Rachel Holley

Dr. Rachel Holley


Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 March 2014 in Landslides
Verified
Journal Article
Closed access
PDF file
MKMarko Komac
Marko Komac
RHRachel Holley
Rachel Holley
PMPooja Mahapatra
Pooja Mahapatra
HMHans van der Marel
Hans van der Marel
MBMiloš Bavec
Miloš Bavec

6 March 2020 in Remote Sensing
Verified
Journal Article
Open access
PDF file
JSJennifer Scoular
Jennifer Scoular
RGRichard Ghail
Richard Ghail
Philippa J. MasonPhilippa J. Mason
Philippa J. Mason
JLJames Anthony Lawrence
James Anthony Lawrence
MBMatthew Bellhouse
Matthew Bellhouse
TMTom Morgan
Tom Morgan
The Lee Tunnel was constructed as the first part of the Thames Tideway Improvement scheme, between 2010 and 2016. With tunnelling for the East section of the main Thames Tideway Tunnel, which joins the Lee Tunnel at Abbey Mills Pumping Station, beginning in early 2020, this paper investigates patterns of deformation in East London during construction of the Lee Tunnel. An unexpected geological feature, later identified as a drift filled hollow, was discovered during tunnelling. This study demonstrates that had eight years of ERS Persistent Scatterer Interferometry (PSI) data been analysed prior to tunnelling, the unusual pattern of displacement may have been recognised and further targeted borehole investigations taken place before the launch of the tunnel boring machine. Results also show how areas of different land use, including cemeteries and historic landfill, exhibit differences in settlement behaviour, compared with surrounding terraced housing. This research highlights the challenges in interpreting PSI results in an urban area with ongoing construction and the value of a long archive of data, which now spans almost three decades in London, that can be used to establish a baseline prior to construction.