Prefabrication of steel-concrete composite decks can improve their competitiveness and sustainability. This paper presents recent studies of longitudinal shear connection at the University of Belgrade, Faculty of Civil Engineering. Grouped welded headed studs and bolted shear connectors, suitable for prefabricated composite construction, has been examined in push-out tests. Totally 30 tests were conducted, and advanced FEA were made using Abaqus/Explicit dynamic solver. Based on the experimental and numerical studies behaviour those two shear connectors are compared.
Prefabricated steel and concrete composite decks are an interesting option to improve competitiveness and sustainability of the composite structures. Longitudinal shear connection is usually established by grouped headed studs, but possible alternative solution is to use bolted shear connectors. Welded headed studs and bolts (grade 8.8) are experimentally examined in the push-out tests (four tests on each). The same arrangement and dimensions of shear connectors (16 mm diameter and 100 mm height above flange) are considered and their resistances and behaviour are compared. Experimental results showed that headed studs and bolted shear connectors have similar shear resistance, while headed studs are more ductile. FEA is performed by ABAQUS/Explicit solver with damage material models to get more insight into behaviour of the specimens. FEA shows rather good agreement with experimental results. Influence of the bolt to hole clearance on the behaviour of specimens with bolted shear connectors is analysed and discussed.
The bridge is situated on the major international electrified railroad line No 2 (Belgrade-Budapest) and designed for to railway tracks (160 km/h), two road lanes and two footpaths, with the total width of 31,5 m. The bridge structure consists of four structures: two approach composite bridges at the banks and two steel tied network arch bridges over the river. The spans are 27,0 +177,0 + 3,0 + 219,0 + 48,0 m, totally 474,0 m in length. The heights of arches are 34,0 m and 42,0 m respectively. The arches and ties, as well as the girders of the approach spans, are steel box girders. The decks of the arch bridges are the composite reinforced concrete slabs with thickness of 300 mm. The launching itself is very complex and unique, in both analysis and construction. The arch bridges are fully assembled on the banks and launched by platforms and skids over the bank and by barges over the river, to the final position on piers.