technology in the construction industry has introduced the concept of Building Information Modeling (BIM), which is widely utilized to streamline construction activities. BIM enables the exchange of data across various disciplines quickly, as well as facilitates analysis, design, and on-site construction processes. The implementation of BIM will be carried out in the analysis and design processes of structures with irregularities to assess the effectiveness and performance of BIM in modeling and analyzing structures. Considering the burgeoning development of the construction industry in Indonesia, there is a necessity for a laboratory hangar dedicated to conducting structural model tests and construction material examinations. The aim of this study is to compare the response and the volume output between the response spectrum and linear time history analysis of an irregular structure. The case study conducted in this research focuses on the 5-stories Laboratory Hangar in Indonesia. The software used in this study includes Autodesk Revit 2023 for BIM modeling and ETABS V21 for structural analysis. Data and model exchange are performed between both software platforms to evaluate the BIM integration between them.