Hamdi Bashir

Prof. Hamdi Bashir

orcid

Research Focus & Metrics

Academic Career Length

19Years (2008-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 June 2022 in Production Planning & Control
Verified
Journal Article
Closed access
Udi OjiakoUdi Ojiako
Udi Ojiako
EAEman Jasim Hussain AlRaeesi
Eman Jasim Hussain AlRaeesi
Maxwell ChipuluMaxwell Chipulu
Maxwell Chipulu
AMAlasdair Marshall
Alasdair Marshall
Hamdi BashirHamdi Bashir
Hamdi Bashir
We set out in this study to examine the mechanisms (specific knowledge management practices) required to operationalize service innovation readiness within public sector service delivery. Data is obtained from 150 service delivery managers drawn from public sector service organizations within the emirate of Sharjah. Sampling is undertaking utilizing a 38 factor knowledge management-focussed service innovation readiness questionnaire developed from the literature. Analysis of the data is via variable ranking and multidimensional scaling (MDS). The findings of the study suggest the existence of four knowledge management-based imperatives which are construed as managerial mechanisms for public sector service innovation readiness. These are (i) ‘Knowledge core competence’ (knowledge as a key strategic asset) (ii) ‘Organizational structure’ (internal patterns of organizational communication, authority and relationships) (iii) ‘Responsiveness to change’ (propensity to engage in both purposeful and timely behavioural change in response to modulating stimuli), and (iv) ‘Innovativeness’ (relative earliness in adopting innovation). The findings lead to a service innovation readiness typology which is oriented towards ensuring that public sector entities are able to effectively and efficiently deliver innovative services that meet both operational mandates and national visions of service expectations.

1 September 2020 in Journal of Engineering Design
Verified
Journal Article
Closed access
Hamdi BashirHamdi Bashir
Hamdi Bashir
UOUdechukwu Ojiako
Udechukwu Ojiako
Several studies have proposed methods for modelling and examining the outcomes of engineering change propagation. However, for reasons of practicality, designers need to be supported by simple tools which enable them to model and analyse dependencies among engineering parameters (EPs) in the early design phase. Utilising data gleaned from a prior completed project, this paper proposes a two-stage structural approach to achieve this objective. In the initial stage, interpretive structural modelling (ISM) is utilised to arrange EPs into a simple hierarchical form. In the following stage, cross-impact matrix multiplication (MICMAC) analysis is implemented to classify EPs in terms of their criticality. The results from modelling and analysis show that the proposed approach could be useful to designers opting to use engineering change propagation methods as well as to those who rely only on their experience and knowledge to assess the consequences of changes.

28 June 2023 in Environmental and Sustainability Indicators
Verified
Journal Article
Open access
Hamdi BashirHamdi Bashir
Hamdi Bashir
ZAZehra Canan Araci
Zehra Canan Araci
KOKhaled Obaideen
Khaled Obaideen
IAImad Alsyouf
Imad Alsyouf

20 September 2019 in Engineering Management Journal
Verified
Journal Article
Closed access
Hamdi BashirHamdi Bashir
Hamdi Bashir
UOUdechukwu Ojiako
Udechukwu Ojiako
CMCaroline Mota
Caroline Mota
Factors that cause project delays are directly and indirectly interrelated. Despite this, the majority of prior studies that have been conducted to identify and rank project delay factors have failed to account for interrelationships between factors. Arguably, without taking these interrelationships and their cumulative effect into account, it is unlikely that the challenges associated with project delays will be fully addressed. With this in mind, this article presents an integrated Social Network-Fuzzy Integrated Network-fuzzy Cross-impact matrix multiplication analysis (MICMAC) approach that considers the largely imprecise interrelationships between multiple project delay factors. The effectiveness of the developed approach is shown through an illustrative demonstration that indicates the approach is effective in determining and analyzing the direct and indirect relational structures between the individual project delay factors. The value of the approach lies in its use for developing an effective risk-mitigation plan for minimizing the severity of project delays.

24 September 2020 in Production Planning & Control
Verified
Journal Article
Closed access
Hamdi BashirHamdi Bashir
Hamdi Bashir
Udi OjiakoUdi Ojiako
Udi Ojiako
AMAlasdair Marshall
Alasdair Marshall
Maxwell ChipuluMaxwell Chipulu
Maxwell Chipulu
AYAmer A. Yousif
Amer A. Yousif
Information flow exchange within highly distributed, co-located, self-organising and networked projects is critical for successful planning, and ultimately, for successful infrastructure project delivery. While conventional project scheduling methods are still widely used as project support tools, most lack capacity for harnessing and exploiting both direct and indirect forms of information flow interdependency between activities in these project types. The present study sets out to develop and present a practical method for modelling and analysing information flow interdependencies in infrastructure projects. We propose and apply a five-stage approach, using an integrated form of Network Analysis augmented with fuzzy Cross-impact Matrix Multiplication Analysis. The findings classify project activities based on their dependency levels with other directly and indirectly related project activities. The novel contribution to project management practice is that key information flow interdependencies can thus be identified and then more effectively harnessed due to an enhanced ability to interpret the information with a clearer understanding of originating communication context.

6 August 2024 in Project Leadership and Society
Verified
Journal Article
Open access
Hamdi BashirHamdi Bashir
Hamdi Bashir
RMRana Musa
Rana Musa
HZHassan Ahmed Al Zarooni
Hassan Ahmed Al Zarooni
UOUdechukwu Ojiako
Udechukwu Ojiako
SHSalah Haridy
Salah Haridy
MSMohammad Shamsuzzaman
Mohammad Shamsuzzaman
The significance of recognizing social sustainability practices for the successful management of projects is increasingly acknowledged. However, to what extent these practices are actually implemented within project management has not been sufficiently addressed in the literature. To address this gap, an empirical study was conducted to investigate the usage of social sustainability practices and explore any disparities in their implementation between domestic and international construction firms in the United Arab Emirates. This study employed a mixed-methods approach, combining interviews and a structured questionnaire. Through the interviews, 32 social sustainability practices were identified. Subsequently, a questionnaire was used to collect data from project managers representing 259 firms. The analysis revealed several key findings: 1) social sustainability practices are adopted at varying rates; 2) twelve practices, primarily concerning fundamental human rights and labor ethics, are uniformly employed by both domestic and international firms; and 3) international firms are more likely than their domestic counterparts to regularly implement the other 20 social sustainability practices. These findings develop new knowledge on the implementation of social sustainability practices and advance the understanding of how firm origin influences the adoption of these practices. Additionally, the findings and their implications provide valuable guidance for policymakers and project leaders looking to incorporate social sustainability practices into their operational strategies.