Optimal utilization of available water resources has become more urgent due to the rapid growth of the economy and population. The joint operation of the Three Gorges cascade and Qingjiang cascade reservoirs in China was studied in this paper. Choosing maximization of hydropower generation and hydropower revenue as objective functions respectively, optimal models were established for individual and joint operation of the cascade reservoirs. The models were solved by the progressive optimality algorithm. The storage and electric compensation benefits among cascade reservoirs were analyzed. The daily inflow data of consecutive hydrological years of 1982–1987 were selected for a case study. Compared with the design operation rule, the joint operation of the multi-reservoir system can generate 5.992 billion kWh of extra power or an increase of 5.70% by the objective function of maximum hydropower generation. Through reservoir storage compensation, the spilled water of the Three Gorges and Qingjiang cascade reservoirs was decreased by 78.741 and 5.384 billion m3, respectively.
Recent evidence of the impact of watershed underlying conditions on hydrological processes have made the assumption of stationarity widely questioned. In this study, the temporal variations of frequency distributions of the annual maximum flood were investigated by continuous hydrological simulation considering nonstationarity for Weihe River Basin (WRB) in northwestern China. To this end, two nonstationary versions of the GR4J model were introduced, where the production storage capacity parameter was regarded as a function of time and watershed conditions (e.g., reservoir storage and soil-water conservation land area), respectively. Then the models were used to generate long-term runoff series to derive flood frequency distributions, with synthetic rainfall series generated by a stochastic rainfall model as input. The results show a better performance of the nonstationary GR4J model in runoff simulation than the stationary version, especially for the annual maximum flow series, with the corresponding NSE metric increasing from 0.721 to 0.808. The application of the nonstationary flood frequency analysis indicates the presence of significant nonstationarity in the flood quantiles and magnitudes, where the flood quantiles for an annual exceedance probability of 0.01 range from 4187 m3/s to 8335 m3/s for the past decades. This study can serve as a reference for flood risk management in WRB and possibly for other basins undergoing drastic changes caused by intense human activities.