Melusi Wiseman Ndwandwe

Mr. Melusi Wiseman Ndwandwe

Mechanical Engineering, Malawi University of Business and Applied Sciences, Blantyre, Malawi
orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 November 2024 in Frontiers in Built Environment
Verified
Journal Article
Open access
PDF file
MNMelusi Wiseman Ndwandwe
Melusi Wiseman Ndwandwe
WKWitness Kuotcha
Witness Kuotcha
TMTheresa Mkandawire
Theresa Mkandawire
Building information modelling is making waves in the global built environment, improving the architecture engineering and construction industry in many aspects. However, in Malawi, it is neither widely adopted nor well-researched. Therefore, this study aimed to identify and analyse the challenges of BIM implementation in Malawi. A quantitative methodology was used, collecting 189 questionnaires. Descriptive analysis (mean item score), one-sample t-test, and factor analysis were used to analyse the data. The descriptive analysis revealed differences in ranking the 20 BIM challenge factors among various groups, yet no statistically significant variances were found among them; all the challenges were deemed critical. However, the results of the one-sample t-test indicated statistically significant differences in 13 of the 20 challenges, including issues with expertise, experience, integrating multiple software, understanding BIM potential, implementation methods, change adaptation, legislative guidelines, high implementation costs, awareness, integration to traditional techniques, procurement procedures, and strategic vision for implementation. Thus, through factor analysis, the study divided the 20 BIM implementation challenges into three categories: BIM integration, collaborative workflow, and technical adaptability challenges. These findings would increase BIM awareness, best practices and solutions, collaboration and communication, training and education, and industry BIM adoption. The study further contributes to the body of knowledge by providing structured challenges for BIM implementation, filling the knowledge gap about BIM challenges in the Malawian construction industry.

24 July 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MNMelusi Wiseman Ndwandwe
Melusi Wiseman Ndwandwe
WKWitness Kuotcha
Witness Kuotcha
TMTheresa Wongani Wongani Mkandawire
Theresa Wongani Wongani Mkandawire
In developed countries, the government primarily supports the adoption of BIM. However, adoption is typically driven by the preferences of industry professionals among construction organizations in developing countries, who rely on their BIM awareness and competence. Thus, BIM competence and awareness have become an important indicator of organizational BIM readiness. To assess the level of BIM readiness, this study aims to determine the BIM competence and awareness levels among Malawian construction organizations. The study surveyed 189 construction professionals and analyzed the data using descriptive statistics and reliability tests. The findings revealed that there is a moderate level of BIM awareness among the organizations. The organizations have BIM-capable software. However, the professionals within these organizations possess a limited proficiency in BIM technical abilities, particularly in performing BIM-related services and executing BIM-related tasks. Therefore, construction organizations in Malawi should prepare for the widespread adoption of BIM by addressing the insufficient technical skills and limited awareness of BIM among their workforce. Furthermore, the study indicates that engaging in collaborative efforts could serve as a valuable foundation for the adoption of BIM within construction organizations.