In engineering projects, project duration and a cost increase occur in every phase and will propagate their impacts downstream. Associated with the compensation of project duration, the duration and cost impacts are transferred among phases. In this paper, after illustrating the transmission of project duration and cost impacts, we will use the risk transmission theory and GERT (Graphic Evaluation and Review Technique) network technique to build a transmission model. We have designed equivalent parameters of project duration and cost impacts in the GERT model for serial, parallel, and hybrid structures. The algorithm of the GERT network for project cost and duration transmission is analyzed. The effectiveness of this model and algorithm is proved by numerical examples. This paper provides a new analytical method for cost and duration control of engineering projects.
In order to further improve the accuracy of flood routing, this article uses the Variable Exponential Nonlinear Muskingum Model (VEP-NMM), combined with the Artificial Rabbit Optimization (ARO) algorithm for parameter calibration, to construct the ARO-VEP-NMM flood routing model. Taking Wilson’s (1974) flood as an example, the model calculation results were compared and analyzed with the Muskingum model constructed with seven optimization algorithms. At the same time, six measured floods in the Zishui Basin were selected for model applicability testing. The results show that the ARO algorithm exhibits stronger robustness and search ability compared with other optimization algorithms and can better solve the parameter optimization problem of the Muskingum model. The use of the ARO-VEP-NMM model for flood routing accurately reflects the movement patterns of floods. The Nash coefficient of the Wilson section reached 0.9983, and the average Nash coefficient during the flood validation period in the Zishui Basin was 0.9, further verifying the adaptability and feasibility of the ARO-VEP-NMM model in flood routing. The research results can provide certain references and a theoretical basis for improving the accuracy of flood forecasting.
Inter-basin water transfer projects (IBWTPs) play a crucial role in addressing the uneven spatial and temporal distribution of water resources and ensuring water security in the receiving areas. However, these projects are subject to various risk factors during their operation. While risk management is critical, current research in this field lacks a systematic and dynamic approach. A three-dimensional measurement model for probability, loss, and risk value, based on Dempster–Shafer (DS) evidence theory, Bayesian networks, and the equivalence method, was established in this study and, in consideration of the engineering characteristics of the IBWTP, a dynamic transmission evolution model for risk is constructed. The applicability and effectiveness of the model are demonstrated through a case study of the Central Line Project of South-to-North Water Diversion (CLPSNWD). The results indicate that the system risk of the CLPSNWD is in an unstable state, with the key influencing factors being channel engineering risk, flood disaster risk, pipeline engineering risk, and water transfer (discharge) cross-structure risk. The research findings offer a novel approach to the quantitative analysis and evolution of risk and contribute to the further development of engineering risk management theory.
To enhance the safety risk management and control capabilities for TBM (Tunnel Boring Machine) construction in hydraulic tunnels, this study conducts a correlation analysis and dynamic evolution study of safety risks. Data were collected through multiple channels, including a literature review, on-site records, and expert interviews. Grounded theory was employed for three-level coding to initially identify risk factors, and gray relational analysis was used for indicator optimization, ultimately establishing a safety risk system comprising 5 categories and 21 indicators. A multi-level hierarchical structure of risk correlation was established using fuzzy DEMATEL and ISM, which was then mapped into a Bayesian network (BN). The degree of correlation was quantified based on probabilistic information, leading to the construction of a risk correlation analysis model based on fuzzy DEMATEL–ISM–BN. Furthermore, considering the risk correlations, a safety risk evolution model for TBM construction in hydraulic tunnels was developed based on system dynamics. The validity of the model was verified using the AY project as a case study. The results indicate that the safety risk correlation structure for TBM construction in hydraulic tunnels consists of 7 levels, with the closest correlation found between “inadequate management systems” and “failure to implement safety training and technical disclosure”. As the number of interacting risk factors increases, the trend of risk level evolution also rises, with the interrelations within the management subsystem being the key targets for prevention and control. The most sensitive factors within each subsystem were further identified as adverse geological conditions, improper construction parameter settings, inappropriate equipment selection and configuration, weak safety awareness, and inadequate management systems. The control measures proposed based on these findings can provide a basis for project risk prevention and control. The main limitations of this study are that some probability parameters rely on expert experience, which could be optimized in the future by incorporating more actual monitoring data. Additionally, the applicability of the established model under extreme geological conditions requires further verification.
Inter-basin water transfer projects (IBWTPs) play a pivotal role in alleviating the spatiotemporal imbalances of water resources. However, their operation is exposed to multiple, highly interdependent safety risks that can significantly undermine system stability and water supply reliability. Existing studies predominantly focus on isolated risk factors or rely heavily on subjective data, which limits their ability to capture the complex interrelationships among risks and reveal their underlying propagation mechanisms. To address these limitations, this study proposes a novel risk correlation analysis framework that integrates Interpretive Structural Modeling (ISM) with copula functions. ISM is first employed as a preprocessing tool to structure expert knowledge and develop an initial risk correlation framework. It is then used to hierarchically organize the complex interrelationships among risks. Subsequently, copula functions are utilized to model nonlinear dependencies and tail behaviors among risk variables. This enables a quantitative assessment of correlation strengths and facilitates the construction of a risk topological network. An empirical case study is conducted based on the Middle Route of the South-to-North Water Diversion Project. The results reveal 13 significant correlations among six second-level risk categories. Natural risks (e.g., floods and geological hazards) are identified as the primary driving factors. They exhibit a strong positive correlation (0.6155) with engineering risks and serve as the most critical nodes for proactive risk prevention and control. Engineering risks function as central intermediary hubs in the risk transmission process, whereas water quality and economic risks are characterized as terminal endpoints. Furthermore, three principal risk propagation pathways are identified: (1) natural risks → engineering risks → economic risks; (2) natural risks → operational scheduling risks → social risks; and (3) engineering risks → water quality risks → economic risks. The resulting risk topological network demonstrates significant small-world properties, indicating highly efficient risk transmission within the system. Ultimately, this study provides a robust quantitative approach for analyzing risk interactions in complex engineering systems and enriches the theoretical framework of engineering risk management. It also identifies critical nodes and key transmission pathways for risk prevention and control in IBWTPs, thereby offering significant practical implications for operational safety.
The composition elements of the earthwork allocation system (excavation project, filling project, transfer yard, waste disposal yard, and material yard) and the relationship between material flow were analyzed. Based on the construction of calculation models for soil and water conservation fees, landscape restoration fees, and road transportation intensity, a joint optimization model was constructed with the objectives of minimizing the total allocation cost and minimizing the peak transportation intensity of the road. By dynamically adjusting the volatility, setting penalty factors, and vectorizing NumPy arrays, the ant colony algorithm is improved and the optimization model is solved. Case analysis shows that considering the intensity of road transportation, the peak transportation intensity significantly decreases, and the proportion of directly filled earthwork increases to over 88% without exceeding the capacity of the intermediate transfer site. The total cost only increases by 0.91%, and the allocation plan is more in line with actual construction needs.