This paper presents an analysis of the influence of burden deviation from the designed one on the intensity of blasting vibrations through the use of laboratory and field examinations. By definition, the burden represents the shortest distance from the axis of an explosive column charge to the free surface. It should be measured along the entire hole length, although, in practice, it is often measured only on the bench surface as the shortest distance from the axis of the explosive column charge to the crest. The real surface of the bench slope (free face) can be very irregular and should be considered during every blast. The deviation of burden in the blast pattern represents a serious problem in the field during blasting operation. Burden deviation from the designed one can be greater or lesser, affecting the results of blasting through poor fragmentation and sometimes causes unwanted effects like increased blasting vibrations or fly rock. The influence of burden deviation on the intensity of blasting vibrations was tested on a laboratory model, where 8 mm diameter holes were drilled into blocks with certain dimensions. The small explosive charges placed in blastholes were initiated. The design burden was set at 30 mm, as the distance from blastholes to the free face of the blocks. Any deviation in distance greater than the designed burden was taken as a parameter for comparison. During each initiation, vibrations were measured using a seismic instrument at a distance of 150 mm from the borehole. At the same time, the free face in the front of the blastholes was photographed to create a detailed 3D model of the blasted surface of the blocks for each blasting. Each measurement is presented on a diagram and classified depending on the values of the burden in the cases where the value of the burden is equal to the designed one, as well as any deviation that is smaller or larger than 30 mm. A total of 55 tests were carried out. The results were analyzed, and the model of dependence of each burden deviation from the designed one on the intensity of blasting vibrations was established under laboratory conditions. To verify the model, the same experiments were also applied in the field. The basic parameter of the model, the coefficient K, which represents the ratio of peak particle velocity and the surfaces of the blasted material from laboratory and field testing, indicates that there is a connection between these values. The deviation of the coefficient K, obtained from laboratory and field measurements, was 5.5%.
The increased volume of construction works, which includes the construction of new residential and business buildings, hotels, garages, shopping centers, and similar, is increasingly common in urban areas. Such works are increasingly coming into contact with different types of problems during construction, as one of these problems we single out the appearance of solid rock mass during excavation at the construction sites of future buildings foreseen in the construction project. During the construction of facilities or part of the building, which includes the underground premises of a building, it is necessary to excavate the material on site, however, due to its physical and mechanical characteristics, it is not always possible to excavate this material with conventional machinery. The composition of the material that is removed is sometimes in the form of solid rock, and thus its excavation is more complicated, so other methods must be used: controlled blasting, application of expansive mortars, etc. This paper presents some of the possibilities of removing solid rock material for the purpose of smooth construction of buildings.
The development of modern technologies has enabled the application of specialized softwares in the field of mining through various segments and processes, including in works related to drilling and blasting. The application of specialized software for drilling and blasting with the use of modern technologies such as photogrammetry enabled more accurate data from the field for later processing. By processing data and creating a 3D model of the terrain for drilling and blasting works, it can obtain precise data, which serve us for the optimization of drilling and blasting parameters, as well as their analysis. The application of this type of specialized software, in this case, the O-Pitblast software, provides an overview of all parameters, as well as possible corrections and different scenarios regarding the results of the blasting itself. Optimization and analysis through this software can improve the results of blasting in terms of fragmented material size, and reduce the unwanted effects of blasting, such as the flyrock or blast vibration. The software has different types of tools that allow a detailed review and insight into the entire process from the beginning of planning drilling and blasting works to the very end and also printing of reports after the work is done.
Design and optimizing the drilling and blasting parameters, should fill the requirements for the capacity, fragmentation size, and technical characteristics of loading and transport equipment, and enable a safe work at the open pit. Besides mentioned, it also achieves the minimal impact on the environment of the open pit and decreases the negative effects on the environment, especially in the blast vibration and flyrock. To obtain the best possible blasting effects and consider all the factors, a specialized software is used to optimize the drilling and blasting parameters. Currently, the few software is intended for optimizing the drilling and blasting works. This paper presents calculation in the OPitblast software, where the estimation of drilling and blasting parameters was performed. As the software has different possibilities for interpretation the results, the prediction of the fragment size distribution of the blasted material, based on the analysis of designed parameters at the open pit copper mine, is presented. The software provides the optimization of drilling and blasting parameters with a very simple change of the set parameters, regarding those, related to the rock mass properties, the characteristics of explosives during blasting, initiation system, delay time to output values such as the size of the blasted material, determination the safety zone of flyrock or negative blast vibration effects.
Small-diameter drilling is used in many civil and mining engineering applications. In the past, it was mainly performed with hand-held hammer drills. However, the need for safer and more efficient work has led to the development of small self-propelled drilling machines that require fewer workers to achieve the same output while providing significantly safer working conditions. Small-diameter boreholes are used in specialized blasting methods (e.g., blasting in urban areas, secondary Boulder blasting), during the extraction of decorative stone blocks, for installing anchors in slope stabilization, in underground mining, in the application of expansive mortar for the disintegration of solid masses (stone, concrete), for creating protective screens, tunneling, and more. Several manufacturers produce small self-propelled drill rigs, all equipped with remote controls. This eliminates the need for the operator to stand in potentially hazardous positions, as is required when using hand-held hammer drills. This paper presents the capabilities and application methods of these drill machines under various working conditions.