Data-based equipment fault detection and diagnosis is an important research area in the smart factory era, which began with the Fourth Industrial Revolution. Steel manufacturing is a typical processing industry, and efficient equipment operation can improve product quality and cost. Steel production systems require precise control of the equipment, which is a complex process. A gearbox transmits power between shafts and is an essential piece of mechanical equipment. A gearbox malfunction can cause serious problems not only in production, quality, and delivery but in safety. Many researchers are developing methods for monitoring gearbox condition and for diagnosing failures in order to resolve problems. In most data-driven methods, the analysis data set is derived from a distribution of identical data with failure mode labels. Industrial sites, however, often collect data without information on the failure type or failure status due to varying operating conditions and periodic repair. Therefore, the data sets not only include frequent false alarms, but they cannot explain the causes of the alarms. In this paper, a framework called the Reduced Lagrange Method (R-LM) periodically assigns pseudolabels to vibration signals collected without labels and creates an input data set. In order to monitor the status of equipment and to diagnose failures, the input data set is fed into a supervised learning classifier. To verify the proposed method, we build a test rig using motors and gearboxes that are used on production sites in order to artificially simulate defects in the gears and to operate them to collect vibration data. Data features are extracted from the frequency domain and time domain, and pseudolabeling is applied. There were fewer false alarms when applying R-LM, and it was possible to explain which features were responsible for equipment status changes, which improved field applicability. It was possible to detect changes in equipment conditions before a catastrophic failure, thus providing meaningful alarm and warning information, as well as further promising research topics.
5 June 2017 in International Journal of Quality & Reliability Management
Purpose: The purpose of this paper is to develop a preventive maintenance policy with continuous monitoring for a circular consecutive-k-out-of-n: F systems. A preventive maintenance policy is developed based on the system critical condition which is related to the number of working components in the minimal cut sets of the system. If there is at least one minimal cut set which consists of only one working component, the system is maintained preventively (PM) after a certain time interval and the failed components are replaced with the new ones to prevent the system failures. If the system fails prior to the preventive maintenance, the system is correctively maintained (CM) immediately by replacing the failed components. Design/methodology/approach: The mathematical function of the expected cost rate for the proposed maintenance policy is derived. The costs of PM, CM, and replacement per component are considered. The optimal maintenance parameter, which is the PM interval, is obtained by enumeration, and the numerical studies are shown with various system and cost parameters. The performance of the proposed policy is evaluated by comparing its expected cost rate to those of the no-PM and age-PM policies. The percentage of cost increase from the no-PM and age-PM policies to the proposed PM policy is calculated and this value can represents how important the continuous monitoring in this policy. Findings: The proposed policy outperforms other policies. When the cost of CM is high and the cost of PM is low, the proposed PM policy is more suitable. Research limitations/implications: The system consists of identical components and the component failure times follow an exponential distribution. Continuous monitoring is considered, which means that the component states can be known at any time. Three cost parameters, cost of PM, CM, and replacement per component, are considered. Originality/value: This paper shows a maintenance problem for circular consecutive-k-out-of-n: F systems. Many studies on this system type focused on the reliability estimation or system design problem. Previous study with this policy (Endharta and Yun, 2015) has been developed for linear systems, although the study used a simulation approach to estimate the expected cost rate. Also, Endharta et al. (2016) considered a similar method for the different types of system, which is linear consecutive-k-out-of-n: F system.