In recent years, it has been found that the service life of cemented carbide shield machine tools used in uneven soft and hard strata is substantially reduced in engineering practice. The study found that thermal stress is the main reason for the failure of cemented carbide shield tunneling tools when shield tunneling is carried out in uneven soft and hard soil. To maintain the hardness of cemented carbide, improving the thermal conductivity of the shield machine tool is of great importance for prolonging its service life and reducing engineering costs. In this study, graphene and carbon nanotubes were mixed with WC–Co powder and sintered by spark plasma sintering (SPS). The morphology was observed by scanning electron microscopy (SEM) and energy dispersive X-ray spectroscopy (EDS). The Rockwell hardness, bending strength, and thermal conductivity of the samples were tested. The results show that adding a small amount of graphene or carbon nanotubes could increase the bending strength of the cemented carbide by approximately 50%, while keeping the hardness of the cemented carbide constant. The thermal conductivity of the cemented carbide could be increased by 10% with the addition of 0.12 wt % graphene alone.
The study is based on a section of the Zhengzhou Metro Line 8 quasi-rectangular shield tunnel. Field excavation trials were conducted to analyze the surface settlement patterns caused by the construction of a large-section quasi-rectangular shield tunnel in the rich water sand layer in Zhengzhou. Based on the characteristics of the rich water sand layer, ground settlement control measures were proposed. The research findings show that the surface settlement caused by the construction of the large-section quasi-rectangular shield tunnel in the rich water sand layer exhibits a temporal curve pattern of slow settlement (Stage I: pre-arrival of the shield), rapid settlement (Stage II: shield passage, Stage III: shield tail exiting 14.4 ~ 18 m), and stable settlement (Stage IV: late settlement). In Stage I, controlling the excavation rate to maintain balance between the cutter face pressure and soil pressure is effective. In Stage II, injecting lubricating mud between the shell and the sand layer to reduce soil friction and shear slip is recommended. In Stage III, increasing the synchronous grouting volume at the shield tail and adjusting grouting pressure, as well as timely filling the shield tail construction gap, are effective methods to reduce surface settlement. The Peck formula was used to fit the transverse settlement trough on the surface, with a linear correlation coefficient R²=0.983, validating the use of the Peck formula to predict surface settlement troughs for quasi-rectangular shield tunneling in the rich water sand layer. These research findings can provide data support and reference for similar projects.
In recent years, it has been found in engineering practice that the service life of cemented carbide shield machine tools used in uneven soft and hard strata is substantially reduced. The study found that thermal stress is the main reason for the failure of cemented carbide shield tunneling tools when shield tunneling is carried out in uneven soft and hard soil. To maintain the hardness of cemented carbide, improving the thermal conductivity of the shield machine tool is of great importance for prolonging its service life and reducing engineering costs. In this paper, graphene and carbon nanotubes were mixed with WC-Co powder and sintered by SPS (Spark Plasma Sintering). The morphology was observed by using scanning electron microscopy (SEM) and energy dispersive X-ray spectroscopy (EDS). A Rockwell hardness tester and bending strength tester were used to test hardness, bending strength and thermal conductivity. The results show that adding trace graphene or carbon nanotubes can increase the bending strength of the cemented carbide by approximately 50% while keeping the hardness of the cemented carbide unchanged. The thermal conductivity of the cemented carbide can be increased by 10% with the addition of 0.12% graphene alone.
The effects on the upper masonry structure and the construction parameters of shield cutting piles were studied during shield construction, focusing on a shield interval of Zhengzhou Metro Line 5. The study utilized the actual engineering case of left and right double-lane shields superimposed on cutting cement soil group pile composite foundations beneath masonry structures. Findings revealed that masonry structures within approximately 30 m (5.0 times the tunnel diameter) were impacted before and after shield cut pile construction, resulting in deflection and twisting deformations of houses along the central axes of the left and right tunnel lines. Implementation of “clay shock” grouting outside the shield shell, radial grouting through small conduits, shield tail synchronous grouting, and secondary reinforcement grouting effectively mitigated the disturbance caused by shield construction to the ground. When shield cut piles passed beneath masonry structures, pressure on the soil chamber, total thrust, and cutterhead speed were consistently controlled. Furthermore, the cutterhead torque was appropriately reduced, and slurry injection volume increased, contributing to better control of house settlement.
This paper is based on a large cross-section quasi-rectangular shield tunnel project on Zhengzhou Metro Line 8, where field excavation tests were conducted to study the ground deformation patterns induced by quasi-rectangular shield tunneling through in-situ monitoring. The research results demonstrate that surface settlement can be divided into three distinct phases according to the spatial relationship between the shield cutterhead and monitoring sections: a slow uplift period, a rapid settlement period, and a gentle settlement period. Similarly, the stratified ground settlement is also influenced by the spatial position relationship between the shield and monitoring points, with the primary stratified settlement occurring after the shield machine moves away from the shield tail. The transverse settlement trough distribution of the ground surface tends to be symmetrical and approximately follows the Peck curve distribution.
This article is based on the large-section quasi-rectangular shield tunnel project of Zhengzhou Metro Line 8 in a water-rich sandy stratum. It systematically analyzes the deformation characteristics of existing underground pipelines and power-tunnels caused by quasi-rectangular shield construction through on-site monitoring. The research results show that shield tunneling induces stress redistribution in the surrounding soil, leading to varying degrees of deformation in underground pipelines and power-tunnels. Factors such as pipeline functionality, structural configuration, material properties, burial depth, and their relative position relative to the shield machine significantly influence deformation patterns. The deformation mode of the power-tunnel differs from that of pipelines, while also being significantly affected by shield construction parameters. Furthermore, this study explores key deformation control technologies and measures, providing valuable insights for similar projects.