In this paper, an overview of the history of education in railway and metro engineering in Brazil is presented, including its beginnings, its apogee, its near extinction, and its return at the beginning of the 21st century. The trajectory of the Brazilian professional education began with the implementation of small railway workshops located along the railway which were outside of the regular education system. At the end of the 20th century, the economic crisis, privatization, and drastic reduction of investment led to the scrapping and almost eradicating of the Brazilian rail network, followed by the death of railway education in Brazil. In recent years, the railway industry was stimulated, giving way to large investments, impacting and creating new opportunities for development in Brazil. This was one of the fundamental aspects for the development of new professional higher education programs in the railway and metro sector in Brazil. The first project to be implemented in Brazil was the course on railway and metro engineering of the Federal University of Santa Catarina. This course aims to provide structured training in four main areas: vehicle design, operation, maintenance, and train and metro management.
A gestão de riscos tem se destacado nas organizações, e se tornado essencial para o apoio a tomada de decisões que impactam positiva ou negativamente a administração pública do Governo Brasileiro. Porém, existem diversos desafios que precisam ser tratados para uma gestão de riscos eficiente. Dentro deste contexto, o objetivo da presente pesquisa consiste em verificar se existe lacuna entre o conhecimento teórico e a prática de gestão de riscos, e verificar se fatores como escopo, custo, prazo e qualidade interferem no sucesso dos projetos de Tecnologia da Informação. A pesquisa utilizou como técnica para coleta de dados um questionário aplicado em 221 profissionais da área de Tecnologia da Informação. Os resultados mostraram, por meio de análises estatísticas, que existe uma discrepância da teoria e o uso prático da gestão de riscos de projeto de Tecnologia da Informação. Além disso, verificou-se que há impacto significativo e positivo dos fatores de gerenciamento de projetos no sucesso dos projetos. O que possibilita que o presente trabalho sirva de base para novos estudos em outros setores e áreas de conhecimento de gestão de riscos de projetos de Tecnologia da Informação.
Paper aims This paper presents a novel computational tool for managing risks related to human fatigue, applied at the First Integrated Center for Air Defense and Air Traffic Control (CINDACTA I). Distinct from existing systems, the proposed tool integrates a data‐oriented approach with a rigorous implementation of the Fatigue Risk Management System (FRMS) methodology, explicitly addressing the transition from acute to chronic fatigue. Originality The Fatigue Risk Management System (FRMS) tool was developed using an innovative approach that differentiates it from previous solutions. In contrast to validated international tools, our system emphasizes real-time data monitoring and adaptive risk mitigation strategies based on operational and scientific evidence (Gander et al., 2017; Maslach & Jackson, 1981). Research method we carried out exploratory, descriptive, and applied research with a qualitative approach. Main findings (i) The tool comprehensively covers all essential stages of the fatigue risk management process for Air Traffic Controllers (ATCOs); (ii) It provides actionable guidelines for reducing fatigue risks among ATCOs through an easily replicable computational prototype. Implications for theory and practice The tool contributes both to the theoretical understanding of human fatigue progression and to practical improvements in operational safety by prioritizing human resource management.
The growing integration between cloud-based CRM platforms and AI-driven analytics services expands both operational benefits and the organizational attack surface, yet most published threat-modeling studies still validate STRIDE and LINDDUN in isolation, on synthetic or single-domain systems, without tracing findings through to standardized controls. This paper closes that gap by proposing an end-to-end, empirically validated methodological chain that combines Data Flow Diagrams, dual STRIDE/LINDDUN classification, OWASP Top 10:2025 prioritization, expert-panel refinement, and NIST SP 800-53 Rev. 5 control mapping, applied to a real production architecture in a large regulated organization integrating cloud CRM with AI analytics. Unlike prior work that applies a single framework or a generic reference architecture, this case study preserves full traceability from 28 mapped data flows to specific control codes, validated against nine security experts using a Delphi-inspired panel. The results reveal that threats concentrate disproportionately in federated authentication token channels and metadata catalogs, components that individually appear low-risk but structurally connect the ecosystem's highest-impact OWASP categories. This concentration pattern, not previously reported for CRM-AI integration architectures, indicates that authentication chains function as systemic single points of failure even when individual controls appear adequate. We argue this traceable, standards-aligned chain offers a replicable template for governance teams needing to justify control investments in similarly coupled cloud ecosystems, particularly under LGPD/GDPR compliance pressure.
28 November 2007 in SAE International Journal of Advances and Current Practices in Mobility
The attributes of the project team play a fundamental role in the product development process (PDP), since they, have a significant influence on the conducting of activities, making of decisions and liaison with customers. The importance of the project team is also recognized in the management of the potential risks that can appear during the PDP, because risk management (RM) depends strongly on the company culture and the commitment of the project team involved. However, in general, the culture of a company is not pro-active in the sense of anticipating potential problems that may appear and generally the project team resists analyzing these potential problems for fear of exposing and consequently committing themselves. In this regard, this paper presents a brief introduction on product development and its importance and management. Subjects related to risk management, the product design process and the project team are then discussed. Following this, attributes that influence the acting of the project team in relation to RM, which are considered essential for the successful introduction of the RM processes, are defined. And finally, an analysis of risk management is presented based on the profile of the project team.
This study aims to analyze the perceived value of services provided by the Brazilian Company of Research and Industrial Innovation (EMBRAPII) to its contracting ministries and institutional partners. It utilizes the theory of value perception analysis and Constructivist Multi-criteria Decision Analysis to identify critical elements for evaluating EMBRAPII’s contracting organizations. Brainstorming sessions with experts led to the identification of five criteria and 14 sub-criteria. These criteria include a relationship with EMBRAPII, a signed agreement, EMBRAPII’s reputation, technical capacity, and the ability to adapt to changes. Data were entered into the second version of the MyMCDA-C software for value perception analysis. The findings showed a positive perceived value, with the best-performing sub-criteria relating to the organization’s reputation and the agreement signed. The study concludes that EMBRAPII needs to improve in areas such as adapting to change, the adequacy of its proposals for distinct types of partnership, and social media positioning. However, the contracting organizations generally support EMBRAPII’s direction and proposed solutions.