24 August 2016 in IEEE Transactions on Smart Grid
In this paper the diakoptics-based branch-tearing method for solving large electric networks, known as the Multi-Area Thévenin Equivalents (MATE), is combined with the alternating method for parallelizing the transient stability simulations of bulk power systems. In the proposed framework, equations associated with dynamic and static devices and passive network are distributed among computing processes. The paper discusses an implementation of the parallel transient stability simulator along with results for two power systems with about 4,000 and 15,000 buses, both based on the Brazilian Interconnected Power System. Performance metrics for assessing the effectiveness of the proposed methodology are also presented and discussed. In order to validate the implementation, the results are also compared with those from an industrial-grade transient stability program, ANATEM developed by CEPEL.
22 July 2022 in IEEE Transactions on Power Systems
Optimal resource allocation is critical when maximizing the resilience of the electrical power distribution network against natural disasters. This paper presents a two-step optimization strategy that integrates a pre-disaster preparedness plan and a post- disaster resource re-allocation procedure to optimize the resilience of the power distribution network against hurricanes. Emergency resources are operationally interdependent, and it is these interdependencies that determine how the resources should be distributed to the critical loads in the network. This work uses the concept of the Human Readable Table (HRT) to relate the interdependencies among these resources. The resource allocation optimization is then formulated into a Mixed- Integer Nonlinear Programming (MINP) problem. The proposed method is tested on the IEEE 70-node system. The results show that this two-step procedure decreases the probability of failure for the critical nodes during the pre-hurricane stage and increases the system's ability to recover during the post-hurricane stage.
5 April 2017 in IEEE Transactions on Power Delivery
This paper reviews the classical multiconductor transmission line (MTL) equations and proposes additional constraints on these equations. A fundamental physical constraint is that the voltage and current waves must be collocated and travel together with the same propagation function. Based on this condition, the Revised Multiconductor Transmission Line (RMTL) equations are proposed. As opposed to the classical MTL equations that require complex frequency-dependent transformation matrices for their diagonalization, the RMTL equations can be diagonalized very accurately using a single real constant transformation matrix. A new Frequency-Dependent Line Model (FDLM) is proposed based on the RMTL equations. FDLM is compared with the two most accepted frequency-dependent line models in the Electromagnetic Transients Program (EMTP): The JMARTI model (fdLine) that uses a constant transformation matrix as an approximation, and the phase-coordinates Universal Line Model (ULM) that fits the frequency dependence of the transformation matrices. These time-domain models are compared with a reference frequency-domain solution for a double-circuit vertical line.
6 October 2017 in IEEE Transactions on Sustainable Energy
This paper proposes a methodology for optimal planning of distributed storage systems (DSS) in smart grids with high penetration of renewable sources. The DSS can provide distribution systems with various benefits, including arbitrage gain, reduction in the system losses, system resilience enhancement, reduction in nondispatchable energy curtailment, and peak load shaving. In particular, by alleviating the peak load, the system upgrade time can be deferred to future years, resulting in noticeable financial gains for the system operator. In this paper, the problem of DSS planning for optimizing the discounted economic gain of the system operator is formulated and solved as a mixed-integer convex program. Various economic gains are taken into account and the stochasticity of the loads and renewable generations is accounted for by evaluating the total expected gain. Numerical results for DSS planning on a 69-node, 11-kV smart grid and using real data of smart meters and renewable energy sources are presented and discussed.
7 May 2018 in IEEE Transactions on Power Delivery
On transmission lines where switching surges are not mitigated with closing resistors and/or surge arresters, high-speed reclosing on a line with trapped charge will produce high overvoltages that have been measured above 3 pu. Careful simulations of these switching events using available Electromagnetic Transient programs consistently produce significantly higher voltages than the measurements. This indicates a phenomenon present on the line that acts to reduce the switching surge magnitudes but not typically modeled. This paper aims to identify the required simulation practices in reproducing the field measured overvoltages in EMT simulations and investigates the sensitivity of results to modeling approaches and electrical parameters. Field measurements from a switching surge test of a 230 kV line without surge mitigation have been used for model comparisons. Variations in frequency-dependent line modeling, ground resistivity, skin effect, shunt conductance, parallel lines and source-side detail have been tested in an unsuccessful attempt to decrease the difference between the field measurements and the higher simulation overvoltages. It is demonstrated that even though the pattern of the transient voltage waveforms can be reproduced very well using frequency-dependent line models, the magnitude of the maximum overvoltage is significantly overestimated unless the effect of corona is considered. Two types
10 June 2021 in IEEE Transactions on Power Systems
In the highly interdependent environment of a large city, failures in the Electrical Distribution System (EDS) can cause direct or indirect consequences to other critical infrastructures and the well-being of the citizens. To increase the resilience of the supply of electricity to the city, this work combines the pre-training of an AI agent and very fast calculation of the optimum recovery path after the number and location of the electrical faults are known. In the introduced Soft-Hard Optimal Convergence (SHOC) method, machine learning techniques are used to train an AI agent with thousands of off-line scenarios for optimum system restoration. In real-time, after the actual fault information is known, the agent will provide a subset of solutions (soft solution) to be considered for hard optimization algorithms. The Infrastructure Interdependencies Simulator (i2SIM) is used to assist the prioritization of the sequence of fault recovery and topological reconfiguration to minimize the black-out time of the most critical loads. A 70-node distribution system case is used to demonstrate the proposed methodology, with solution times in the order of seconds to find the optimum repair sequence and switches topological reconfiguration to optimize the city's resilience index.