In order to fully achieve energy saving goals, it is necessary to establish a comprehensive evaluation system for carbon reduction in transmission and transformation projects. Subsequently, weights were assigned to these indicators using a combination of the fuzzy analytical hierarchy process (FAHP) and the entropy weight method (EWM) through both subjective and objective methods. Finally, the ultimate weights were obtained by applying the principle of minimum information. During the construction of the evaluation model, the rank–sum ratio (RSR) method was introduced into the Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) for approximating ideal solution ranking. And the Euclidean distance in TOPSIS was replaced with standardized Euclidean distance, effectively avoiding evaluation discrepancies caused by different dimensions. The modified TOPSIS-RSR method was utilized to evaluate and rank power transmission and transformation projects in four regions. By comparing the test values of the two models, the superiority of the enhanced model was confirmed. Furthermore, the GM (1,1) model is used to predict the electricity sales volume of the optimal ranking area. This evaluation model can also be applied to the benefit evaluation of carbon reduction benefits in power transmission and transformation projects in other regions.
Transmission lines serve as pivotal equipment within the power system. Conductors, the primary medium for power transmission and distribution, directly influence the construction cost, operational performance, and long-term benefits of transmission line projects. This study first provides a detailed introduction to the life cycle cost of transmission lines. It utilizes linear regression analysis, the grey model, and the autoregressive integrated moving average model to forecast the electricity sales benefit and quantify the carbon reduction benefits of energy-saving conductors through a methodology. Through the life cycle cost model, we found that operating costs, particularly energy loss costs, dominate the total expenses, accounting for 65% to 66.2%. The JLHA3-425 scheme offers the lowest life cycle cost of 22,891.66 k$. Comparing economic indicators like ENPV, EIRR, and DPP confirmed that the JLHA3-425 medium-strength aluminum alloy stranded wire emerged as the most economically viable option among the evaluated schemes, holding substantial promise for fostering economic and environmental sustainability in electrical power transmission.
To investigate the economic impact of carbon reduction technology on power transmission and transformation projects, carbon reduction technologies adapted to power transmission and transformation projects were investigated, and the evaluation indicator system for cost-benefit in power transmission and transformation projects was established based on AHP (Analytic Hierarchy Process) and EWM (Entropy Weight Method). Taking 110 kV and 220 kV transmission and transformation projects in a province located in northwest China as an example, a sensitivity analysis was carried out for the weight of each carbon reduction technology. Additionally, based on the evaluation indicator system, eight alternative carbon reduction schemes were proposed, and the net present value and scheme scores were analyzed with TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution). The results showed that in the criterion layer of the 110 kV case, the highest proportion of weight is “high-efficiency transformer”, accounting for 34.12%, and in the indicator layer, the highest proportion of weight is “ parasitic losses”, accounting for 12.35%. After conducting error analysis on the 110 kV and 220 kV cases, it was found that the errors were within an acceptable range both in the criterion layer and index layer. Moreover, it is expected to achieve greater economic benefits through lower costs according to Scheme VI, and due to the limitations of carbon reduction technologies and the lack of a relevant policy system, it is difficult to achieve the goal of covering costs with benefits for the eight schemes studied.
1 October 2019 in IOP Conference Series: Earth and Environmental Science
Power supply and power grid are both independent and closely related, and they are two parts of the power supply community. Power supply and power grid have their own characteristics and laws, and their interactions are different in different stages of development of power industry. Under the market environment of the new power system reform, some new changes have taken place in the relationship between the two. Firstly, this paper analyses the changes of the related factors of power construction after the reform of power system, and then constructs the coordination evaluation system of Yunnan power transmission network and power construction from the aspects of power development mode, energy policy and new energy access. Finally, taking Yunnan Province as an example, it evaluates the coordination of power transmission network and power construction in 2017, which proves the feasibility and science of the evaluation system.