Booming population and tourism have increased congestion, collisions, climate-harming emissions, and transport inequities in The Okanagan Valley, Canada. Surveys suggest that over 30% of residents would shift from cars back to public transit and intercity tram–trains if regional service and connections were improved. Intercity streetcars (aka light-rail tram–trains) have not run in Canada since their replacement in the 1950′s by the national highway system. UBC researchers analyzed a tram–train service fashioned after the current Karlsruhe model but powered by zero-emission hydrogen fuel cell/battery hybrid rail power (hydrail) technology, along a 342 km route between Osoyoos, B.C. at the US Border and Kamloops, B.C., the Canadian VIA rail hub. Hydrail trains have operated successfully since 2018 in Germany and were demonstrated in Quebec, Canada in 2023. However, hydrail combined with tram–train technology has never been tried in Canada. Single-train simulations (STSs) confirmed its technical feasibility, showing a roughly 8 h roundtrip travel time, at an average train velocity of 86 km/h. Each hydrail tram–train consumed 2400 kWh of energy, translating to 144 kg of hydrogen fuel per roundtrip. In total, five tons of H2/day would be consumed over 16 h daily by the 16-tram–train-vehicle fleet. The results provide valuable insights into technical aspects and energy requirements, serving as a foundation for future studies and decision-making processes in developing zero-emission passenger tram–train services not just for Okanagan Valley communities but all of Canada and NA.
Population and tourism growth has increased congestion, collisions, climate harming emissions, and transport inequities in the Okanagan Valley, British Columbia (B.C.), Canada. Surveys indicate a willingness among residents to switch from cars to public transit featuring better service levels and connections. We conducted an analysis on the economic feasibility of an Okanagan Valley Electric Regional Passenger Rail (OVER PR) powered by zero-emission (ZE) Fuel Cell/Battery Hybrid Rail (Hydrail) technology along a 342-km route between Osoyoos, B.C., at the US Border and Kamloops, B.C., the Canadian VIA rail hub. Hydrail passenger light-rail has operated successfully since 2018 in Germany and was demonstrated in Quebec, Canada, in 2023. Technical analyses have confirmed the feasibility in B.C. on steep Highway (Hwy) 97 grades and mountainous weather, with mode shift forecasts in the range of 30%. OVER PR economic analyses were also favorable, with net present value (NPV) = CAD 40 billion (CDN, base year 2023), benefit–cost ratio (BCR) = 9:1, and Return on Investments (IRR) = 33% over 30 years. Subject to additional stakeholder consultations and final design reviews, these results were tested against risks using Monte Carlo Simulation (MCS) and Reference-Class Forecasting (RCF), including worst-case risks such as 70% cost over-runs. OVER PR promises an economic transition to clean energy, sustainable transportation, and more livable communities, benefiting all Valley communities through greater transportation equity.
26 August 2021 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Switcher locomotives operate in railway yards where they shunt railcars and assemble trains. Shunting railcars requires frequent aggressive acceleration and deceleration events in order for the locomotive to push or pull railcars onto specific tracks. As a result, switcher locomotives rarely sustain tractive power for any significant period of time. Given that all switchers in North America rely on diesel-electric propulsion; the result is rapid and frequent transitions in engine power leading to a very low engine efficiency and high levels of emissions. Any attempt to quantify or remedy these issues will face a lack of a representative profile or test cycle. A locomotive duty cycle is a breakdown of time spent at each power level of the locomotive’s engine. A major drawback of current duty cycles is that they only account for steady power. Such cycles are not representative of real switcher locomotive operation. This paper presents a real-world transient duty cycle for switcher locomotives that accounts for the rapid power transitions and is argued to be more statistically representative of actual operations. The methodology adopted relies on real-time data collection, microtrip based trip segmentation, and a finite mixture model-based clustering algorithm. Measurements were collected on a EMD 16-645 GP9 locomotive. The duty cycle developed herein is representative of switching operations in Southern Railway of British Columbia’s New Westminster Yard as an example of the methodology which can be repeated in other cases as well.